LR-N08-0029, Transmittal of Proprietary Report 07-17P, Revision 3, Stress Assessment of Hope Creek Unit 1 Steam Dryer Based on Revision 4 Loads Model.
ML080420542 | |
Person / Time | |
---|---|
Site: | Hope Creek |
Issue date: | 01/30/2008 |
From: | Keenan J Public Service Enterprise Group |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
07-17P, Rev 3, LR-N08-0029 | |
Download: ML080420542 (2) | |
Similar Documents at Hope Creek | |
---|---|
Category:Legal-Affidavit
MONTHYEARLR-N24-0042, Affidavit to Support Withholding the Core Operating Limits Report, Per 10 CFR 2.390(a)(4)2024-05-28028 May 2024
[Table view]Affidavit to Support Withholding the Core Operating Limits Report, Per 10 CFR 2.390(a)(4) LR-N21-0040, Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication2021-05-27027 May 2021 Response to Request for Additional Information SNSB-RAI 1 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication LR-N21-0042, Core Operating Limits Report, Reload 23, Cycle 24, Revision 212021-05-24024 May 2021 Core Operating Limits Report, Reload 23, Cycle 24, Revision 21 LR-N21-0018, Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication2021-04-29029 April 2021 Response to Requests for Additional Information SNSB-RAI 2 and SNSB-RAI 3 License Amendment Request to Revise Low Pressure Safety Limit to Address General Electric Part 21 Safety Communication LR-N20-0023, License Amendment Request: Revise Hope Creek Generating Station Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-032020-09-24024 September 2020 License Amendment Request: Revise Hope Creek Generating Station Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 LR-N19-0101, Submittal of Core Operating Limits Report, Reload 22, Cycle 23, Revision 172019-11-12012 November 2019 Submittal of Core Operating Limits Report, Reload 22, Cycle 23, Revision 17 LR-N19-0074, Core Operating Limits Report, Reload 21, Cycle 22, Revision 162019-09-0303 September 2019 Core Operating Limits Report, Reload 21, Cycle 22, Revision 16 LR-N19-0015, Core Operating Limits Report, Reload 21, Cycle 22, Revision 152019-03-0606 March 2019 Core Operating Limits Report, Reload 21, Cycle 22, Revision 15 LR-N18-0055, Attachment 3 to LR-N18-0055, Affidavit for Core Operating Limits Report for Unit 12018-05-0909 May 2018 Attachment 3 to LR-N18-0055, Affidavit for Core Operating Limits Report for Unit 1 LR-N17-0181, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate LR-N17-0126, Response to Request for Additional Information (Rai), P-T Limit Report License Amendment Application2017-09-0505 September 2017 Response to Request for Additional Information (Rai), P-T Limit Report License Amendment Application ML17188A2622017-03-29029 March 2017 Enclosure 7 to LR-N17-0044 and LAR H17-03 - Affidavits from GEH and the Electric Power Research Institute (EPRI) Supporting the Withholding of Information in Enclosure 6 from Public Disclosure LR-N17-0044, Enclosure 7 to LR-N17-0044 and LAR H17-03 - Affidavits from GEH and the Electric Power Research Institute (EPRI) Supporting the Withholding of Information in Enclosure 6 from Public Disclosure2017-03-29029 March 2017 Enclosure 7 to LR-N17-0044 and LAR H17-03 - Affidavits from GEH and the Electric Power Research Institute (EPRI) Supporting the Withholding of Information in Enclosure 6 from Public Disclosure LR-N17-0044, Enclosure 13 of LR-N17-0044 and LAR H17-03 - Affidavits from Cameron International Corporation Supporting the Withholding of Information in Enclosures 9 and 11 from Public Disclosure2017-03-29029 March 2017 Enclosure 13 of LR-N17-0044 and LAR H17-03 - Affidavits from Cameron International Corporation Supporting the Withholding of Information in Enclosures 9 and 11 from Public Disclosure ML17188A2682017-03-29029 March 2017 Enclosure 13 of LR-N17-0044 and LAR H17-03 - Affidavits from Cameron International Corporation Supporting the Withholding of Information in Enclosures 9 and 11 from Public Disclosure LR-N16-0202, PSEG Nuclear LLC (PSEG) - Board Resolutions - Foreign Ownership, Control, or Influence2016-11-0303 November 2016 PSEG Nuclear LLC (PSEG) - Board Resolutions - Foreign Ownership, Control, or Influence LR-N22-0083, Enclosure 3 - Global Nuclear Fuel - Americas Affidavit of Lukas Trosman2016-10-28028 October 2016 Enclosure 3 - Global Nuclear Fuel - Americas Affidavit of Lukas Trosman