Letter Sequence Request |
---|
TAC:MD4839, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0708001982007-03-13013 March 2007 9100-00003-NP, Rev. 1, Wolf Creek Generating Station Main Steam and Feedwater Isolation System (Msfis) Controls Summary. Project stage: Request ET 07-0004, Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement2007-03-14014 March 2007 Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement Project stage: Request ET 07-0008, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-04-18018 April 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0712204892007-05-0303 May 2007 Meeting Notice - LAR to Upgrade the Main Steam and Feedwater Isolation System (Msfis) Project stage: Meeting ET 07-0013, Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation System Controls2007-05-0909 May 2007 Response to Request for Additional Information Relating to Replacement of the Main Steam and Feedwater Isolation System Controls Project stage: Response to RAI ML0713703642007-05-17017 May 2007 Handout for Meeting with Wolf Creek Nuclear Operating Corporation on the Licensee'S Application for the Main Steam and Feedwater Isolation System (Msfis) Modification Project stage: Meeting ML0713805112007-05-29029 May 2007 Acceptance Review of Licensee'S Application for Main Steam and Feedwater Isolation System Controls Modification Project stage: Acceptance Review ML0713805102007-06-0404 June 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation for Wolf Creek Generating Station on License Application Request to Update Main Steam and Feedwater Isolation System Project stage: Meeting ET 07-0022, Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification2007-06-15015 June 2007 Supplemental Information on Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0717900072007-07-18018 July 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Licensee'S License Amendment Request Dated March 14, 2006, to Modify the Main Steam and Feedwater Isolation System Project stage: Meeting ML0721501532007-08-0202 August 2007 NRC Staff Handout for August 2, 2007, Meeting with Wolf Creek Nuclear Operating Corporation Project stage: Meeting ML0717900062007-08-0808 August 2007 Completion of Acceptance Review of Request to Modify the Main Stream and Feedwater Isolation System Project stage: Acceptance Review ML0722109412007-08-14014 August 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation Discussed on Description and Justification of Its Proposed Modification of the Main Steam and Feedwater Isolation System Project stage: Meeting ET 07-0039, Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification2007-08-31031 August 2007 Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0724200172007-09-11011 September 2007 Request for Withholding Information from Public Disclosure in CS Innovations Topical Report 9100-00003-P for the Wolf Creek Generating Station Project stage: Withholding Request Acceptance ET 07-0041, Additional Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification2007-09-20020 September 2007 Additional Response to NRC Letter Dated August 8, 2007, Regarding the Main Steam and Feedwater Isolation System Controls Modification Project stage: Request ML0725503102007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in CS Innovations Report Submitted August 31, 2007 Project stage: Withholding Request Acceptance ML0724201352007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in Three CS Innovations Topical Reports Submitted April 18, 2007 for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502832007-11-0707 November 2007 Request for Withholding Information from Public Disclosure in CS Innovations Documents Submitted June 15, 2007, for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502682007-11-0808 November 2007 Request for Withholding Information from Public Disclosure in Topical Report Submitted June 15, 2007, for Wolf Creek Generating Station Project stage: Withholding Request Acceptance ML0725502012007-11-0808 November 2007 Request for Withholding Information from Public Disclosure in Topical Report Submitted April 18, 2007, for Wolf Creek Generating Station (Tac No. MD4839) Project stage: Withholding Request Acceptance ML0732001042007-11-16016 November 2007 Notice of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation to Discuss Main Steam and Feedwater Isolation System (Tac No. MD4839) Project stage: Meeting ML0733103642007-11-27027 November 2007 Revised Notice of Meeting with Wolf Creek Nuclear Operating Corp, to Discuss NRC Staff'S Request for Information on Licensee'S Supplemental Letter Dated September 27, 2007, to the Application Dated February 21, 2006, to Revise TS 5.5.9 Project stage: RAI ML0733101982007-11-27027 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation, to Discuss NRC Staff'S Request for Additional Information on Licensee'S Proposed Main Steam and Feedwater Isolation System Modification in Its Application Dated March 14, 2007 Project stage: RAI ML0731000102007-12-0707 December 2007 Request for Additional Information for the Main Stream and Feedwater Isolation System Modification (Tac No. MD4839) Project stage: RAI ML0729700242008-03-0303 March 2008 Issuance of License Amendment 175 Regarding Changes to Technical Specification Table 3.3.2-1 Project stage: Approval ML0729700282008-03-0303 March 2008 Tech Spec Pages for Amendment 175 Regarding Changes to Technical Specification Table 3.3.2-1 Project stage: Other ML0809801342008-04-16016 April 2008 Withholding from Public Disclosure, CS Innovations, 6101-00007, Msfis Instruction, Operation, and Maintenance Manual, Revision 1, Submitted March 14, 2008 Project stage: Other ML0809802612008-06-23023 June 2008 Wolf Creek,Request for Withholding Information from Public Disclosure in Als Architecture Evaluation and Sfis D3 Assessment Submitted February 28, 2008 Project stage: Withholding Request Acceptance ML0822703012008-07-29029 July 2008 CS Innovations Report 6002-00026, Rev. 1, Als Platform Overview, Non-Proprietary, Enclosure Viii Project stage: Request ML0822702982008-07-30030 July 2008 CS Innovations Report 6002-00002, Rev. 2, Als Configuration Management Plan, Non-Proprietary, Enclosure II Project stage: Request ML0822702962008-07-31031 July 2008 Transmitted of Resubmittal of Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Request ML0809802352008-08-18018 August 2008 Request for Withholding Information from Public Disclosure, Three Proprietary Documents, Affidavit Dated July 29, 2008, Executed by S. Sorenson, CS Innovations, LLC Project stage: Withholding Request Acceptance ML0902708252009-01-0909 January 2009 Enclosure II to Wm 09-0001, Msfis D3 Assessment, Rev 2 Project stage: Request ML0902708232009-01-14014 January 2009 Wolf Creek, Enclosure Iii to Wm 09-0001, Operation Plan, Rev 2 Project stage: Request WM 09-0001, Response to NRC Request for Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-01-16016 January 2009 Response to NRC Request for Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Response to RAI ML0902704262009-01-16016 January 2009 Wolf Creek, Enclosures Viii & Xxviii to Wm 09-0001 - CS Innovations Report 6002-00026, Als Platform Overview, Rev 2 Project stage: Request ET 09-0005, Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-01-29029 January 2009 Submittal of Requested Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Request ML0903406802009-02-0909 February 2009 Request for Withholding Information from Public Disclosure, Affidavit Executed by Steen Sorenson, CS Innovations LLC Project stage: Withholding Request Acceptance ET 09-0008, Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-02-17017 February 2009 Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Other ET 09-0011, Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification2009-02-27027 February 2009 Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification Project stage: Other ML0906505542009-03-0606 March 2009 Decontrolled Letter, Draft Safety Evaluation for Modifications to the Main Steam and Feedwater Isolation Control System for Review of Proprietary Information Project stage: Draft Approval ML0906202032009-03-27027 March 2009 Request for Withholding Information from Public Disclosure, WCGS Letter Dated 2/17/2009 Project stage: Withholding Request Acceptance ML0906103172009-03-31031 March 2009 Issuance of Amendment No. 181, Revise Licensing Basis, Modification of the Main Steam and Feedwater Isolation System Controls Project stage: Approval 2007-08-08
[Table View] |
|
---|
Category:Operating Plan
MONTHYEARML0902708232009-01-14014 January 2009 Wolf Creek, Enclosure Iii to Wm 09-0001, Operation Plan, Rev 2 WM 09-0001, Wolf Creek, Enclosure Iii to Wm 09-0001, Operation Plan, Rev 22009-01-14014 January 2009 Wolf Creek, Enclosure Iii to Wm 09-0001, Operation Plan, Rev 2 ML0717704582007-05-31031 May 2007 Dedication Plan WCN-9715DP, Rev. 1, for Replacement Msfis System ML0717704532007-05-31031 May 2007 Main Steam & Feedwater Isolation System (Msfis) Controls Replacement, Project Plan, Revision 1 ML0714501622007-05-0909 May 2007 Responses A78 - A79 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application Consisting of Fisherman'S Map of Coffey County Lake ML0714501532007-05-0909 May 2007 Responses A68 - A69 and A71 - A75 to Additional Information Needs Identified During Audit of NRC Request for Additional Information Related to License Renewal Application ML0714403802007-05-0909 May 2007 Responses 13 - 18, 20 - 25a & B, to Environmental Report - References of NRC Request for Additional Information Re License Renewal Application ML0714403742007-05-0909 May 2007 Responses 1, 2, 3, 5, 8, 9 & 10 to Environmental Report - References of NRC Request for Additional Information Re License Renewal Application ML0711603422006-09-16016 September 2006 Main Steam & Feedwater Isolation System (Msfis) Configuration Management Plan, Rev. 0 2009-01-14
[Table view] |
Text
Enclosure III to WM 09-0001 WCNOC Operation Plan, Rev. 2 Non-proprietary ALS Class 1 E Controls Operation Plan ADVANCED LOGIC SYSTEM (ALS)CLASS 1E CONTROLS OPERATION PLAN REVISION 2 PROJECT MANAGER -GREGG CLARKSON MANAGEMENT SPONSOR PATRICK GUEVEL EXECUTIVE SPONSOR TERRY GARRETT Wolf Creek Nuclear Operating Corporation PO Box 411 1550 Oxen Lane, NE Burlington, KS 66839 Revision 2 1/14/2009 Pa4 I of 6 ALS Class I E Controls Operation Plan Revision Control Rev # Approval Approval Date Description of Change(s)0 GWC 5/29/2007 Initial Revision 1 GWC 2/5/2008 Document overhaul for generic application at Wolf Creek for ALS Class IE Controls.
Added revision table. Added more specific wording for security requirements and referenced Regulatory Guide 1.152.2 GWC 1/14/2009 Included additional clarification regarding ASU connection in section 1.2.2 Revision 2 1/14/2009 Pa~ 2of6 Revision 2 1 /14/2009 Pao 2 of 6 ALS Class IE Controls Operation Plan Table of Content R E V IS IO N 1 .............................................................................................................................................................................
R I O p eration s P lan ..................................................................................................................................................................
4 1.1 Roles and Responsibilities
.......................................................................................................................................
4 1.1. 1 W C N O C ......................................................................................................................................................
4 1.1.2 Class I E Controls Supplier .........................................................................................................................
4 1.2 Security Requirements
..............................................................................................................................................
4 1.2.1 Physical Security .........................................................................................................................................
4 1.2 .2 C y b er S ecu rity .............................................................................................................................................
4 1.3 Implementation Characteristics
................................................................................................................................
5 1.4 P ro ced u res ................................................................................................................................................................
6 1.5 R eferen ces ................................................................................................................................................................
6 1.5.1 Regulatory Guide 1.152 -"Criteria for Digital Computers in Safety Systems of Nuclear Power P lan ts" .........................................................................................................................................................
6 Revision 2 1/14/2009 Pag[ 3 of 6 ALS Class I E Controls Operation Plan 1 O~perations Plan The purpose of the Operation Plan is to identify the roles and responsibilities of operating the ALS Class IE Controls equipment, identify the security requirements for the equipment, and address operational procedures required for the operation of the equipment.
1.1 Roles
and Responsibilities The following sections outline the roles and responsibilities for the operation of the ALS Class 1E Controls: 1.1.1 WCNOC WCNOC is the system owner and is ultimately responsible for the successful operation of the ALS Class lE Controls.
