Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:E-Mail
MONTHYEARML24285A1682024-10-11011 October 2024 Email Response: LTR-24-0212 David Lochbaum Letter - Public Access to Advisory Committee on Reactor Safeguards Materials - Seabrook ASR ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24115A2362024-03-28028 March 2024 Acceptance Review: Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23156A3042023-05-31031 May 2023 Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from Pressure Temperature Limits and Low Temperature Over Pressure Protection Curves ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23066A1892023-03-0303 March 2023 OEDO-22-00419: Email Dated 3-3-2023 to Petitioner on Seabrook ASR Petition ML23066A0892023-02-24024 February 2023 OEDO-22-00419 - Email Dated 02/24/2023 to Petitioner on Seabrook Unit 1 ASR Petition ML23020A9392023-01-19019 January 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements (EPID L-2022-LLA-0183) (Email) ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML22341A0012022-12-0606 December 2022 Acceptance of Requested Licensing Action Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML22333A7452022-11-22022 November 2022 OEDO-22-00419 - Email: C-10 Response on PRB Initial Assessment - C-10 Petition on Seabrook ASR Concrete Degradation ML22287A1472022-10-13013 October 2022 2.026 Petition Screen-in Email ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment ML24285A2022022-07-0202 July 2022 Email Response - LTR-24-0212 - Patricia Skibbee - President C-10 Board of Directors - David Lochbaum ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML22048B5522022-02-17017 February 2022 LTR-22-0010 Reply to Geoff Gilbert Email Concern About Seabrook Station Concrete Degradation ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML22020A2542022-01-20020 January 2022 LTR-22-0010 Geoff Gilbert, E-mail Concern About Seabrook Station Concrete Degradation ML21097A2512021-04-0707 April 2021 Request for Additional Information Regarding Steam Generator Tube Inspection Report Review for RFO 20 (EPID L-2020-LRO-0066) (Email) ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request ML20343A0942020-12-0303 December 2020 Request for Additional Information Regarding Seabrook (COVID-19) Part 73 Force-on-Force Exemption Request (L-2020-LLE-0219) ML20273A2812020-09-22022 September 2020 Acceptance of Requested Licensing Action License Amendment Request to Resolve Non-Conservative Heat Flux Hot Channel Factor Requiments ML20258A1502020-09-14014 September 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding One-Time Change to the AC Sources Operating TS ML20260H4932020-09-11011 September 2020 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Request to Use Later Code Edition of ASME OM Code ML20230A2962020-08-14014 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Allow a One-Time Change to the AC Sources Operating TS ML20167A1842020-06-11011 June 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding TSTF-411 and TSTF-418 (L-2019-LLA-0237) ML20124A0012020-05-0101 May 2020 Cancellation of Call with Seabrook on Steam Generator Tube Inspections ML20114E1592020-04-23023 April 2020 Email and Request for Additional Information Related to Seabrook License Amendment Request to Degraded Voltage Time Delay Setpoint (L-2020-LLA-0012) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101N0932020-04-10010 April 2020 Acceptance of Requested Licensing Action Re Relief Request to Defer ASME Inspections Due COVID-19 (EPIDs L-2020-LLR-0055, -56, and -57) ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 ML20087K8262020-03-27027 March 2020 Upcoming Steam Generator Tube Inservice Inspection ML20063J9792020-02-28028 February 2020 Acceptance of Requested Licensing Action Amendment Request to Revise Degraded Voltage Time Delay Setpoint ML19347C6732019-12-13013 December 2019 Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-418 ML19296D9122019-10-23023 October 2019 NRR E-mail Capture - Request for Additional Information Related to Seabrook Inverter Amendment (L-2019-LLA-0216) ML19295F5422019-10-15015 October 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise Onsite Power Distribution Requirements ML19275G7832019-10-0101 October 2019 Limited Appearance Statement from New Hampshire State Representative, Robert Harb Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6512019-09-27027 September 2019 Limited Appearance Statement from Joanna Hammond Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6542019-09-26026 September 2019 Limited Appearance Statement from Brian Campbell Regarding the Seabrook Station Unit 1 License Amendment Application ML19196A3592019-07-15015 July 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise the Emergency Core Cooling System Accumulator Technical Specifications ML19169A2412019-06-13013 June 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Relief Requests for the Containment Building Spray Pump Flow and Vibration Testing (Epids L-2019-LLR-00 and L-2019-LLR-00) ML19162A0662019-06-0404 June 2019 Reply to Mr. Rick Jakious'S E-mail of 5-29-2019 to Stephen B. Comley Sr., We the People with Attachments ML19112A1782019-04-22022 April 2019 NRR E-mail Capture - Point Beach; Seabrook; Turkey Point - Acceptance of Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML19101A4042019-04-11011 April 2019 NRR E-mail Capture - Point Beach; Seabrook; St. Lucie; Turkey Point - Acceptance of Licensing Action Relief Request to Use Encoded Phased Array Ultrasonic Examination Techniques for Ferritic and Austenitic Welds ML19070A2382019-03-10010 March 2019 LTR-19-0088 Maura Healey, Attorney General, the Commonwealth of Massachusetts, Ltr NextEras Requests for a License Amendment and Twenty-year Extension Prior to Issuance of a Final Decision in Adjudicatory Hearing on Concrete Degradation at 2024-05-24
[Table view] |
Text
1 NRR-PMDAPEm Resource From: Poole, Justin Sent: Tuesday, September 05, 2017 10:52 AM To: Browne, Kenneth Cc: Danna, James
Subject:
SEABROOK STATION UNIT NO. 1 - ACCEPT ANCE OF REQUESTED LICENSING ACTION RE: CHANGE TO TECHNICAL SPECIFICAT ION REQUIREMENT FOR DC BATTERIES (CAC NO. MG0046)
SUBJECT:
SEABROOK STATION UNIT NO. 1 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: CHANGE TO TECHNICAL SPECIFICATION REQUIREMENT FOR DC BATTERIES (CAC NO. MG0046)
By letter dated July 28, 2017, NextEra Energy Seabrook, LLC submitted a license amendment request for Seabrook Station Unit No. 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> to complete. The NRC staff expects to complete this review by your requested date of August 1, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
Justin C. Poole Project Manager NRR/DORL/LPL I U.S. Nuclear Regulatory Commission (301)415-2048
Hearing Identifier: NRR_PMDA Email Number: 3707 Mail Envelope Properties (Justin.Poole@nrc.gov20170905105100)
Subject:
SEABROOK STATION UNIT NO. 1 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: CHANGE TO TECH NICAL SPECIFICATION REQUIREMENT FOR DC BATTERIES (CAC NO. MG0046)
Sent Date: 9/5/2017 10:51:52 AM Received Date: 9/5/2017 10:51:00 AM From: Poole, Justin Created By: Justin.Poole@nrc.gov
Recipients: "Danna, James" <James.Danna@nrc.gov> Tracking Status: None "Browne, Kenneth" <Kenneth.J.Browne@nexteraenergy.com> Tracking Status: None
Post Office: Files Size Date & Time MESSAGE 2737 9/5/2017 10:51:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: