Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
|
MONTHYEARML1017602192010-06-22022 June 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 1 Project stage: Request ML1026401142010-09-16016 September 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4 Project stage: Request ML1030802102010-11-0404 November 2010 NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4 Project stage: Request ML1030906022010-11-0404 November 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 5 Project stage: Request ML1035103792010-12-17017 December 2010 NFPA 805 Transition Pilot Plant FAQ 08-0054, Revision 1 Project stage: Request ML1100704852011-02-0404 February 2011 Close-out of National Fire Protection Association Frequently Asked 07-0030 on Establishing Recovery Actions Project stage: Request ML1111804812011-04-21021 April 2011 NFPA 805 Transition FAQ 10-0059, Rev 1 Project stage: Request NG-11-0267, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128)2011-08-0505 August 2011 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128) Project stage: Request L-2011-312, Point Beach and St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Regarding Online Reference Portal2011-08-0505 August 2011 Point Beach and St. Lucie, Units 1 and 2 and Turkey Point, Units 3 and 4 - Regarding Online Reference Portal Project stage: Request ML11277A2852011-10-0303 October 2011 NRR E-mail Capture - FW: ME6818 - NFPA 805 Adoption Acceptance Review RAIs and Clarification Conference Call of 9/30/2011 Project stage: RAI NG-11-0384, Clarification of Information Contained in License Amendment Request (TSCR-128): Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128)2011-10-14014 October 2011 Clarification of Information Contained in License Amendment Request (TSCR-128): Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128) Project stage: Request ML11304A1242011-10-27027 October 2011 NRR E-mail Capture - ME6818 - Duane Arnold - LIC-109 Acceptance Review Results - Transition to 10 CFR 50.48(c) - Adoption of NFPA 805 Performance-Based Fire Protection Standard Project stage: Acceptance Review ML11304A1482011-10-28028 October 2011 NRR E-mail Capture - ME6818 - Duane Arnold Adoption of NFPA-805 - Generic List of Documents Requested for the Sharepoint Portal Project stage: Other ML11334A1502011-11-30030 November 2011 NRR E-mail Capture - ME6818 - DAEC NFPA-805 Adoption - Pre-Audit Discussion - 29 Nov 2011 Conference Call Project stage: Other ML12031A1122012-01-31031 January 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Afpb, Ihpb, Apla Request for Additional Information (RAI) Project stage: RAI ML12058A5702012-02-24024 February 2012 NRR E-mail Capture - ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET Project stage: RAI ML12058A5722012-02-27027 February 2012 NRR E-mail Capture - ME6818 - Clarification Conference Call of 2/22/2012 - Licensee and NRC Attendance - Supplemental Record Project stage: Other ML12079A2322012-03-19019 March 2012 NRR E-mail Capture - ME6818 DAEC 60/90 Day Matrix - RAI Processing Identifier Syntax Project stage: RAI NG-12-0177, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generational Plants2012-04-23023 April 2012 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generational Plants Project stage: Response to RAI ML12115A0782012-04-24024 April 2012 NRR E-mail Capture - FW: ACRS July 2012 NFPA-805 Subcommittee Meeting - Invitation for DAEC Participation Project stage: Meeting ML1214300352012-05-21021 May 2012 NFPA 805 Transition FAQ 12-0062, Revision 1 Project stage: Request NG-12-0225, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2012-05-23023 May 2012 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML12284A0212012-10-0808 October 2012 NRR E-mail Capture - ME6818 Duane Arnold NFPA-805 - Second Audit Visit Questions (Retrieved Copy) Project stage: Other NG-12-0419, Response to Second Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2012-10-15015 October 2012 Response to Second Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML12304A0692012-10-26026 October 2012 NRR E-mail Capture - ME6818, Additional RAIs for Duane Arnold Energy Center, LAR to Adopt NFPA 805 Project stage: RAI ML12318A3942012-11-0808 November 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Record of RAI Clarification Conference Call Conducted on 11/08/2012 Project stage: RAI ML12340A4502012-12-0505 December 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA 805 - Request for Additional Information (RAI) Items - Round 2 (More) Project stage: RAI ML12355A0722012-12-19019 December 2012 NRR E-mail Capture - FW: ME6818 - DAEC NFPA-805 Adoption - Record of Revisions to RAI Items, Expected Response Schedule, Participants List for Meetings on 17-18 December 2012 Project stage: RAI ML12361A0192012-12-23023 December 2012 NRR E-mail Capture - Supplement to ML12355A072 (RAI Issed as an Email on 12/19/2012, at 4:08 PM ET) Project stage: RAI NG-12-0502, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-01-11011 January 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0056, Response to RAI, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-02-12012 February 2013 Response to RAI, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0102, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-03-0606 March 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13070A0352013-03-0808 March 2013 NRR E-mail Capture - ME6818 - DA - NFPA-805 Adoption - Request for Portal Locations to Selected RAI Responses Project stage: RAI ML13084A0042013-03-22022 March 2013 NRR E-mail Capture - ME6818 DAEC Adoption of NFPA-805 - Request for Additional Information Project stage: RAI ML13098B0722013-04-0707 April 2013 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Request for Additional Information (Revised) Project stage: RAI ML13119A2202013-04-26026 April 2013 NRR E-mail Capture - FW: ME6818-DAEC-Adoption of NFPA-805- RAI Dated 4/7/2013 - Record of Clarification Call of April 11, 2013 Project stage: RAI NG-13-0182, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-05-0101 May 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13129A0742013-05-0808 May 2013 NRR E-mail Capture - ME6818 - DAEC - Adoption of NFPA 805 - Request for Additional Information (RAI) Project stage: RAI NG-13-0240, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-05-29029 May 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13175A3932013-06-27027 June 2013 Request for Additional Information for Review Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI NG-13-0281, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-07-0202 July 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0287, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-07-0202 July 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13210A4582013-07-30030 July 2013 Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants Project stage: Other NG-13-0318, Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generation Plants2013-08-0505 August 2013 Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generation Plants Project stage: Request NG-13-0341, Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-08-28028 August 2013 Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML13210A4492013-09-10010 September 2013 Issuance of Amendment Regarding Transition to a Risk-Informed Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) Project stage: Approval 2012-02-27
