Category:License-Operator
MONTHYEARIR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 ML23115A3552023-03-0909 March 2023 10-CGS-2023-02 Post Exam Comments ML23115A3562023-03-0909 March 2023 11-CGS-2023-02 Public Forms IR 05000397/20213012021-04-21021 April 2021 NRC Exam Report 05000397/2021301 ML21113A0062021-03-0404 March 2021 CG-2021-02-FINAL Outlines ML21098A1702021-03-0404 March 2021 CG-2021-02-FINAL Written Examination ML21113A0002021-03-0404 March 2021 CG-2021-02-DRAFT Op Test Comments ML21113A0012021-03-0404 March 2021 CG-2021-02-DRAFT Op Test ML21113A0022021-03-0404 March 2021 CG-2021-02-DRAFT Outline Comments ML21098A1692021-03-0404 March 2021 CG-2021-02-FINAL Operating Test ML21098A1712021-03-0404 March 2021 CG-2021-02-Post Exam Submittal ML21113A0072021-03-0404 March 2021 CG-2021-02-Public Forms, Exam Assignment Tickler ML21113A0052021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam ML21113A0042021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam Comments ML21113A0032021-03-0404 March 2021 CG-2021-02-Draft Outlines ML20108F0522020-04-16016 April 2020 Notification of NRC Initial Operator Licensing Examination 05000397/2021301 ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18145A2312018-05-29029 May 2018 Errata for Columbia Generating Station - Notification of NRC Initial Operator Licensing Examination 05000397/2019301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17081A5402017-03-0909 March 2017 4-COLUMBIA-2017-02 Draft Written Exam Comments ML17081A5352017-03-0909 March 2017 10-Columbia-2017-02 Post-Exam Comments ML17081A5422017-03-0909 March 2017 6-COLUMBIA-2017-02 Draft Operating Test Comments ML17081A5372017-03-0909 March 2017 1-COLUMBIA-2017-02 Draft Outlines ML17081A5332017-03-0909 March 2017 8-Columbia-2017-02 Final Written Exam ML17081A5342017-03-0909 March 2017 9-Columbia-2017-02 Final Operating Test ML17081A5392017-03-0909 March 2017 3-COLUMBIA-2017-02 Draft Written Exam ML17081A5412017-03-0909 March 2017 5-Columbia-2017-02 Draft Operating Test ML17100A3992017-03-0909 March 2017 11-COLUMBIA-2017-02 Public Forms ML17081A5432017-03-0909 March 2017 7-COLUMBIA-2017-02 Final Outlines ML17081A5382017-03-0909 March 2017 2-Columbia-2017-02 Draft Outline Comments ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML17094A5682017-02-16016 February 2017 NRC Initial Operator Licensing Examination Approval 05000397/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 GO2-16-106, Voluntary Response to Regulatory Issue Summary 2016-092016-07-13013 July 2016 Voluntary Response to Regulatory Issue Summary 2016-09 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15167A1332015-05-13013 May 2015 2015-04 Post Exam Comments Analysis ML15167A1402015-05-0505 May 2015 2015-04 Draft Op Test ML15183A0512015-05-0505 May 2015 2015-04 Public Forms ML15167A1502015-05-0505 May 2015 2015-04 Final Outlines ML15167A1492015-05-0505 May 2015 2015-04 Draft Op Test Comments ML15167A1472015-05-0505 May 2015 2015-04 Draft Written Exam Comments ML15167A1452015-05-0505 May 2015 2015-04 - Draft Outline Comments ML15167A1442015-05-0505 May 2015 2015-04 Draft Outlines ML15167A1382015-05-0505 May 2015 2015-04 Draft Written Exams ML15167A1282015-05-0505 May 2015 2015-04 As-given Op Test Files ML15167A1272015-05-0505 May 2015 2015-04 Final Op Test ML15167A1232015-05-0505 May 2015 2015-04 Final Written Exams ML15111A0662015-04-21021 April 2015 Examination Approval 05000397/2015301 ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 2024-02-14
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 ML23115A3552023-03-0909 March 2023 10-CGS-2023-02 Post Exam Comments ML23115A3562023-03-0909 March 2023 11-CGS-2023-02 Public Forms IR 05000397/20213012021-04-21021 April 2021 NRC Exam Report 05000397/2021301 ML21113A0062021-03-0404 March 2021 CG-2021-02-FINAL Outlines ML21098A1692021-03-0404 March 2021 CG-2021-02-FINAL Operating Test ML21098A1702021-03-0404 March 2021 CG-2021-02-FINAL Written Examination ML21098A1712021-03-0404 March 2021 CG-2021-02-Post Exam Submittal ML21113A0072021-03-0404 March 2021 CG-2021-02-Public Forms, Exam Assignment Tickler ML21113A0032021-03-0404 March 2021 CG-2021-02-Draft Outlines ML21113A0042021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam Comments ML21113A0052021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam ML21113A0002021-03-0404 March 2021 CG-2021-02-DRAFT Op Test Comments ML21113A0012021-03-0404 March 2021 CG-2021-02-DRAFT Op Test ML21113A0022021-03-0404 March 2021 CG-2021-02-DRAFT Outline Comments ML20108F0522020-04-16016 April 