Letter Sequence Other |
---|
|
Results
Other: 0CAN019160, Additional Questions Associated with Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-Basis External Events, 0CAN021406, Units 1 and 2, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051), 1CAN041501, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation, 2CAN011601, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation, 2CAN081504, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051), ML14246A209
|
MONTHYEAR0CAN021406, Units 1 and 2, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)2014-02-27027 February 2014 Units 1 and 2, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) Project stage: Other ML14246A2092014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) Project stage: Other 1CAN041501, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation2015-04-14014 April 2015 Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation Project stage: Other 2CAN081504, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) Project stage: Other 2CAN011601, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation2016-01-12012 January 2016 Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Level (SFP) Instrumentation Project stage: Other 0CAN019160, Additional Questions Associated with Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-Basis External Events2016-09-0101 September 2016 Additional Questions Associated with Notification of Full Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-Basis External Events Project stage: Other ML16224A1062016-09-19019 September 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Approval 2015-08-28
[Table View] |
|
---|
Category:Letter type:
MONTHYEAR2CAN072401, Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02)2024-07-19019 July 2024 Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) 0CAN072401, Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes2024-07-0808 July 2024 Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 0CAN062403, Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels2024-06-25025 June 2024 Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels 0CAN062402, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-06-0606 June 2024 Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 0CAN052401, – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 20232024-05-13013 May 2024 – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 1CAN052401, Cycle 32 Core Operating Limits Report2024-05-0404 May 2024 Cycle 32 Core Operating Limits Report 2CAN042403, Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C2024-04-24024 April 2024 Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C 0CAN042402, Annual Occupational Radiation Exposure Report for 20232024-04-23023 April 2024 Annual Occupational Radiation Exposure Report for 2023 0CAN042401, Radioactive Effluent Release Report for the 2023 Calendar Year2024-04-15015 April 2024 Radioactive Effluent Release Report for the 2023 Calendar Year 2CAN042402, Special Report of Non-functional Main Steam Line Radiation Monitor2024-04-11011 April 2024 Special Report of Non-functional Main Steam Line Radiation Monitor 2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024 Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2024-07-08
[Table view] Category:Status Report
MONTHYEAR0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc ML22034A7992022-01-31031 January 2022 IR 8 Baseline Inspection Completion ML21084A8092021-03-25025 March 2021 Entergy Operations, Inc - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report IR 05000313/20170062018-03-0101 March 2018 Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2017006 and 05000368/2017006) CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report 2CAN081504, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) 0CAN081503, Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) (Order EA-12-049)2015-08-28028 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) (Order EA-12-049) 0CAN021503, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)2015-02-24024 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) 0CAN021502, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)2015-02-24024 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) ML14246A2092014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) 0CAN081402, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees)2014-08-28028 August 2014 Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Bdbees) 0CAN021406, Units 1 and 2, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)2014-02-27027 February 2014 Units 1 and 2, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051) 0CAN021405, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049)2014-02-27027 February 2014 Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order EA-12-049) CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report - Entergy Operations, Inc CNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc2012-10-15015 October 2012 Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc CNRO-2007-00018, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc. for Year Ending December 31, 2006 - 10 CFR 50.75(f)(1)2007-03-29029 March 2007 Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc. for Year Ending December 31, 2006 - 10 CFR 50.75(f)(1) CNRO-2005-00028, Entergy Operations, Inc., Status of Decommissioning Funding Report Refilling2005-05-0505 May 2005 Entergy Operations, Inc., Status of Decommissioning Funding Report Refilling CNRO-2005-00022, Entergy Operations, Inc., Status of Decommissioning Funding Report2005-03-31031 March 2005 Entergy Operations, Inc., Status of Decommissioning Funding Report ML0504505832004-05-0303 May 2004 E-mail Dated 05/03/2005 Status of 1R18 Head/Alloy 600 Inspections ML0506301492004-04-13013 April 2004 Enforcement Action Tracking System, Arkansas Nuclear 1 ML0403604112004-01-14014 January 2004 Riv Status of Fire Protection Inspections ML0230501892002-10-17017 October 2002 Attachment 16, ANO-1, 1R17 Steam Generator Status Report ML0226002922002-09-17017 September 2002 Memorandum Regarding Report on the Status of Open TIAs Assigned to NRR ML0224008422002-04-11011 April 2002 Advisory Committee on Reactor Safeguards 491st Meeting CRDM Penetration Cracking & RPV Head Degradation Room T-2B3, 11545 Rockville Pike, Rockville, MD, 04/11/2002 - Status Report ML0224007982002-02-0101 February 2002 E-mail from Beth Wetzel Bulletin 2001-01 Status Report ML0224007812002-01-18018 January 2002 E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report 2023-06-26
[Table view] |
Text
0CAN021406 February 27, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051)
Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6
REFERENCES:
- 1. NRC Order Number EA-12-051, Order to Modify Licenses with Regard to Reliable SFP Instrumentation , dated March 12, 2012 (0CNA031207) (ML12054A679)2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Reliable SFP Instrumentation , Revision 0, dated August 29, 2012 (ML12221A339)3. Nuclear Energy Institute (NEI) 12-02, Industry Guidance for Compliance with NRC Order EA-12-051
,"To Modify Licenses with Regard to Reliable SFP Instrumentation
," Revision 1, dated August 2012 (ML12240A307)4. Entergy letter to NRC, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses withRegard to Requirements for Reliable SFP Instrumentation (Order Number EA-12-051), dated October 26, 2012 (0CAN101204)(ML12305A274)5. Entergy letter to NRC, Overall Integrated Plan (OIP) in Responseto March 12, 2012, Commission Order Modifying License withRegard to Reliable SFP Instrumentation (Order Number EA-12-051), dated February 28, 2013 (0CAN021303)(ML13063A015)Entergy Operations, Inc.