LR-N16-0204, Affidavit for Core Operating Limits Report, Reload 20, Cycle 21, Revision 132016-10-28028 October 2016 Affidavit for Core Operating Limits Report, Reload 20, Cycle 21, Revision 13 LR-N16-0113, GEH Affidavits Supporting the Withholding of Information in Enclosure 6 from Public Disclosure2016-08-16016 August 2016 GEH Affidavits Supporting the Withholding of Information in Enclosure 6 from Public Disclosure LR-N15-0071, Core Operating Limits Report, Reload 18, Cycle 19, Revision 102015-03-20020 March 2015 Core Operating Limits Report, Reload 18, Cycle 19, Revision 10 ML14204A7092014-07-23023 July 2014 Enclosure 3, Affidavit of Peter M. Yandow LR-N14-0157, PSEG Nuclear (PSEG) Response to NRC Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request, Dated May 5, 20142014-06-19019 June 2014 PSEG Nuclear (PSEG) Response to NRC Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request, Dated May 5, 2014 LR-N12-0075, Core Operating Limits Report, Reload 16, Cycle 17, Revision 62012-02-28028 February 2012 Core Operating Limits Report, Reload 16, Cycle 17, Revision 6 ML1127000682011-09-26026 September 2011 Enclosure 3, Mfn 10-245 R4, Affidavit LR-N11-0087, 2011 Annual Report - Guarantees of Payment of Deferred Premiums2011-03-31031 March 2011 2011 Annual Report - Guarantees of Payment of Deferred Premiums ML0831008272008-10-31031 October 2008 Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and Affidavit LR-N08-0224, Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and Affidavit2008-10-31031 October 2008 Attachments 3 and 4 - Hope Creek Extended Power Uprate Power Ascension Test Report and Affidavit LR-N08-0029, Transmittal of Proprietary Report 07-17P, Revision 3, Stress Assessment of Hope Creek Unit 1 Steam Dryer Based on Revision 4 Loads Model.2008-01-30030 January 2008 Transmittal of Proprietary Report 07-17P, Revision 3, Stress Assessment of Hope Creek Unit 1 Steam Dryer Based on Revision 4 Loads Model. LR-N08-0028, Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate2008-01-25025 January 2008 Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate LR-N08-0014, Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate2008-01-18018 January 2008 Responses to Requests for Additional Information Request for License Amendment - Extended Power Uprate LR-N07-0215, Supplement to License Amendment Request for Extended Power Uprate2007-08-27027 August 2007 Supplement to License Amendment Request for Extended Power Uprate LR-N07-0102, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-05-10010 May 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate LR-N07-0099, Response to Request for Additional Information Request for License Amendment, Extended Power Uprate2007-04-30030 April 2007 Response to Request for Additional Information Request for License Amendment, Extended Power Uprate LR-N07-0060, Response to Request for Additional Information Request for License Amendment - Extended Power Uprate2007-03-30030 March 2007 Response to Request for Additional Information Request for License Amendment - Extended Power Uprate LR-N06-0192, Guaranteed Retrospective Premiums Following Nuclear Accident, Salem and Hope Creek2006-05-0101 May 2006 Guaranteed Retrospective Premiums Following Nuclear Accident, Salem and Hope Creek LR-N05-0448, Response to Request for Additional Information Re Request for Change to Technical Specifications Arts/Mellla Implementation2005-09-23023 September 2005 Response to Request for Additional Information Re Request for Change to Technical Specifications Arts/Mellla Implementation ML0520003282005-07-14014 July 2005 Surveillance Program for Channel-Control Blade Interference LR-N05-0247, Stations - Guaranteed Retrospective Premiums Following a Nuclear Accident2005-04-29029 April 2005 Stations - Guaranteed Retrospective Premiums Following a Nuclear Accident ML0419004262004-07-0101 July 2004 GE Nuclear Energy Request for Withholding - Hope Creek Fuel Vendor Change Response to NRC Request for Additional Information (Docket No. 50-354) LR-N03-0386, Transmittal of Information Relating to SVEA-96+ Modeling Dimensions in Support of the Nrc'S Review of GNF-A Proprietary Report, NEDC-33107P, GEXL80 Correlation for SVEA96+ Fuel, Dated September 20032003-09-0808 September 2003 Transmittal of Information Relating to SVEA-96+ Modeling Dimensions in Support of the Nrc'S Review of GNF-A Proprietary Report, NEDC-33107P, GEXL80 Correlation for SVEA96+ Fuel, Dated September 2003 2024-05-28 Category:Letter type:LR MONTHYEARLR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024
