05000293/FIN-2017405-01

From kanterella
Revision as of 22:18, 16 November 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
01
Site: Pilgrim
Report IR 05000293/2017405 Section 3S01
Date counted Sep 30, 2017 (2017Q3)
Type: NCV: Green
cornerstone Physical Protection
Identified by: NRC identified
Inspection Procedure: IP 71130.01
Violation of: 10 CFR 73, PHYSICAL PROTECTION OF PLANTS AND MATERIALS
CCA P.3, Resolution
INPO aspect PI.3
'