1448 S.R. 333Russellville, AR 72802 Tel 479-858-3110Jeremy G. Browning Site Vice President Arkansas Nuclear One 0CAN021406 Page 2 of 36. Entergy letter to NRC , First Six-Month Status Report in Responseto March 12, 2012, Commission Order Modifying Licenses withRegard to Reliable SFP Instrumentation (Order Number EA-12-051), dated August 28, 2013 (0CAN081303)
Dear Sir or Madam:
On March 12, 2012, the NRC issued an order (Reference 1) to Entergy Operations, Inc.(Entergy). Reference 1 was immediately effective and directs Entergy to install reliable SFP level instrumentation. Specific requirements are outlined in Attachment 2 of Reference 1.
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an OIP pursuant to Section IV, Condition C. Reference 2 endorses industry guidance document NEI 12-02, Revision 1 (Reference 3). Reference 4 provided the initial status report regarding SFP instrumentation, and Reference 5 provided the OIP.
Reference 1 requires submission of a status report at six-month intervals following submittal of the OIP. Reference 3 provides direction regarding the content of the status reports. Reference 6 provided the first six-month status report. The purpose of this letter is to provide the second six-month status report pursuant to Section IV, Condition C.2, of Reference 1, that delineates progress made in implementing the requirements of Reference 1. The attached report provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief and the basis, if any.
This letter contains no new regulatory commitments. Should you have any questions regarding this submittal, please contact Stephenie Pyle at 479.858.4704.
I declare under penalty of perjury that the foregoing is true and correct; executed on February 27, 2014.
Sincerely, Original signed by Jeremy G. Browning JGB/nbm
Attachment:
Arkansas Nuclear One Units 1 and 2 Second Six Month Status Report forthe Implementation of Order EA-12-051, Order to Modify Licenses with Regard to Reliable SFP Instrumentation 0CAN021406 Page 3 of 3cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Alan Wang MS O-88B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Attn: Mr. Michael Orenak MS O-8G9A One White Flint North 11555 Rockville Pike Rockville, MD 20852 Attachment to 0CAN021406 Arkansas Nuclear One (ANO) Units 1 and 2 (ANO-1 and ANO-2) Second Six Month Status Report for the Implementation of Order EA-12-051, Order to Modify Licenses with Regard to Reliable Spent Fuel Pool (SFP) Instrumentation Attachment to 0CAN021406 Page 1 of 5 ANO-1 and ANO-2 Second Six Month Status Report for the Implementation ofOrder EA-12-051, Order to Modify Licenses with Regard to Reliable SFP Instrumentation
- 1. IntroductionEntergy Operations, Inc. developed an overall integrated plan (OIP) provided via Reference 1 for ANO-1 and ANO-2, documenting the requirements to install reliable SFP instrumentation (SFPI), in response to Reference 2. This attachment provides an update of milestone accomplishments since the last status report, including any changes to the compliance method, schedule, or need for relief/relaxation and the basis, if any.2. Milestone Accomplishments The following milestone(s) have been completed since August 28, 2013, and are current as of January 31, 2014: Although not part of the original milestone schedule, the NRC Interim Safety Evaluation (ISE) was received October 29, 2013 (Reference 3). The ISE included 17 requests for additional information (RAIs) for the NRC to complete itsreview. The NRC clarified during the November 26, 2013, public meeting that the ISE questions supersede any previous requests for information issued by the Staff concerning the SFP instrumentation (Reference 4). Therefore, the RAIs received June 26, 2013 (Reference 5) are considered superseded by the RAIs contained in the ISE received October 29, 2013.3. Milestone Schedule Status The following provides an update to the milestone schedule to support the OIP. This section provides the activity status of each item and the expected completion date notingany change. The dates are planning dates subject to change as design and implementation details are developed.