[Table view]In-Service Inspection Activities LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 LR-N24-0048, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0028, and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 and Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges LR-N23-0065, Submittal of 2023 Annual 10 CFR 50.46 Report2023-10-0202 October 2023 Submittal of 2023 Annual 10 CFR 50.46 Report LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0052, Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.12023-07-31031 July 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers Per Technical Specification 4.6.2.1 LR-N23-0042, Spent Fuel Cask Registration2023-07-12012 July 2023 Spent Fuel Cask Registration LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0009, License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains2023-04-18018 April 2023 License Amendment Request (LAR) to Revise the Hope Creek Trip and Standby Auto-start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning (HVAC) Trains LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes2023-03-29029 March 2023 Submittal of Hope Creek Generating Station Technical Specification Bases Changes LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges2023-02-27027 February 2023 Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0011, In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage2023-01-19019 January 2023 In-Service Inspection Activities - 90 Day Report: Twenty-Fourth Refueling Outage LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0075, 2022 Annual 10 CFR 50.46 Report2022-09-30030 September 2022 2022 Annual 10 CFR 50.46 Report LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0019, Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges2022-02-24024 February 2022 Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0011, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink2022-02-0101 February 2022 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Limits for Ultimate Heat Sink LR-N22-0005, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-01-0707 January 2022 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0087, Corrected Hope Creek 10 CFR 50.46 Reports2021-12-0202 December 2021 Corrected Hope Creek 10 CFR 50.46 Reports 2024-09-10 |
Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0 PSEG Nuclear LLC LR-N08-0029 January 30, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Facility Operating License No. NPF-57 NRC Docket No. 50-354
Subject:
Transmittal of Proprietary Report
Reference:
- 1) Letter from George P. Barnes (PSEG Nuclear LLC) to USNRC, January 18, 2008 In Reference 1, PSEG Nuclear LLC (PSEG) provided Continuum Dynamics, Inc.(C.D.I.) Report 07-17P, Revision 3, "Stress Assessment of Hope Creek Unit 1 Steam Dryer Based on Revision 4 Loads Model," containing information which C.D.I. considers to be proprietary.
C.D.I. requested that the proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4).
An affidavit supporting this request was provided with the report. The marking of information sought to be withheld in the report was not consistent with the detailed requirements of 10 CFR 2.390(b)(1).
Attachment 1 to this letter provides a copy of the C.D.I. Report marked in accordance with 10 CFR 2.390(b)(1)(i)(B).
C.D.I. hereby requests that the proprietary information be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390(a)(4).
The CDI document in Attachment 1 is the same as the document submitted in Reference 1, with the required proprietary markings applied. The affidavit supplied in Reference 1 remains applicable and supports this request.A non-proprietary version of the report is provided in Attachment 2./Ac/95-2168 REV. 7/99 LR-N08-0029 January 30, 2008 Page 2 Should you have any questions regarding this transmittal, please contact Mr. Paul Duke at 856-339-1466.
Sincerely, nager -Licensing Attachments (2)1. C.D.I. Report 07-17P, Revision 3 2. C.D.I. Report 07-17NP, Revision 3 cc: S. Collins, Regional Administrator
-NRC Region I J. Lamb, Project Manager -USNRC NRC Senior Resident Inspector
-Hope Creek P. Mulligan, Manager IV, NJBNE