MONTHYEARNLS2024006, Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022050, Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library2022-11-0909 November 2022 Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library NLS2022048, Management Change and Correspondence Update2022-11-0101 November 2022 Management Change and Correspondence Update NLS2022047, Core Operating Limits Report, Cycle 33, Revision 02022-10-14014 October 2022 Core Operating Limits Report, Cycle 33, Revision 0 NLS2022042, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2022-10-0707 October 2022 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2022037, Emergency Plan, Revision 80, Summary of 50.54(q) Analyses2022-08-18018 August 2022 Emergency Plan, Revision 80, Summary of 50.54(q) Analyses NLS2022035, Evacuation Time Estimate Report for Cooper Nuclear Station2022-08-16016 August 2022 Evacuation Time Estimate Report for Cooper Nuclear Station NLS2022031, Licensee Guarantees of Payment of Deferred Premiums2022-07-19019 July 2022 Licensee Guarantees of Payment of Deferred Premiums NLS2022005, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-06-16016 June 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements NLS2022025, Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring2022-06-0606 June 2022 Nebraska Public Power District Letter (NLS2022010) to U.S. Nuclear Regulatory Commission Dated April 5, 2022, Annual Report of Individual Exposure Monitoring NLS2022016, Annual Radiological Environmental Report2022-05-10010 May 2022 Annual Radiological Environmental Report NLS2022020, Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report2022-05-0202 May 2022 Nebraska Public Power District, Cooper Nuclear Station, 2021 Financial Report NLS2022014, Annual Radioactive Effluent Release Report2022-04-27027 April 2022 Annual Radioactive Effluent Release Report NLS2022010, Annual Report of Individual Exposure Monitoring2022-04-0505 April 2022 Annual Report of Individual Exposure Monitoring NLS2022009, Property Insurance Coverage2022-03-23023 March 2022 Property Insurance Coverage NLS2022011, Preparation and Scheduling of Operator Licensing Examinations2022-03-18018 March 2022 Preparation and Scheduling of Operator Licensing Examinations NLS2022004, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 12022-02-0707 February 2022 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Relief Request RR5-01, Revision 1 NLS2022003, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20212022-01-20020 January 2022 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2021 NLS2021067, ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan2021-12-16016 December 2021 ISFSI - Independent Spent Fuel Storage Installation Decommissioning Funding Plan NLS2021069, Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-12-15015 December 2021 Withdrawal of Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2021066, Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 32021-12-10010 December 2021 Response to Nuclear Regulatory Commission'S Request for Additional Information Regarding Alternative Request RI5-02, Revision 3 NLS2021065, Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-012021-12-0606 December 2021 Clarification of Response to Nuclear Regulatory Commission'S Request for Additional Information for Alternative Request RS-01 NLS2021056, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2021-11-16016 November 2021 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements 2024-01-25
[Table view] |
Text
N Nebraska Public Power District"Always there when you need us" 50.90 NLS2009057 August 12, 2009 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555-0001
Subject:
Response to Nuclear Regulatory Commission Request for Additional Information Re: Battery Resistance Surveillance Requirements (TAC No. ME0848)Cooper Nuclear Station, Docket No. 50-298, DPR-46
References:
- 1. Letter from Carl F. Lyon, U. S. Nuclear Regulatory Commission, to Stewart B. Minahan, Nebraska Public Power District, dated July 10, 2009,"Cooper Nuclear Station -Request for Additional Information Re: Battery Resistance Surveillance Requirements (TAC No. ME0848)" 2. Letter from Stewart B. Minahan, Nebraska Public Power District, to the U.S. Nuclear Regulatory Commission, dated March 11, 2009, "License Amendment Request to Revise Nonconservative Battery Resistance Technical Specification Surveillance Requirements"
Dear Sir or Madam:
The purpose of this letter is for Nebraska Public Power District to submit a response to a Request for Additional Information (RAI) from the Nuclear Regulatory Commission (NRC) (Reference 1). Reference 1 requested information in support of NRC's review of a license amendment request for the Cooper Nuclear Station facility operating license and technical specifications to revise nonconservative battery resistance surveillance requirements (Reference 2).Responses to the specific RAI questions are provided in Attachment
- 1. Attachment 2 shows additional changes to the Technical Specifications (TS), based on the RAI response, in marked up format. Attachment 3 provides the additional TS change in final typed form. Enclosures 1, 2, 3, and 4 are the supporting calculations for total resistance limits for both divisions of the station batteries.
Lastly, a conforming change is also being made to the TS Bases. This additional change is not attached.COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone:
(402) 825-3811 / Fax: (402) 825-5211 www.nppd.com NLS2009057 Page 2 of 2 The information submitted by this response does not change the conclusions or the basis of the no significant hazards consideration evaluation provided with Reference
- 2. Additionally, no regulatory commitments are made in this submittal.
If you have any questions concerning this matter, please contact David Van Der Kamp, Licensing Manager, at (402) 825-2904.I declare under penalty of perjury that the foregoing is true and correct.Executed on (date)Sincerely, Stewart B. Minahan Vice President
-Nuclear and Chief Nuclear Officer/bk Attachments Enclosures cc: Regional Administrator w/ attachments and enclosures USNRC -Region IV Cooper Project Manager w/ attachments and enclosures USNRC -NRR Project Directorate IV-1 Senior Resident Inspector w/ attachments and enclosures USNRC -CNS Nebraska Health and Human Services w/ attachments and enclosures Department of Regulation and Licensure NPG Distribution w/ attachments and w/o enclosures CNS Records w/ attachments and enclosures
ý ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© 4 I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© 4 Correspondence Number: NLS2009057 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document.
Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments.
Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None 4 4+ 4 4 4 4- 4-.1- 4.*1- +4. +4. ++ +PROCEDURE 0.42 REVISION 23 PAGE 19 OF 26 NLS2009057 Attachment 1 Page 1 of 2 Attachment 1 Response to Nuclear Regulatory Commission Request for Additional Information Battery Resistance Surveillance Requirements (TAC No. ME0848)Cooper Nuclear Station, Docket No. 50-298, DPR-46 The Nuclear Regulatory Commission (NRC) Request for Additional Information (RAI) is shown in italics. The Nebraska Public Power District's (NPPD) response to each RAI is shown in block font.NRC Question #1 In the license amendment request dated March 11, 2009, the licensee proposed revising Technical Specification (TS) Surveillance Requirements (SRs) 3.8.4.2 and SR 3.8.4.5 by adding a parameter of total battery resistance.
Please provide the full calculations for the total resistance limits that are referenced in the TS Bases for TS SRs 3.8.4.2 and 3.8.4.5, including assumptions and supporting documentation, to show that the batteries will perform their intended design functions when operating within these limits.NPPD Response Copies of the following calculations, without appendices, are included as enclosures to this response.
They are not considered proprietary.
- Enclosure 1 -NEDC 87-131C, Revision 9, 125 VDC Division I Load and Voltage Study* Enclosure 2 -NEDC 87-131D, Revision 8, 125 VDC Division II Load and Voltage Study* Enclosure 3 -NEDC 87-131A, Revision 9, 250 VDC Division I Load and Voltage Study* Enclosure 4- NEDC 87-131B, Revision 8, 250 VDC Division II Load and Voltage Study NRC Question #2 The words "not applicable" are used in proposed TS Table 3.8.4-1. Please explain the use of this wording, and describe how battery limits will be monitored during the performance of revised SRs 3.8.4.2 and 3.8.4.5 (e.g., describe any procedure changes between what is currently performed and what will be performed after implementation of the proposed TS changes).
NLS2009057 Attachment 1 Page 2 of 2 NPPD Response The term "not applicable" meant the limit was not applicable to only one system or one division, but upon further consideration it could be confusing.
Therefore, we have replaced the words"not applicable" with "Both 125 volt and 250 volt" under the System column heading and "Both 1 and 2" under the Division column heading in proposed TS Table 3.8.4-1. Attachment 2 provides revised Table 3.8.4-1 in marked up format, and Attachment 3 provides the revised table in final-typed format.Battery resistance limits of the station batteries are currently monitored through performance of Surveillance Procedure 6.EE.609, 125V/250V Station Battery Intercell Connection Testing.NPPD added total resistance of the batteries as a calculated parameter to this same surveillance procedure as an interim action per Administrative Letter 98-10 for the nonconservative TS.The procedure sums the inter-cell connectors, the inter-tier cables and connectors, the inter-rack cables and connectors, and the terminal connections to determine total resistance.
It then compares that with an interim acceptable value. The interim limits in the procedure for total battery resistance are more conservative than the supporting load and voltage studies provided in the enclosures.
Upon issuance of the license amendment, the method of monitoring battery resistance, including total resistance, will not change; however, Surveillance Procedure 6.EE.609 will require revision to make the limits consistent with revised TS SRs 3.8.4.2 and 3.8.4.5.
NLS2009057 Attachment 2 Page 1 of 2 Attachment 2 Proposed Technical Specification Revisions (Markup)Cooper Nuclear Station, Docket No. 50-298, DPR-46 Revised Technical Specification Page 3.8-19 DC Sources -Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)Battery Connection Resistance Limits PARAMETER LIMIT (MICRO-OHMS)
SYSTEM DIVISION Inter-cell connections_<
150 not --p ,,--'--'
Both 125 volt and Both 1 and 2 250 volt Inter-rack connections_<
280 not -pp-ieab' notapo.eable Both 125 volt and Both 1 and 2 250 volt Inter-tier connections
< 150 not not -applieable Both 125 volt and Both 1 and 2 250 volt Terminal connections_<
150 not not,,pplc,,e Both 125 volt and Both 1 and 2 250 volt< 3300 125 volt Both 1 and 2 Total battery --3-308 25 vot , resistance
<6500 250 volt Both 1 and 2< -6586 256-voft _Cooper 3.8-19 Amendment No.
NLS2009057 Attachment 3 Page 1 of 2 Attachment 3 Proposed Technical Specification Revisions (Final Typed)Cooper Nuclear Station, Docket No. 50-298, DPR-46 Revised Technical Specification Page 3.8-19 DC Sources -Operating 3.8.4 Table 3.8.4-1 (page 1 of 1)Battery Connection Resistance Limits PARAMETER LIMIT (MICRO-OHMS)
SYSTEM DIVISION Inter-cell connections
< 150 Both 125 volt and Both 1 and 2 250 volt Inter-rack connections
< 280 Both 125 volt and Both 1 and 2 250 volt Inter-tier connections
< 150 Both 125 volt and Both 1 and 2 250 volt Terminal connections
< 150 Both 125 volt and Both 1 and 2 250 volt Total battery < 3300 125 volt Both 1 and 2 resistance
< 6500 250 volt Both 1 and 2 Cooper 3.8-19 Amendment No.