August 9, 2010 Mr. James H. Riley, Director Engineering Nuclear Energy Institute Suite 400 1776 I Street, NW Washington, DC 20006-3708
SUBJECT:
FINAL SAFETY EVALUATION FOR NUCLEAR ENERGY INSTITUTE TOPICAL REPORT MATERIALS RELIABILITY PROGRAM (MRP): TECHNICAL BASIS FOR PREEMPTIVE WELD OVERLAYS FOR ALLOY 82/182 BUTT WELDS IN PRESSURIZED WATER REACTORS (MRP-169) (TAC NO. MD8005)
Dear Mr. Riley:
By letter dated September 7, 2005, the Nuclear Energy Institute (NEI) submitted Topical Report (TR) Material Reliability Program (MRP): Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in Pressurized Water Reactors (MRP-169), Revision 0, to the U.S. Nuclear Regulatory Commission (NRC) staff for review. In a letter to NEI dated April 26, 2007, the NRC discontinued its review of TR MRP-169, Revision 0. After an August 23, 2007, public pre-submittal meeting with the NRC staff, the NEI and the Electric Power Research Institute stated that they would submit the necessary documentation to re-initiate the NRC's review of TR MRP-169, Revision 0. By letter dated January 9, 2008, NEI re-submitted for NRC staff review TR MRP-169, Revision 0. The transmittal memo for the January 9, 2008, letter from NEI states that this document is considered to be non-proprietary.
By letters dated August 3, 2006 and April 7, 2008, the NRC staff issued a request for additional information (RAI) to NEI to support the review of TR MRP-169. By letters dated January 9, 2008, May 2, 2008, March 2, 2009, November 30, 2009, and February 3, 2010, NEI responded to the NRC staff's RAIs and provided supplemental information in support of the NRC staff's review of TR MRP-169.
By letter dated March 25, 2010, an NRC draft safety evaluation (SE) regarding our approval of TR MRP-169, Revision 1, was provided for your review and comment. By letters dated April 23, 2010 and June 9, 2010, NEI commented on the draft SE. The NRC staff's disposition of NEI's comments on the draft SE are discussed in the attachment to the final SE enclosed with this letter.
The NRC staff has found that TR MRP-169, Revision 1, is acceptable for referencing in licensing applications for pressurized water reactors to the extent specified and under the limitations delineated in the TR and in the enclosed final SE. The final SE defines the basis for our acceptance of the TR.
Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment or relief requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.
In accordance with the guidance provided on the NRC website, we request that NEI publish an accepted version of this TR within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed final SE after the title page. Also, the accepted version must contain historical review information, including NRC requests for additional information (RAI) and your responses after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification symbol.
By letter dated March 2, 2009, NEI stated that once the final SE was complete, all relevant information would be incorporated into TR MRP-169, Revision 2, which will be submitted to the NRC as the accepted version of this TR.
As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TR were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:
- 2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TR. The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TR.
If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.
Sincerely, /RA/ Thomas B. Blount, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689
Enclosure:
Final SE cc w/encl: See next page Our acceptance applies only to material provided in the subject TR. We do not intend to repeat our review of the acceptable material described in the TR. When the TR appears as a reference in license applications, our review will ensure that the material presented applies to the specific plant involved. License amendment or relief requests that deviate from this TR will be subject to a plant-specific review in accordance with applicable review standards.
In accordance with the guidance provided on the NRC website, we request that NEI publish an accepted version of this TR within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed final SE after the title page. Also, the accepted version must contain historical review information, including NRC requests for additional information (RAI) and your responses after the title page. The accepted version shall include an "-A" (designating accepted) following the TR identification symbol.
By letter dated March 2, 2009, NEI stated that once the final SE was complete, all relevant information would be incorporated into TR MRP-169, Revision 2, which will be submitted to the NRC as the accepted version of this TR.
As an alternative to including the RAIs and RAI responses behind the title page, if changes to the TR were provided to the NRC staff to support the resolution of RAI responses, and the NRC staff reviewed and approved those changes as described in the RAI responses, there are two ways that the accepted version can capture the RAIs:
- 2. The RAIs and RAI responses can be captured in the form of a table (inserted after the final SE) which summarizes the changes as shown in the approved version of the TR. The table should reference the specific RAIs and RAI responses which resulted in any changes, as shown in the accepted version of the TR.
If future changes to the NRC's regulatory requirements affect the acceptability of this TR, NEI and/or licensees referencing it will be expected to revise the TR appropriately, or justify its continued applicability for subsequent referencing.
Sincerely, /RA/ Thomas B. Blount, Deputy Director Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project Nos. 669 and 689
Enclosure:
Final SE cc w/encl: See next page DISTRIBUTION
- PUBLIC PLPB Reading File RidsNrrDpr RidsNrrDprPlpb RidsNrrPMTMensah RidsNrrLADBaxley RidsOgcMailCenter RidsAcrsAcnwMailCenter RidsNrrDciCpnb J Tsao T Lupold H Rathbun R Hardies J Collins A Csontos DRudland EXTERNAL DISTRIBUTION:
vka@nei.org ewillis@epri.com ADAMS ACCESSION NO.: NRR-043 ML101620010 (Cover Letter); ML101660468 (Enclosure)
OFFICE PLPB/PM PLPB /LA DCI/CPNB PLPB/BC DPR/DD NAME TMensah EHylton TLupold JJoliceur TBlount DATE 6/ 24/10 6/ 23/10 7/27/10 8/5/10 8/9/10 OFFICIAL RECORD COPY Nuclear Energy Institute Project No. 689 Electric Power Research Institute Project No. 669 cc:Mr. Anthony Pietrangelo, Senior Vice President & Chief Nuclear Officer Nuclear Generation Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 arp@nei.org
Mr. Jack Roe, Director Security Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jwr@nei.org Mr. Charles B. Brinkman Washington Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 brinkmcb@westinghouse.com Mr. James Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355 greshaja@westinghouse.com Ms. Barbara Lewis Assistant Editor Platts, Principal Editorial Office 1200 G St., N.W., Suite 1100 Washington, DC 20005 Barbara_lewis@platts.com Mr. Alexander Marion, Vice President Nuclear Operations Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 am@nei.org Mr. John Butler, Director Operations Support Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 jcb@nei.org Mr. James H. Riley, Director Engineering Nuclear Energy Institute 1776 I Street, NW Washington, DC 20006-3708 jhr@nei.org Mr. Chris Larsen Vice President and Chief Nuclear Officer EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 cblarsen@epri.com
Mr. David J. Modeen Director, External Affairs EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 dmodeen@epri.com Dr. Sean Bushart EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 sbushart@epri.com Mr. Kurt Edsinger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 kedsinge@epri.com
Mr. Ken Canavan EPRI 1300 W.T. Harris Boulevard Charlotte, NC 28262-8550 kcanavan@epri.com Mr. Greg Selby EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 gselby@epri.com Mr. David Steininger EPRI 3412 Hillview Avenue Palo Alto, CA 94304-1338 dsteinin@epri.com Mr. Neil Wilmshurst EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 nwilmshu@epri.com