2020 Notification of NRC Initial Operator Licensing Examination 05000397/2021301 ML18145A2312018-05-29029 May 2018 Errata for Columbia Generating Station - Notification of NRC Initial Operator Licensing Examination 05000397/2019301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17081A5342017-03-0909 March 2017 9-Columbia-2017-02 Final Operating Test ML17100A3992017-03-0909 March 2017 11-COLUMBIA-2017-02 Public Forms ML17081A5352017-03-0909 March 2017 10-Columbia-2017-02 Post-Exam Comments ML17081A5422017-03-0909 March 2017 6-COLUMBIA-2017-02 Draft Operating Test Comments ML17081A5372017-03-0909 March 2017 1-COLUMBIA-2017-02 Draft Outlines ML17081A5402017-03-0909 March 2017 4-COLUMBIA-2017-02 Draft Written Exam Comments ML17081A5412017-03-0909 March 2017 5-Columbia-2017-02 Draft Operating Test ML17081A5432017-03-0909 March 2017 7-COLUMBIA-2017-02 Final Outlines ML17081A5332017-03-0909 March 2017 8-Columbia-2017-02 Final Written Exam ML17081A5392017-03-0909 March 2017 3-COLUMBIA-2017-02 Draft Written Exam ML17081A5382017-03-0909 March 2017 2-Columbia-2017-02 Draft Outline Comments ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results GO2-16-106, Voluntary Response to Regulatory Issue Summary 2016-092016-07-13013 July 2016 Voluntary Response to Regulatory Issue Summary 2016-09 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15167A1332015-05-13013 May 2015 2015-04 Post Exam Comments Analysis ML15183A0512015-05-0505 May 2015 2015-04 Public Forms ML15167A1502015-05-0505 May 2015 2015-04 Final Outlines ML15167A1492015-05-0505 May 2015 2015-04 Draft Op Test Comments ML15167A1472015-05-0505 May 2015 2015-04 Draft Written Exam Comments ML15167A1452015-05-0505 May 2015 2015-04 - Draft Outline Comments ML15167A1442015-05-0505 May 2015 2015-04 Draft Outlines ML15167A1402015-05-0505 May 2015 2015-04 Draft Op Test ML15167A1232015-05-0505 May 2015 2015-04 Final Written Exams ML15167A1272015-05-0505 May 2015 2015-04 Final Op Test ML15167A1282015-05-0505 May 2015 2015-04 As-given Op Test Files ML15167A1382015-05-0505 May 2015 2015-04 Draft Written Exams ML15111A0662015-04-21021 April 2015 Examination Approval 05000397/2015301 ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 ML14163A4792014-05-29029 May 2014 Voluntary Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML13056A5202013-02-12012 February 2013 2013-02- Exam Performance Analysis ML13084A1092013-02-0808 February 2013 Generation Station-2013-02-Draft Operating Test Comments 2024-02-14
[Table view] |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: Columbia Generating Station Date of Examination:
April 2011 Examination Level: RO X SRO Operating Test Number:
1 Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations
N, R Alternate Determination of Drywell Identified Leakage per SOP
-EDR-OPS Section 5.7
- Candidate is given parameters associated with EDR-P-5 and asked to determine the calculated identified Drywell leak rate Conduct of Operations D, R The RO is given a turnover sheet that states a RX S/U is in progress and then parameters that indicate the reactor is critical. He has to realize the Reactor
is Critical or will be critical prior to the ECP and take actions per PPM 3.1.2 which states to: stop control rod withdrawal and notify the CRS. The candidate will fill out an attachment indicating what his next action will be and the basis for that action. Equipment Control M, R The RO is given a section of OSP
-INST-H101 that has 4 reading that are incorrect. Candidate is told to perform a peer check and red circle any errors found. Radiation Control P, R The RO Candidate is given data for his personal dose and told he is to perform work that is in a High Radiation Area. The candidate has to calculate his maximum stay time Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from (P)revious 2 exa ES-301 Administrative Topics Outline Form ES-301-1 Facility: Columbia Generating Station Date of Examination:
April 2011 Examination Level: RO SRO X Operating Test Number
- 1 Administrative Topic (see Note) Type Code* Describe activity to be performed Conduct of Operations D, R The SRO candidate is given a turnover sheet that states a RX S/U is in progress and then parameters that indicate the reactor is critical. He is cued to determine his next action. To successfully complete the JPM he has to realize the Reactor is Critical prior to the ECP and take actions per PPM 3.1.2 which states to: stop control rod withdrawal, the CRS should direct the CRO to drive control rods in the reverse order until all rods are fully inserted.
