ML19077A058

From kanterella
Revision as of 19:56, 27 March 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submittal of Final Status Survey (FSS) Final Report, Phase 2, Part 1 - Unit 2 Diesel Fuel Oil Storage Tank Room Survey 06202
ML19077A058
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/09/2019
From: Giza P
ZionSolutions
To:
Office of Nuclear Material Safety and Safeguards
References
ZS-2019-0017
Download: ML19077A058 (338)


Text

1.Based on maximum percent of total activity from Table 20 of TSD 14-019, normalized to one for the dose significant radionuclides.

,= ,, ,

=11+++ ()=111.79+06 ()+0.0026.58+04 ()=1.70+06 / 2

()=115.98+06 ()+ 180.451.85+08 ()=8.75+05 / 2

Unit 2- 570 ft. elevation Diesel Fuel Oil Storage Tank Room Unit 1 -570ft. elevation Diesel Fuel Oil Storage Tank Room North Auxiliary Building