Letter Sequence Supplement |
|---|
TAC:ME2139, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML093130368, ML102020664, ML102210288, ML102371088, ML102371098, ML102371109, ML102371140, ML102371178, ML102371203, ML102371205, ML102371210, ML102371257, ML102371260, ML102371266, ML102371269, ML102371282, ML102371283, ML102371290, ML102371292, ML102371294, ML102371297, ML102580704, ML102580706, ML102580709, ML102580710, ML102670754, ML102730398, ML102730399, ML103370691, ML103480931, ML110260316
|
MONTHYEARML1027303992009-10-14014 October 2009 Calculation C10818, Revision 0 Kewaunee Unit 1 Pressurizer Pressure Protection Channel Statistical Allowance (Csa) Calculation Project stage: Other ML0931303682009-11-0909 November 2009 Informs That the 8/24/09 Application to Convert Technical Specifications to the ISTS Format Acceptable for Review Project stage: Other ML0931408052009-11-24024 November 2009 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1001312782010-01-13013 January 2010 Draft RAI on Proposed Amendment to Convert TS to ITS Format Project stage: Draft RAI ML1007003002010-03-11011 March 2010 Draft RAI Re. Use of TSTF-490-A in Kewaunees ITS Conversion Project stage: Draft RAI ML1018901762010-07-0101 July 2010 License Amendment Request 249: Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 3, 4, 5, 6, 9, 11, and 15 and Proposed License Conditions Project stage: Supplement ML1018902142010-07-0101 July 2010 Attachment 1, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Kewaunee ITS Submittal, Volumes 3, 4, 5, 6, 9, 11, and 15, Revision 1, Cover Page Project stage: Request ML1018902242010-07-0101 July 2010 Attachment 2, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Proposed New License Conditions Project stage: Request ML1018902262010-07-0101 July 2010 Attachment 3, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplemental Information for the Enclosure Project stage: Supplement ML1018902312010-07-0101 July 2010 Enclosure, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Associated NRC Staff Requests for Additional Information and Dominion Energy Kewaunees Responses Project stage: Request ML1023703862010-07-16016 July 2010 Enclosure, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 16, Associated NRC Staff Requests for Additional Information & Kewaunee Project stage: Supplement ML1023703692010-07-16016 July 2010 License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 16 Project stage: Supplement ML1023703852010-07-16016 July 2010 Attachment 2, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 196 Project stage: Supplement ML1023703792010-07-16016 July 2010 Attachment 1, License Amendment Request 249: Kewaunee Power Station Conversion to Improved Technical Specifications (TAC No. ME2139) - Supplement to Volumes 7, 10, 12, and 16 Project stage: Supplement ML1022102972010-07-30030 July 2010 Safety Evaluation for Kewaunee Power Station Improved Technical Specification Conversion License Amendment Request Project stage: Approval ML1022102882010-07-30030 July 2010 Email: ME2139 - Kewaunee TS Conversion - SE for Fact Check Review Project stage: Other ML1023712692010-08-18018 August 2010 Enclosure (7 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023710782010-08-18018 August 2010 Attachment 1, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications Submittal, Volumes 1, 2, 8, 13, and 14, Revision 1, Cover Project stage: Request ML1023710882010-08-18018 August 2010 Attachment 1, Volume 1, Kewaunee Power Station Improved Technical Specifications Conversion, Application of Selection Criteria to Kewaunee Power Station Technical Specifications, Revision 1 Project stage: Other ML1023710982010-08-18018 August 2010 Attachment 1, Volume 2, Kewaunee Power Station Improved Technical Specifications Conversion, Generic Determination of No Significant Hazards Consideration and Environmental Assessment, Revision 1 Project stage: Other ML1023711092010-08-18018 August 2010 Attachment 1, Volume 8, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.3 Instrumentation, Revision 1 Project stage: Other ML1023711402010-08-18018 August 2010 Attachment 1, Volume 13, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.8 Electrical Power Systems, Revision 1 Project stage: Other ML1023711782010-08-18018 August 2010 Attachment 1, Volume 14, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.9 Refueling Operations, Revision 1 Project stage: Other ML1023711852010-08-18018 August 2010 Attachment 2, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Proposed New License Conditions Project stage: Supplement ML1023711912010-08-18018 August 2010 Attachment 3, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Supplemental Information for the Enclosure Project stage: Supplement