ML101730329
ML101730329 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 06/22/2010 |
From: | Reyes L A Region 2 Administrator |
To: | Baxter D A Duke Energy Carolinas |
References | |
Download: ML101730329 (7) | |
Text
OFFICIAL USE ONLY
-SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION June 22, 2010 CAL 2-10-003 Mr. David A. Baxter Site Vice President Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672
SUBJECT:
CONFIRMATORY ACTION LETTER - OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 COMMITMENTS TO ADDRESS EXTERNAL FLOODING CONCERNS (TAC NOS. ME3065, ME3066, AND ME3067)
Dear Mr. Baxter:
This letter confirms commitments made by Duke Energy Carolinas, LLC (the licensee) in your June 3, 2010, letter. Specifically, the June 3, 2010, letter listed compensatory measures the licensee will implement at the Oconee Site and Jocassee Dam to mitigate potential external flooding hazards resulting from a potential failure of the Jocassee Dam. The compensatory measures listed in the enclosure shall remain in place until final resolution of the inundation of the Oconee site from the failure of the Jocassee Dam has been determined by the licensee and agreed upon by the U.S. Nuclear Regulatory Commission (NRC), and all modifications are made to mitigate the inundation. The compensatory measures and implementation dates are set forth in the enclosure to this letter.
In addition to implementing the compensatory measures, pursuant to my telephone conversation with Mr. Bill Pitesa of your company on June 22, 2010, you shall submit to the NRC by August 2, 2010, all documentation necessary to demonstrate to the NRC that the inundation of the Oconee site resulting from the failure of the Jocassee Dam has been bounded. Also, you shall submit by November 30, 2010, a list of all modifications necessary to adequately mitigate the inundation, and shall make all necessary modifications by November 30, 2011.
Pursuant to Section 182 of the Atomic Energy Act, 42 U.S.C. 2232, you are required to:
- 1) Notify me immediately if your understanding differs from that set forth above;
- 2) Notify me if for any reason you cannot complete the actions within the specified schedule and advise me in writing of your modified schedule in advance of the change; and 3) Notify me in writing when you have completed the actions addressed in this Confirmatory Action Letter.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION DEC 2 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Issuance of this Confirmatory Action Letter does not preclude issuance of an Order formalizing the above commitments or requiring other actions on the part of the licensee; nor does it preclude the NRC from taking enforcement action for violations of NRC requirements that may have prompted the issuance of this letter. In addition, failure to take the actions addressed in this Confirmatory Action Letter may result in enforcement action.
This Confirmatory Action Letter will remain in effect until the NRC has concluded that all modifications necessary to adequately mitigate the inundation of the Oconee site from the failure of the Jocassee Dam has been completed.
Sincerely, /RA/
Luis A. Reyes Regional Administrator Docket Nos. 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
Enclosure:
Compensatory Measures cc w/encl: (See next page)
_________________________
G SUNSI REVIEW COMPLETE OFFICE NRR RII:EICS RII:DRP RII:ORA RII:DRP SIGNATURE Via email CFE /RA/ JTM /RA/ VMM /RA/ JHB /RA/ NAME *ELeeds *CEvans *JMunday VMcCree *JBartley DATE 6/21/2010 6/21/2010 6/21/2010 06/22/2010 06/21/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL USE ONLY - SECURITY RELATED INFORMATION DEC 3 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION cc w/encl: David A. Baxter Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672
Richard J. Freudenberger Safety Assurance Manager Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672
Terry W. King Site Security Manager Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 Daniel C. Durham Security Support Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672
Timothy J. Wadsworth Security Specialist Duke Energy Carolinas, LLC P. O. Box 1006 526 S. Church St., EC05P Charlotte, NC 28201-1006 David A. Cummings Assistant General Counsel Duke Energy Corporation P.O. Box 1006 526 S. Church St., EC07H Charlotte, NC 28201-1006 Kent Alter Regulatory Compliance Manager Oconee Nuclear Station Duke Energy Carolinas, LLC ON03RC 7800 Rochester Highway Seneca, SC 29672
