|
---|
Category:Technical Specification
MONTHYEARML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23103A3302023-04-13013 April 2023 Submittal of Changes to Technical Specifications Bases JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls ML19158A3122019-06-0707 June 2019 License Amendment Request to Revise Technical Specifications 3.8.4, DC Sources - Operating ML19141A1012019-05-21021 May 2019 Summary of Exelon'S Proposal for Implementation of TSTF-500-Technical Specification Changes ML18213A2712018-08-0101 August 2018 Application to Revise Technical Specifications to Adopt TSTF-500, Revision 2, DC Electrical Rewrite Update to TSTF-360, - Supplement 1, Revision of Implementation Dates. ML18172A2832018-06-21021 June 2018 Emergency License Amendment Request - One-Time Change Suspending Emergency Diesel Generator Surveillance Test Completion Requirements ML17030A3022017-01-30030 January 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML16224A3422016-08-11011 August 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML15357A2502015-12-23023 December 2015 Application to Revise Technical Specifications to Adopt TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities, Revision 0, Using the Consolidated Line Item Improvement Process ML15349A8002015-12-15015 December 2015 License Amendment Request to Reduce Steam Dome Pressure Specified in the Reactor Core Safety Limits ML15337A4132015-12-0303 December 2015 License Amendment Request to Revise Surveillance Requirement 3.8.1.6 Involving EDG Fuel Oil Transfer ML15299A0842015-10-26026 October 2015 PBAPS MELLLA License Amendment Request - Supplement 7 Revision Regarding Proposed Technical Specifications ML15224B5722015-08-12012 August 2015 Submits Supplement to License Amendment Request Proposed Changes to the Technical Specifications to Address Administrative Control of Secondary Containment Access Openings ML15222B1712015-08-10010 August 2015 License Amendment Request to Revise Technical Specifications Section 5.5.12 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML15133A5002015-04-14014 April 2015 Technical Specifications Bases ML15133A5032015-04-14014 April 2015 Technical Specifications Bases ML15082A2552015-03-23023 March 2015 Response to Request for Additional Information Regarding Proposed License Amendment to Revise Technical Specifications to Adopt TSTF-523 ML15041A3512015-02-0909 February 2015 Response to Request for Additional Information Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Trip and Isolation Function ML14211A0192014-07-25025 July 2014 License Amendment Request Revise Technical Specifications Definition for Recently Irradiated Fuel ML14171A4092014-06-20020 June 2014 Extended Power Uprate License Amendment Request - Supplement 28 Supplemental Information ML14128A1322014-04-10010 April 2014 License No. DPR-56, Technical Specifications Bases, Page Revision Listing ML14128A1312014-04-10010 April 2014 License No. DPR-44, Technical Specifications Bases, Page Revision Listing ML13121A3792013-04-10010 April 2013 Technical Specifications Bases ML13121A3782013-04-10010 April 2013 Technical Specifications Bases ML12124A0922012-04-12012 April 2012 PBAPS Unit 3 - License No. DPR-56 Technical Specifications Bases ML12124A0912012-04-12012 April 2012 PBAPS Unit 2 - License No. DPR-44 Technical Specifications Bases ML1115401222011-06-0202 June 2011 License Amendment Request - Reactivity Anomalies Surveillance ML11126A3102011-04-15015 April 2011 Unit Unit 3 Technical Specifications Bases, Page B 3.3-66, Through Page B 3.10-36 ML11126A3092011-04-15015 April 2011 Technical Specifications Bases, Cover Page Through Unit 3 Technical Specifications Bases, Page B 3.3-65 ML1109700672011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1025004972010-04-22022 April 2010 Changes to Technical Specifications Bases ML1025004952010-04-22022 April 2010 Changes to Technical Specifications Bases ML1008407522010-03-24024 March 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System. ML0924400532009-08-28028 August 2009 License Amendment Request - Type a Test Extension ML0922200452009-07-30030 July 2009 License Amendment Request for Adoption of TSTF-478-A, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control, Using the Consolidated Line Item Improvement Process ML0912806092009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0912806082009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0824908352008-09-0505 September 2008 Amendment 273 Application of Alternative Source Term Methodology ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0819704612008-07-14014 July 2008 AST Response - Reconciliation of Technical Specifications Page Changes RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im ML0813503632008-04-28028 April 2008 Changes to Technical Specifications Bases ML0813503662008-04-28028 April 2008 Changes to Technical Specifications Bases ML0735400492007-12-19019 December 2007 Letter to C. Pardee Correction of Administrative Error in Amendment - the Consistency of TSs to Exelon Generation Company Quality Assurance TR (Tac. MD3937 Thru MD3940 and MD3943 Thru MD3948). - Rplacement Pages 2024-04-15
[Table view] Category:Bases Change
MONTHYEARML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML23103A3302023-04-13013 April 2023 Submittal of Changes to Technical Specifications Bases JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML19158A3122019-06-0707 June 2019 License Amendment Request to Revise Technical Specifications 3.8.4, DC Sources - Operating ML19141A1012019-05-21021 May 2019 Summary of Exelon'S Proposal for Implementation of TSTF-500-Technical Specification Changes ML18213A2712018-08-0101 August 2018 Application to Revise Technical Specifications to Adopt TSTF-500, Revision 2, DC Electrical Rewrite Update to TSTF-360, - Supplement 1, Revision of Implementation Dates. ML17030A3022017-01-30030 January 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 ML16224A3422016-08-11011 August 2016 Response to Request for Additional Information Regarding Proposed License Amendment Concerning Diesel Generator Lube Oil Inventory (TSTF-501-A) for Peach Bottom Atomic Power Station, Units 2 and 3 ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. ML15357A2502015-12-23023 December 2015 Application to Revise Technical Specifications to Adopt TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities, Revision 0, Using the Consolidated Line Item Improvement Process ML15349A8002015-12-15015 December 2015 License Amendment Request to Reduce Steam Dome Pressure Specified in the Reactor Core Safety Limits ML15337A4132015-12-0303 December 2015 License Amendment Request to Revise Surveillance Requirement 3.8.1.6 Involving EDG Fuel Oil Transfer ML15299A0842015-10-26026 October 2015 PBAPS MELLLA License Amendment Request - Supplement 7 Revision Regarding Proposed Technical Specifications ML15133A5002015-04-14014 April 2015 Technical Specifications Bases ML15133A5032015-04-14014 April 2015 Technical Specifications Bases ML14211A0192014-07-25025 July 2014 License Amendment Request Revise Technical Specifications Definition for Recently Irradiated Fuel ML14171A4092014-06-20020 June 2014 Extended Power Uprate License Amendment Request - Supplement 28 Supplemental Information ML14128A1322014-04-10010 April 2014 License No. DPR-56, Technical Specifications Bases, Page Revision Listing ML14128A1312014-04-10010 April 2014 License No. DPR-44, Technical Specifications Bases, Page Revision Listing ML13121A3792013-04-10010 April 2013 Technical Specifications Bases ML13121A3782013-04-10010 April 2013 Technical Specifications Bases ML12124A0922012-04-12012 April 2012 PBAPS Unit 3 - License No. DPR-56 Technical Specifications Bases ML12124A0912012-04-12012 April 2012 PBAPS Unit 2 - License No. DPR-44 Technical Specifications Bases ML1115401222011-06-0202 June 2011 License Amendment Request - Reactivity Anomalies Surveillance ML11126A3102011-04-15015 April 2011 Unit Unit 3 Technical Specifications Bases, Page B 3.3-66, Through Page B 3.10-36 ML11126A3092011-04-15015 April 2011 Technical Specifications Bases, Cover Page Through Unit 3 Technical Specifications Bases, Page B 3.3-65 ML1109700672011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1025004952010-04-22022 April 2010 Changes to Technical Specifications Bases ML1025004972010-04-22022 April 2010 Changes to Technical Specifications Bases ML0912806082009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0912806092009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/08/2009 ML0813503662008-04-28028 April 2008 Changes to Technical Specifications Bases ML0813503632008-04-28028 April 2008 Changes to Technical Specifications Bases RS-07-044, Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program2007-08-0808 August 2007 Amergen Energy Company, LLC, Request for Amendment to Technical Specifications Section for the Inservice Testing Program ML0713602242007-04-27027 April 2007 Technical Specifications Bases - License No DPR-44 ML0713602352007-04-27027 April 2007 Technical Specifications Bases - License No. DPR-56 RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0612804782006-04-24024 April 2006 PBAPS Unit 3 - Technical Specifications Bases Page Revision Listing ML0612805382006-04-24024 April 2006 PBAPS Unit 2 - Technical Specifications Bases Page Revision Listing ML0514004382005-05-0202 May 2005 Improved Technical Specifications (Unit 3 Bases) ML0514004362005-05-0202 May 2005 Improved Technical Specifications (Unit 2 Bases) ML0504000832005-01-21021 January 2005 Supplement to the Request for License Amendments Related to Application of Alternative Source Term, Dated July 14, 2003 ML0413800892004-04-30030 April 2004 Submittal of Changes to Technical Specifications Gases ML0211902302002-04-19019 April 2002 Part H - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901742002-04-19019 April 2002 Part G - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901312002-04-19019 April 2002 Part F - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901172002-04-19019 April 2002 Part E - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211901072002-04-19019 April 2002 Part D - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211900622002-04-19019 April 2002 Part C - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 ML0211900242002-04-19019 April 2002 Part B - Submittal of All Peach Bottom Atomic Power Station Unit 2 & Unit 3 Technical Specifications Bases Changes Through Unit 2 Bases Revision 39 & Unit 3 Bases Revision 40 2024-04-15
[Table view] |
Text
Summary of Exelon's Proposal for Implementation of TSTF-500-Technical Specification Changes The proposed changes modify the wording in TS Limiting Condition for Operation (LCO) 3.8.4, DC Sources -Operating to add an additional LCO for the opposite Unit's inoperable battery charger condition.
The proposed changes are required to fix simultaneous conflicting LCO Required Action Completion Times of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for one unit and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for the other unit for a single inoperable battery charger on one Unit. The current conflicting concurrent 12-hour and 72-hour Completion Times for Unit 2 and Unit 3 for one unit's inoperable battery charger was an unidentified imbedded error incorporated under TS Amendments 320 and 323, which adopted TSTF-500.
Please see attached Technical Specification proposed markups for Unit 2 and Unit 3, respectively.
DC Sources
-Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS
3.8.4 DC Sources
-Operating LCO 3.8.4 The following DC electrical power subsystems shall be
OPERABLE:
- a. Unit 2 Division I and Division II DC electrical power
subsystems; and
- b. Unit 3 Division I and Division II DC electrical power
subsystems.
APPLICABILITY:
MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
A. One Unit 3 DC
electrical power
subsystem inoperable due to performance of
SR 3.8.4.7 or SR 3.8.6.6.
NOTE------------
Enter applicable Conditions and Required Actions of LCO 3.8.7, "Distribution
Systems-Operating," when Condition A results in
de-energization of a Unit 2 4 kV emergency bus or de-energization of a Unit 3 DC bus.
A.1 Restore Unit 3 DC electrical power
subsystem to OPERABLE
status.
7 days (continued)
PBAPS UNIT 2 3.8-28 Amendment No.
DC Sources
-Operating 3.8.4
ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One Unit 3 battery charger on one subsystem inoperable.
B.1 Restore Unit 3 battery terminal voltage to greater than or equal to the minimum established float voltage.
AND B.2 Verify battery float current < 2 amps.
AND B.3 Restore battery charger to OPERABLE status.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (continued)
PBAPS UNIT 2 3.8-28 a Amendment No.
DC Sources
-Operating 3.8.4
ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B C. One Unit 3 DC electrical power subsystem inoperable for reasons other than Condition A or B.
NOTE------------
Enter applicable Conditions
and Required Actions of LCO 3.8.7, "Distribution
Systems-Operating," when Condition B results in
de-energization of a Unit 2 4 kV emergency bus.
B C.1 Restore Unit 3 DC electrical power subsystem to OPERABLE status.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C D. On e Unit 2 battery charger on one subsystem inoperable
. C D.1 Restore Unit 2 battery terminal voltage to greater than or equal to the minimum established float voltage.
AND C D.2 Verify battery float current < 2 amps. AND C D.3 Restore battery charger to OPERABLE status. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />
Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 72 hours (continued)
PBAPS UNIT 2 3.8-29 Amendment No.
DC Sources
-Operating 3.8.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D E. One Unit 2 DC electrical power
subsystem inoperable f or re asons other than condition C D.
D E.1 Restore Unit 2 DC electrical power
subsystem to OPERABLE
status.
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> E F. Required Action and Associated Completion Time of Condition A, B, C , D, or E not met. E F.1 Be in MODE
- 3. AND D F.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F G. Two or more inoperable DC electrical power subsystems.
F G.1 Enter LCO 3.0.3.
Immediately
PBAPS UNIT 2 3.8-29 a Amendment No.
D C Sources-Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS
3.8.4 DC Sources
-Operating LCO 3.8.4 The following DC electrical power subsystems shall be
OPERABLE:
- a. Unit 3 Division I and Division II DC electrical power
subsystems; and
- b. Unit 2 Division I and Division II DC electrical power
subsystems.
APPLICABILITY:
MODES 1, 2, and 3. ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME
A. One Unit 2 DC
electrical power
subsyst em inoperable
due to performance of
SR 3.8.4.7 or SR 3.8.6.6.
NOTE------------
Enter applicable Conditions and Required Actions of LCO 3.8.7, "Distribution
Systems-Operating," when Condition A results in
de-energization of a Unit 3 4 kV emergency bus or de-energization of a Unit 2 DC bus.
A.1 Restore Unit 2 DC electrical power
subsystem to OPERABLE
status.
7 days (continued)
PBAPS UNIT 3 3.8-28 Amendme nt No.
DC Sources
-Operating 3.8.4
ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One Unit 2 battery charger on one subsystem inoperable.
B.1 Restore Unit 2 battery terminal voltage to greater than or equal to the minimum established float voltage
. AN D B.2 Verify battery float current < 2 amps. AN D B.3 Restore battery charger to OPERABLE status. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (continued)
PB APS UNIT 3 3.8-28a Amendment No.
DC Sources
-Operating 3.8.4
ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B C. One Unit 2 DC electrical power
subsystem inoperable
for reasons other than
Condition A or B.
NOTE------------
Enter applicable Conditions
and Required Actions of LCO
3.8.7, "Distribution
Systems-Operating," when Condition B results in
de-energization of a Unit 3 4 kV emergency bus.
B C.1 Restore Unit 2 DC electrical power
subsystem to OPERABLE
status.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C D. On e Unit 3 battery charger on one subsystem inoperable.
C D.1 Restore Unit 3 battery terminal voltage to greater than or equal to the minimum established float voltage.
AND C D.2 Verify battery float current < 2 amps.
AND C D.3 Restore battery charger to OPERABLE status. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />
Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 72 hours (continued)
PBAPS UNIT 3 3.8-29 Amendment No.
DC Sources
-Operating 3.8.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D E. One Unit 3 DC electrical power
subsystem inoperable
f or reasons other th an conditions C D. D E.1 Restore Unit 3 DC ele ctrical power
subsystem to OPERABLE
status.
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> E F. Required Action and Associated Completion
Time of Condition A, B, C, D, or E not met. E F.1 Be in MODE
- 3. AND E F.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours F G. Two or more inoperable DC elect rical power subsystems.
F G.1 Enter LCO 3.0.3.
Immediately
PBAPS UNIT 3 3.8-29a Amendment No.