St. Lucie, Units 1 and 2 - NRC Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations
ML14168A284
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/06/2014
From: Jensen J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2014-166, RIS-14-005
Download: ML14168A284 (2)


Text

0 FPL.June 6, 2014 L-2014-166 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 NRC Regulatory Issue Summary 2014-05 Preparation And Scheduling of Operator Licensinq Examinations On April 29, 2014, NRC issued Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations.

RIS 2014-05 requests licensees to submit, on a voluntary basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations and the NRC generic fundamentals examinations (GFEs).The NRC stated that this information would help the NRC to more effectively utilize its resources.

A response was requested within 30 days of receipt of RIS 2014-05.Enclosed please find the completed NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.Please contact us if there are any questions regarding this submittal.

Very truly yours, ,Jpie-drensen Site Vice President St. Lucie Plant JJ/tit Enclosure cc/enc: Malcolm T. Widmann, DRS, OB, RII Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/3012014 (09-2011)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internal e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION St. Lucie Plant II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY 2017 CY 2018 CY 2019 NUMBER OF REACTOR 0 8 0 8 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS

-INSTANT 0 NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 3/06/2017 3/11/2019 ALTERNATE DATE 3/13/2017 3/18/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (09-2011)