Attachment to 0CAN021406 Page 2 of 5 Milestone Target Completion DatefActivity Status Revised Target Completion Date ANO-1 Reliable SFPI Design Modification Package Developed/Issued October 2013 In Progress March 2014 ANO-1 Reliable SFPI Installed 1R25 Early 2015 Refueling Outage Pending ANO-2 Reliable SFPI Design Modification Package Developed/Issued July 2014 In Progress September 2014 ANO-2 Reliable SFPI Installed 2R24 Fall 2015 Refueling Outage Pending NRC RAIs (Received June 26, 2013)
July 25, 2013 Submitted (Superceded)
N/A ISE RAIs (Received October 29, 2013)
September 30, 2014 In Progress fTarget Completion Date is the last submitted date from either the overall integrated plan or previous six-month update.4. Changes to Compliance Method There are no additional changes to the compliance method.5. Need for Relief/Relaxation and Basis for the Relief/RelaxationEntergy expects to comply with the order implementation date and no relief/relaxation is required at this time.6. Open Items from OIP and ISE As discussed in Section 2, Entergy has received an ISE for ANO that includes 17 RAIs.
Responses to the RAIs are due September 30, 2014, and are provided in Section 9 of this six-month status report. The following table provides a status of the RAIs.
Attachment to 0CAN021406 Page 3 of 5 RAI #ANO-1 Response Status ANO-2 Response Status 1 In Progress In Progress 2 In Progress In Progress 3 In Progress In Progress 4 See Section 9 In Progress 5 In Progress In Progress 6 In Progress In Progress 7 In Progress In Progress 8 In Progress In Progress 9 In Progress In Progress 10 In Progress In Progress 11 See Section 9 In Progress 12 In Progress In Progress 13 In Progress In Progress 14 In Progress In Progress 15 In Progress In Progress 16 In Progress In Progress 17 In Progress In Progress7. Potential ISE Impacts There are no potential impacts to the ISE identified at this time except for those identified in Section 6.
Attachment to 0CAN021406 Page 4 of 5
- 8. References 1.OIP in Response to March 12, 2012, Commission Order Modifying Licenses withRegard to Reliable SFP Instrumentation (Order Number EA-12-051), dated February 28, 2013 (0CAN021303) (ML13063A015)2. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Reliable SFP Instrumentation , dated March 12, 2012 (0CNA031207)(ML12054A679) 3.Arkansas Nuclear One, Units 1 and 2 - ISE and RAI Regarding the OverallIntegrated Plan for Implementation of Order EA-12-051, Reliable SFPInstrumentation (TAC NOs. MF0944 and MF0945), dated October 29, 2013 (0CNA101407) (ML13281A502) 4.November 26, 2013, Public Meeting Summary for the Discussion Between the NRC Staff and Industry Concerning Responses to ISEs for SFP Instrumentation
, dated December 26, 2013 (ML13347B030) 5.RAI for the OIP in Response to the Commission Order Modifying Licenses withRegard to Requirements for Reliable SFP Instrumentation (Order Number EA-12-051), dated June 26, 2013 (0CNA061308) (ML13156A313)
Attachment to 0CAN021406 Page 5 of 59. Responses to two of the ISE RAIs for ANO-1:RAI #4: Please provide the results of the evaluation performed to ensure that other hardware stored in the SFP cannot adversely interact with the SFP level instrumentation.
For ANO-1, the new instruments are being mounted in the east and west corners on north side of the SFP to take advantage of missile and debris protection inherent in the corners of the SFP and from SFP curbs and SFP bridge tracks/rails. Current plantprocedures and practices would not result in a need to move spent fuel into these locations either during insertion or removal of spent fuel. Normal activities associated with the SFP racks would not be impacted by mounting the instruments in these locations. An exclusion zone of two square feet around the probe is the minimum clearance required to prevent any tools or devices from disturbing the function of the probe.RAI #11: Please provide the NRC staff with the final configuration of the powersupply source for each channel so that the staff may conclude that the two channels are independent from a power supply assignment perspective.For ANO-1, the primary channel (Instrument Channel 3) 120 volt alternating current (VAC) power is being supplied from Panel RS3, which is a Class 1E inverter-backed panel supplied from 125V direct current (VDC) Bus D01. The backup channel (Instrument Channel 4) 120 VAC power is being supplied from Panel RS4, which is a Class 1E inverter-backed panel supplied from 125 VDC Bus D02.