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000331/20240022024-10-25025 October 2024 NRC Inspection Report No. 07200032/2024001 and 05000331/2024002 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities NG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report ML24072A0292024-03-29029 March 2024 Nextera Energy Duane Arnold, Llc. Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report L-2023-029, And Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 And Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 – Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnolds Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 and Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks 2024-09-04
[Table view] |
Text
NEXTeraM EN ERC7-GYA A' ýARNOLD NG-13-0318 10 CFR 50.90 August 5, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket No. 50-331 Renewed Op. License No. DPR-49 Response to Revised License Condition For The License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard For Fire Protection For Liaht Water Reactor Generatina Plants
References:
- 1) License Amendment Request (TSCR-128):
Transition to 10 CFR 50.48(c) -NFPA 805, Performance-Based Standard For Fire Protection For Light Water Reactor Generating Plants (2001 Edition), NG-11-0267, dated August 5,2011 (ML11221A280)
- 2) Clarification of Information Contained in License Amendment Request (TSCR-128):
Transition to 10 CFR 50.48(c) -NFPA 805, Performance-Based Standard For Fire Protection For Light Water Reactor Generating Plants (2001 Edition), NG-1 1-0384, dated October 14, 2011 3) Letter, K. Feintuch (NRC) to R. Anderson, Revised License Condition For The License Amendment Request to Adopt National Fire Protection Association Standard 805, "Performance-Based Standard For Fire Protection For Light Water Reactor Generatina Plants." dated July 30. 2013 (ML13210A458)
In the Reference 1 letter, as clarified by Reference 2, NextEra Energy Duane Arnold, LLC (hereafter NextEra Energy Duane Arnold) submitted a License Amendment Request for the Duane Arnold Energy Center (DAEC) pursuant to 10 CFR 50.90. Subsequently, the NRC Staff proposed, via Reference 3, revised Operating License conditions.
The NRC Staff also requested that NextEra Energy Duane Arnold provide concurrence with the revised Operating License conditions.
NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324 Document Control Desk NG-13-0318 Page 2 of 2 This letter confirms that NextEra Duane Arnold is prepared to implement the fire protection license condition as stated within the timeline specified, as described in Reference
- 3. The enclosure to this letter contains a clean typed page 5 of the Operating License which reflects the revised operating license conditions.
Please note, that NextEra Energy Duane Arnold also proposes a change to Operating License condition (1) of Section C.(3). Operating License condition (1) references Operating License condition (2). The proposed changes to Operating License conditions (2) and (3) result in an administrative change to Operating License condition (1) such that it now references Operating License conditions (2) and (3).If you have any questions or require additional information, please contact J.Michael Davis at 319-851-7032.
I declare under penalty of perjury that the foregoing is true and correct.Executed on August 5, 2013 Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC
Attachment:
Revised Page 5 Of Operating License Changes (Clean, typed)cc: M. Rasmusson (State of Iowa)
Attachment to NG-1 3-0318 Revised Page 5 Of Operating License Changes (Clean, typed)1 page follows " Fire Alarm and Detection Systems (Section 3.8);" Automatic and Manual Water-Based Fire Suppression Systems (Section 3.9);" Gaseous Fire Suppression Systems (Section 3.10); and," Passive Fire Protection Features (Section 3.11).2. Fire Protection Program Changes that Have No More than Minimal Risk Impact Prior NRC review and approval are not required for changes to the licensee's fire protection program that have been demonstrated to have no more than a minimal risk impact. The licensee may use its screening process as approved in the NRC safety evaluation report dated _ to determine that certain fire protection program changes meet the minimal criterion.
The licensee shall ensure that fire protection defense-in-depth and safety margins are maintained when changes are made to the fire protection program.Transition License Conditions (1) Before achieving full compliance with 10 CFR 50.48(c), as specified by (2) and (3) below, risk-informed changes to the licensee's fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in (2)above.(2) The licensee shall implement the modifications to its facility, as described in Enclosure 2, Attachment S, Table S-1, "Plant modifications Committed," of DAEC letter NG-13-0287, dated July 2, 2013, to complete the transition to full compliance with 10 CFR 50.48(c) by December 31, 2014. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
(3) The licensee shall implement the items listed in Enclosure 2, Attachment S, Table S-2, "Implementation Items," of DAEC letter NG-13-0287, dated July 2, 2013, by ,2014.(4) The licensee is authorized to operate the Duane Arnold Energy Center following installation of modified safe-ends on the eight primary recirculation system inlet lines which are described in the licensee letter dated July 31, 1978, and supplemented by letter dated December 8, 1978.(5) Physical Protection NextEra Energy Duane Arnold, LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, Renewed License No. DPR-49 Amendment