ML1023712002010-08-18018 August 2010 Enclosure, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Associated NRC Staff Requests for Additional Information and Dominion Energy Kewaunees Responses Project stage: Supplement ML1023712032010-08-18018 August 2010 Enclosure (1 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712052010-08-18018 August 2010 Enclosure (2 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712102010-08-18018 August 2010 Enclosure (3 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712572010-08-18018 August 2010 Enclosure (4 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712602010-08-18018 August 2010 Enclosure (5 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023711972010-08-18018 August 2010 Attachment 4, License Amendment Request 249: Kewaunee Conversion to Improved Technical Specifications, Supplement to Volumes 1, 2, 8, 13, and 14, Commitment List Project stage: Supplement ML1023712822010-08-18018 August 2010 Enclosure (8 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1023712832010-08-18018 August 2010 Enclosure (1 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712902010-08-18018 August 2010 Enclosure (2 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712922010-08-18018 August 2010 Enclosure (3 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712942010-08-18018 August 2010 Enclosure (4 of 4), Q&A to Attachment 1, Volume 13 (Section 3.8) Project stage: Other ML1023712972010-08-18018 August 2010 Enclosure, Q&A to Attachment 1, Volume 14 (Section 3.9) Project stage: Other ML1023710232010-08-18018 August 2010 License Amendment Request 249: Conversion to Improved Technical Specifications Supplement to Volumes 1, 2, 8, 13, and 14 Project stage: Supplement ML1023712662010-08-18018 August 2010 Enclosure (6 of 8), Q&A to Attachment 1, Volume 8 (Section 3.3) Project stage: Other ML1027303812010-09-0707 September 2010 License Amendment Request 249: Kewaunee. Power Station Conversion to Improved Technical Specifications (TAC No. ME2139)- Submittal of Information Requested by NRC Staff Project stage: Request ML1027303982010-09-0707 September 2010 Calculation C11116, Revision 0, Kewaunee Unit 1 Steam Generator Narrow Range Level Protection Channel Statistical Allowance (Csa) Calculation Project stage: Other ML1025807092010-09-0808 September 2010 Enclosure, Q&A to Attachment 1, Volume 8 (Section 3.3) Rev 2, ITA NRC Questions Project stage: Other ML1025807102010-09-0808 September 2010 Enclosure, Q&A to Attachment 1, Volume 16 (Chapter 5.0) Rev 2, ITS NRC Questions Project stage: Other ML1025807082010-09-0808 September 2010 Enclosure, Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16, Associated NRC Staff Requests for Additional Information and Kewaunees Responses Project stage: Supplement ML1025807072010-09-0808 September 2010 Attachment 2, Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16 Project stage: Supplement ML1025807062010-09-0808 September 2010 Attachment 1, Volume 16, Improved Technical Specifications Conversion (Chapter 5.0), Administrative Controls, Rev. 2, Summary of Changes Project stage: Other ML1025807052010-09-0808 September 2010 Attachment 1, License Amendment Request 249: Conversion Improved Technical Specifications, Supplement to Volumes 8 and 16 Project stage: Supplement ML1025807042010-09-0808 September 2010 Attachment 1, Volume 08, Improved Technical Specifications Conversion, (Section 3.3), Instrumentation, Rev. 2, Summary of Changes Project stage: Other ML1025806952010-09-0808 September 2010 Conversion to Improved Technical Specifications, Supplement to Volumes 8 and 16 Project stage: Supplement 2010-07-01
[Table View] |
Text
Serial No.10-457 ATTACHMENT 4
LICENSE AMENDMENT REQUEST 249: KEWAUNEE POWER STATION CONVERSION TO IMPROVED TECHNICAL SPECIFICATIONS (TAC NO. ME 2139) SUPPLEMENT TO VOLUMES 1, 2, 8, 13, AND 14
COMMITMENT LIST
KEWAUNEE POWER STATION DOMINION ENERGY KEWAUNEE, INC.
Serial No.10-457 Docket No. 50-305 Page 1 of 4 COMMITMENT LIST The following list identifies those actions committed to by Dominion Energy Kewaunee (DEK) for the Kewaunee Power Station (Kewaunee) in this document. Any other actions discussed in the submittal represent intended or planned actions and are described only for information and ar e not regulatory commitments.
This following list supersedes the list provided in Reference 1 of the cover letter in its entirety. Information within parentheses provides reference to the specific DEK response to NRC RAIs where the commitment was made. These NRC RAIs and DEK responses are contained in the Enclosure to this letter. Please contact Mr. Gerald O. Riste - ITS Conversion, Licensing, at (920) 388-8424 with any questi ons regarding this document or any associated regulatory commitments.
No. Commitment Due Date/Event 1 DEK will have written procedures available describing the compensatory measures when LCO
3.7.10, Control Room Po st-Accident Recirculation (CRPAR) System, ACTION B, "Two CRPAR trains inoperable due to inoperable control room boundary in MODE 1, 2, 3, or 4," is entered. Upon implementation 2 DEK will establish the Tec hnical Specification Bases for LCO 3.0.8, as adopted, with the applicable license amendment. Upon implementation 3 DEK will ensure that when LCO 3.0.8a is used, appropriate plant procedur es and administrative controls are revised to im plement the following Tier 2 Restriction:
- At least one AFW train (including a minimum set of supporting equipment required for its
successful operation) not associated with the inoperable snubber(s) must be available. Upon implementation Serial No.10-457 Docket No. 50-305 Page 2 of 4 COMMITMENT LIST No. Commitment Due Date/Event 4 DEK will ensure that when LCO 3.0.8b is used, appropriate plant procedur es and administrative controls are revised to im plement the following Tier 2 Restriction:
- At least one AFW train (including a minimum set of supporting equipment required for its
successful operation) not associated with the inoperable snubber(s), or some alternative
means of core cooling (e.g., F&B, firewater system or aggressive secondary cooldown
using the steam generators) must be available.
Upon implementation 5 DEK will ensure that when LCO 3.0.8 is used appropriate plant procedur es and administrative controls are revised to im plement the following Tier 2 Restriction:
- Each time the provisio ns of LCO 3.0.8 are used DEK will confirm that at least one train (or subsystem) of systems supported by the inoperable snubbers woul d remain capable of performing their required safety or support
functions for postulated design loads other than
seismic loads. LCO 3.0.8 does not apply to non-
seismic snubbers. In addi tion, a record of the design function of the inoperable snubber (i.e.,
seismic vs. non-seismic), implementation of any applicable Tier 2 restrictions, and the associated
plant configuration sh all be available on a recoverable basis.
Upon implementation 6 DEK will revise the USAR or TS Bases to describe the restrictions in commitments 3 and 4.
In accordance with 10 CFR 50.71(e) 7 DEK will have written procedures available describing compensatory measures to be taken in
the event of an intentional or unintentional entry into LCO 3.7.12, Auxiliary Buil ding Special Ventilation (ASV) System, Condition B, "Two ASV trains inoperable due to i noperable ASV boundary."
Upon implementation 8 Withdrawn, refer to Enclosure Volume 8 (KAB-077) N/A Serial No.10-457 Docket No. 50-305 Page 3 of 4 COMMITMENT LIST No. Commitment Due Date/Event 9 DEK will implement administ rative controls to include the following restrictions.
Transient Without Scram) Mitigating System
Actuation Circuitry), or turbine trip should not be scheduled when a RTB is out of service.
- Activities that could degrade other components of the RPS, including master relays or slave relays and activities that cause analog channels to be
unavailable should not be scheduled when a logic
cabinet is unavailable.
- Activities on electrical systems that support the systems or functions listed in the first two bullets should not be scheduled when a RTB is
unavailable.
Upon implementation 10 DEK commits to include in the USAR a requirement to maintain a 5% design margin for the batteries
describing how this design margin is required to
allow the use of a 2 amp float current value that is an indication that the battery is 95 percent charged.
(GMW-007) (Duplicated in Commitment 12 but included here for completeness.)
In accordance with 10 CFR 50.71(e) 11 DEK commits to incorporat ing the expected/qualified life of the safety related batteries in the battery monitoring program in the USAR. (GMW-009) In accordance with 10 CFR 50.71(e)
Serial No.10-457 Docket No. 50-305 Page 4 of 4 COMMITMENT LIST No. Commitment Due Date/Event 12 DEK commits to change or verify the Kewaunee USAR describes: 1. The requirement to maintain a 5% design margin for the batteries describing how this design
margin is required to allow the use of a 2 amp
float current value as an indication that the battery is at least 95 percent charged. 2. The minimum established design limit for battery terminal float voltage. 3. The minimum established design limit for electrolyte level. 4. The minimum established design limit for electrolyte temperature. 5. The minimum requirements for the alternate means (i.e., spare battery charger) that is used
to obtain an extended battery charger
completion time (CT). (GMW-014) In accordance with 10 CFR 50.71(e) 13 DEK commits to change (or verify) procedure(s) to include the measuring and test equipment
manufacturer's recommended practice for instrument stabilization when measuring float current to confirm
battery state of charge.
(GMW-014)
Upon implementation 14 DEK commits to including vital switchgear and battery room temperature limits in the USAR. (MEH-009) In accordance with 10 CFR 50.71(e) 15 DEK has committed in the GL 2008-01 letter to monitor the status of the industry/NRC Technical
Specification Task Force (TSTF) Traveler to be developed as a follow-up to GL 2008-01. Following NRC approval of this TSTF, DEK will adopt
applicable portions of the Traveler. (MEH-002) Following NRC approval of the TSTF, on a schedule
consistent with the
commitment made in the
response to GL 2008-01.