RAI for Relief Request 16-PDI-5 for Watts Bar 1 and 2, Browns Ferry 1, 2, and 3, and Sequoyah 1 and 2
ML16195A030
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/12/2016
From: Farideh Saba
Plant Licensing Branch II
To: Gerald Williams
Tennessee Valley Authority
References
Download: ML16195A030 (3)


Text

1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Tuesday, July 12, 2016 3:40 PM To:Williams, Gordon Robert (grwilliams1@tva.gov)

Cc:Schrull, Edward Dustin (edschrull@tva.gov); Hammargren, Benjamin John; Rezai, Ali;

Orf, Tracy; Schaaf, Robert; Hon, Andrew

Subject:

RAI for Relief Request 16-PDI-5 for Watts Bar 1 and 2, Browns Ferry 1, 2, and 3, and Sequoyah 1 and 2.

Importance:High Gordon, Please see the following request for additional information (RAI) for Relief Request 16-PDI-5, which Tennessee Valley authority submitted by letter dated May 27, 2016 (Agencywide Document Access and Management System Accession No. ML16151A010) for Watts Bar Nuclear Plant, Units 1 and 2, Browns Ferry Nuclear Plant, Units 1, 2, and 3, and Sequoyah Nuclear Plant, Units 1 and 2. As we agreed, please respond to this RAI by August 5, 2016.

Thanks,

Farideh E. Saba, P.E.

Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447

Mail Stop O-8G9A Farideh.Saba@NRC.GOV REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST 16-PDI-5 REGARDING USE OF ALTERNATE CALIBRATION BLOCK REFLECTOR REQUIREMENTS TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NUMBERS 50-390 AND 50-391 BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 DOCKET NUMBERS 50-259, 50-260, AND 50-296 SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NUMBERS 50-327 AND 50-328

By letter dated May 27, 2016 (Accession Number ML16151A010), Tennessee Valley Authority (the licensee) requested relief from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (ASME Code) in Table III-3430-1 and paragraph (b)(3) of Supplement 1 of Appendix III to Section XI. Relief request 16-PDI-5 pertains to the basic calibration blocks for the calibration of the ultrasonic testing at Watts Bar Nuclear Plant, Units 1 and 2, Browns Ferry Nuclear Plant, Units 1, 2, and 3, and Sequoyah Nuclear Plant, Units 1 and 2.

To complete its review, the NRC staff reques ts the following additional information.

RAI-1 2Section III of Enclosure to the relief request contains Item Numbers B5.130, B9.12, C5.12, and C5.52 that do not exist in Table IWB-2500-1 and Table IWC-2500-1 of Section XI of the ASME Code. Provide the correct Item Numbers for the welds for which relief requested.

Hearing Identifier: NRR_PMDA Email Number: 2939 Mail Envelope Properties (Farideh.Saba@nrc.gov20160712153900)

Subject:

RAI for Relief Request 16-PDI-5 for Watts Bar 1 and 2, Browns Ferry 1, 2, and 3, and Sequoyah 1 and 2. Sent Date: 7/12/2016 3:39:31 PM Received Date: 7/12/2016 3:39:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients: "Schrull, Edward Dustin (edschrull@tva.gov)" <edschrull@tva.gov> Tracking Status: None "Hammargren, Benjamin John" <bjhammargren@tva.gov> Tracking Status: None "Rezai, Ali" <Ali.Rezai@nrc.gov>

Tracking Status: None "Orf, Tracy" <Tracy.Orf@nrc.gov> Tracking Status: None "Schaaf, Robert" <Robert.Schaaf@nrc.gov> Tracking Status: None "Hon, Andrew" <Andrew.Hon@nrc.gov> Tracking Status: None "Williams, Gordon Robert (grwilliams1@tva.gov)" <grwilliams1@tva.gov> Tracking Status: None

Post Office: Files Size Date & Time MESSAGE 1979 7/12/2016 3:39:00 PM

Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: