IR 05000275/2015402

From kanterella
Revision as of 17:45, 17 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000275/2015402 and 05000323/2015402)
ML16056A170
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/02/2016
From: Haire M S
Plant Support Branch-1
To: Halpin E D
Pacific Gas & Electric Co
References
IR 2015402
Download: ML16056A170 (4)


Text

" " March 2, 2016

Mr. Edward D. Halpin, Senior Vice President

and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000275/2015402 AND 05000323/2015402)

Dear Mr. Halpin:

On February 16, 2016, the NRC completed its end-of-cycle performance review of Diablo Canyon Nuclear Power Plant, Units 1 and 2. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking, and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/ Mark S. Haire, Chief Plant Support Branch 1

Division of Reactor Safety

Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82

Enclosure:

Inspection Plan

ML16056A170 Letter w/encl: SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 Non-Public A.3 Letter w/o encl:

SUNSI Review By: MHaire ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE C:PSB1 C:DRP/A C:PSB1 NAME MHaire/dch JGroom MHaire SIGNATURE /RA/ /RA/ /RA/ DATE 2/18/16 2/19/16 3/2/16 Letter to Edward from Mark S. Haire, dated March 2, 2016

SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000275/2015402 AND 05000323/2015402)

Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov) Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)

Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Acting Senior Resident Inspector (Binesh.Tharakan@nrc.gov)

Resident Inspector (John.Reynoso@nrc.gov)

Administrative Assistant (Madeleine.Arel-Davis@nrc.gov) Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Matthew.Kirk@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Distribution w/o enclosure: Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Siva.Lingam@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Raj.Iyengar@nrc.gov)

R4Allegation Resource SAIC (Gayle.Walker@nrc.gov)

RSLO (Bill.Maier@nrc.gov)

RidsOeMailCenter Resource ROPreports Resource