The WCNOC Operations Department has direct responsibility for operating the plant equipment.
The WCNOC Maintenance Department and System Engineering Group have ownership of the equipment to ensure it is operating and maintained properly.1.1.2 Class 1E Controls Supplier The Class 1E Controls Supplier is responsible for fulfilling Part 21 of 10CFR50, Appendix B. The Class 1E Controls Supplier is also responsible for delivery of the installation, operation, and maintenance manual.The installation, operation, and maintenance manual shall be incorporated into the WCNOC Documentation Controls system via the WCNOC Change Package process.1.2 Security Requirements This section discusses both the physical security and the cyber security of the ALS Class 1E Controls.
This section shall serve as the documentation of the security requirements as identified in Regulatory Guide 1.152 -"Criteria for Digital Computers in Safety Systems of Nuclear Power Plants".1.2.1 Physical Security The ALS Class 1E Controls equipment shall be located in the Control Building, specifically, the Main Control Equipment Room. This room is secured by the plant security system, which only allows authorized personnel into the area. If the particular application required installation of the ALS Class 1E Controls equipment is outside the Main Control Equipment Room, a revised Operation Plan shall be required.1.2.2 Cyber Security The ALS Class I E Controls Equipment shall not be permanently connected to either the corporate network of the Plant Process Computer.
The ALS Class lE Controls equipment provides the ability for the maintenance personnel to connect via a laptop computer, called an ASU, for the purposes of diagnostics and troubleshooting.
The operate/bypass switch for all valves within the specific ALS rack shall be physically placed in bypass prior to the ASU being connected to that ALS rack. This ensures the operators will no longer consider the valve control operable while the ASU is connected.
This requirement shall be Revision 2 1/14/2009 Pagý 4 of 6 ALS Class I E Controls Operation Plan implemented administratively within I&C procedures.
Additionally, only one ALS rack within the overall system shall have an ASU connected at any given time. The ALS Class lE Controls shall indicate this connection to the control room via the annunciator system. The ALS Class 1E Controls do not provide a data transmission mechanism to allow communications between applications or functions.
Therefore, there is no concern for the propagation of errors within and between functions for the ALS Class I E Controls.
In addition there are no concerns regarding cyber security, as the ALS Class 1 E Controls equipment is not connected to either the corporate network or the Plant Process Computer network.The ALS Class 1 E Controls equipment provides the ability for the maintenance personnel to connect via a laptop computer for the purposes of diagnostics and troubleshooting.
The laptop computer cannot change the ALS Class lE Controls equipment logic or configuration.
If a particular application of the ALS Class lE Controls equipment required this capability, a revised Operation Plan shall be required.1.3 Implementation Characteristics The ALS Class 1 E Controls are to be located in the existing cabinets for the particular system being replaced.
All operator information is available on the front-panel of the control racks. Controls and indicators shall be clearly labeled and grouped and show the state of the system for efficient evaluation of system status by the operator.
Figure 1-1 below provides an example of the front plate of an ALS Class 1 E Controls rack, this example provides the view of the front panel of the MSIV controls rack for the MSFIS application.
16 16... * *0 W0 Ut.t ca S , 4o~ ,~ c A 4 0-.t 0-.-~ iI M K ft Revision 2 1/14/2009 Pag~ 5 of 6 Revision 2 1 /14/2009 Pag4 5 of 6 ALS Class 1 E Controls Operation Plan Figure 1-1: Front Panel View of the MSIV Controls Rack for MSFIS 1.4 Procedures All procedures required for operation of ALS Class 1E Controls shall be generated or existing procedures revised as a part of the WCNOC Plant Modification Process. There are several aspects of the equipment operation that were implemented to limit the impact on the changes required in the existing operation procedures.
1.5 References
1.5.1 Regulatory
Guide 1.152 -"Criteria for Digital Computers in Safety Systems of Nuclear Power Plants" Revision 2 1/14/2009 Pagý 6 of 6