Conduct of Operations M, R The SRO candidate is told that I & C has determined that one required CST Level Monitoring channel is not operational. Due to the LAN Operations Log System being out of service the SRO is directed to manually complete an INOP EQUIP/LCO/RFO STATUS SHEET and make the Log entry using PPM 1.3.1 Attachments 6.4 & 6.5.
Equipment Control P, R The SRO candidate is given a request to allow or disallow a move of a heavy load over the Spent Fuel Pool and a copy of PPM 1.3.40 and LCS 1.9.2. PPM 1.3.40 attachment 7.5 should be referenced which has 3 requirements to satisfy.
Requirement #3 will not be satisfied and the move should not be allowed.
Radiation Control N, R The SRO Candidate is given parameters associated with Circ Water blowdown and is asked to approve or not approve the release permit. He is required to determine if the instrumentation necessary for blowdown is available. The primary and approved alternate flow instrumentation is NOT available and the blowdown will not be approved.
Emergency Procedures/Plan N, R The SRO candidate is given plant data and directed to perform a QEDPS and determine the EAL. The SRO will use the electronic QEDPS program to calculate the offsite release. The calculations will show that the CDE Thyroid dose at 1.2 miles is GT the General Emergency level and a GE will be declared per 5.1.G.2.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from (N)ew or (M)odified from
ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2 Facility: COLUMBIA GENERATING STATION Date of Examination: April 2011 Exam Level: RO X SRO-I X SRO-U X Operating Test No.:
1 Control Room Systems
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function a. LPCS-P-2 Fails, Start LPCS
-P-1, SW-V-12A Fails to Auto Open (LO001722) (IC 171) N, A, S 8 R, SRO/I, SRO
-U b. Manually Initiate Containment Isolations (TIP Fails to Isolate) (LO001599) (IC 171) D, A, S, L, EN 5 R, SRO/I, SRO
-U c. SRV Fails open does not close requiring a scram (ATWS occurs to aid in performance of other JPM but is not part of this JPM. This JPM is ended when MODE switch goes to shutdown. (LO001717) (IC 172)
M, A, S 3 R, SRO/I d. ATWS - Install RPS Jumpers per PPM 5.5.11 (LO001685) (IC 172)
P, D, S 7 R, SRO/I e. Rx Building Ventillation Trouble
- Start SGT (LO001602) (IC 173)
M, A, S 9 R, SRO/I f. Slow close the MSIVs (LR001792) (IC 173)
D, L, S 4 R, SRO/I g. Start ASD Channel 1A2
- Uncontrolled rise in RRC/P speed (LO001718) (IC 174) M, S, A 1 R, SRO/I h. Transfer SM
-7 from Startup Power to Backup Power (LR001943) (IC 174) D, S 6 R In-Plant Systems@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U) i. Vent Scram Air Header EOP 5.5.11 Tab D (LO001593)
D, E, R 1 R, SRO/I, SRO
-U j. Start RCIC from RSD
- RPV/L LT -147" requires ED (LR001846)
D, P, A, E, R, L 2 R, SRO/I, SRO
-U k. CR EVAC
- Start DG-2 and Trip HPCS per Attachment 7.5 (LO001719)
N, R, E, L, EN 6 R, SRO/I, SRO
-U @ All RO and SRO
-I control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams
(R)CA (S)imulator 4-6 / 4-6 / 2-3 - / - Actual JPM count:
(A) - 6 / 6 / 3 (C) - None (D) - 6 / 5 / 3 (E) - 3 / 3 / 3 (EN) - 2 / 2 / 1 (L) - 4 / 4 / 3 (N) (M) - 5 / 5 / 2 (P) - 2 / 2 / 1 (R) - 3 / 3 / 3 (S) - 8 / 7 / 2