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Letter to David A. Baxter from Luis A. Reyes dated June 22, 2010
SUBJECT:
CONFIRMATORY ACTION LETTER - OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 COMMITMENTS TO ADDRESS EXTERNAL FLOODING CONCERNS (TAC NOS. ME3065, ME3066, AND ME3067)
Distribution w/encl
- RidsNrrPMOconee Resource C. Evans, RII L. Slack, RII B. Westreich, NSIR E. McNiel, NSIR OE Mail (email address if applicable) RIDSNRRDIRS
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Enclosure COMPENSATORY MEASURES NUMBER COMPENSATORY MEASURES IMPLEMENTATION STATUS 1 Perform flooding studies using the Hydrologic Engineering Center -- River Complete Analysis System (HEC-RAS) model for comparison with previous DAMBRK models to more accurately represent anticipated flood heights in the west yard following a postulated failure of the Jocassee Dam. Complete 2 Maintain plans, procedures (Jocassee and Oconee) and guidance documents implemented (Oconee) to address mitigation of postulated flood events which could render the Standby Shutdown Facility inoperable and are consistent with current perspectives gained following the HEC-RAS sensitivity studies and the subsequent 2D inundation studies.
To the extent practical, the mitigation strategy is similar to existing extensive plant damage scenario (B.5.b) equipment, methods and criteria. Implemented 3 Duke Energy Hydro Generation will create a guidance document to consolidate river management and storm management processes. (Includes the Jocassee Development and the Keowee Development.) Implemented 4 Maintain a dam safety inspection program that includes: (1) weekly dam safety inspections of the Jocassee Dam by Duke Energy personnel, (2) dam safety inspections following any 2-inch or greater rainfall or felt seismic event, (3) annual dam safety inspections by Duke Energy, (4) annual dam safety inspections by FERC representatives, (5) five year safety inspections by FERC approved consultants, and (6) five year underwater inspections. Implemented 5 Maintain a monitoring program that includes: (1) continuous remote monitoring from the Hydro Central Operating Center in Charlotte, NC, (2) monthly monitoring of observation wells, (3) weekly monitoring of seepage monitoring points, and (4) annual surveys of displacement monuments. Implemented 6 Assign an Oconee engineer as Jocassee Dam contact to heighten awareness of Jocassee status. Implemented 7 Install ammeters and voltmeters on Keowee spillway gates for equipment condition monitoring. Complete 8 Ensure forebay and tailrace level alarms are provided for Jocassee to support timely detection of a developing dam failure. Complete 9 Add a storage building adjacent to the Jocassee spillway to house the backup spillway gate operating equipment (e.g.,
compressor and air wrench). Complete OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION 2 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION Enclosure NUMBER COMPENSATORY MEASURES IMPLEMENTATION STATUS 10 Obtain and stage a portable generator and electric drive motor near the Jocassee spillway gates to serve as a second set of backup spillway gate operating equipment. Complete 11 Conduct Jocassee Dam failure Table Top Exercise with Oconee participation to exercise and improve response procedures. 06/30/2010 12 Instrument and alarm selected seepage monitoring locations for timely detection of degrading conditions. 08/31/2010 13 Provide additional video monitoring of Jocassee Dam (e.g., dam toe, abutments, and groin areas) for timely assessment of degrading conditions. 08/31/2010 14 Obtain and stage a second set of equipment (including a B.5.b-type pump) for implementation of the external flood mitigation guidance. 11/30/2010 15 Conduct Jocassee Dam/Oconee Emergency Response Organization Drill to exercise and improve response procedures. 12/31/2010 NOTES: 1. The word "complete" is used in the status column if the commitment regards a specific one-time equipment-related or analysis-related action that has been completed.
- 2. The word "implemented" is used in the status column if the commitment describes an on-going action that has been implemented.