License Renewal Application, June 5, 2008 Conference Call Between Usnrc and Amergen to Discuss Draft Requests for Additional Information for Sections 4.2 and 4.4
ML081780006
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 07/23/2008
From: Robinson J E
NRC/NRR/ADRO/DLR
To:
AmerGen Energy Co
Robinson, J NRR/DLR/RPB1 415-2878
Shared Package
ML081780009 List:
References
TAC MD7701
Download: ML081780006 (9)


Text

July 23, 2008 LICENSEE: AmerGen Energy Company, LLC

FACILITY: Three Mile Island Nuclear Station, Unit 1

SUBJECT:

SUMMARY

OF CONFERENCE CALL WITH AMERGEN ENERGY COMPANY, LLC, TO DISCUSS DRAFT REQUESTS FOR ADDITIONAL INFORMATION FOR SECTIONS 4.2 AND 4.4 OF THE THREE MILE ISLAND NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION (TAC NO. MD7701)

On June 05, 2008, the U.S. Nuclear Regulatory Commission (NRC or the staff) conducted a conference call (teleconference) with representatives from AmerGen Energy Company, LLC (AmerGen), to discuss draft requests for additional information (RAIs) regarding Sections 4.2 and 4.4 of the Three Mile Island Nuclear Station, Unit 1 (TMI-1), license renewal application (LRA). Enclosure 1 lists the participants in the conference call.

The purpose of the conference call was so that AmerGen staff could gain clarification for specific items in the draft RAIs. Enclosure 2 is the draft RAIs that were sent by e-mail to the applicant (ADAMS Accession No. ML081710470). After the introductions, representatives of AmerGen and NRC clarified the purpose of the phone call which was to clarify the requests in the draft RAIs, and not for the applicant to provide answers. No staff decisions were made during the conference call.

Discussions during the conference call were as follows:

RAI-4.2.0.0-01/LRA Section 4.2

1. AmerGen to respond to request including providing its analysis that is done in accordance with BAW-2241P-A. 2. AmerGen to correct reference concerning Regulatory Guide 1.190, Revision 2, in response.

RAI-4.4.1.0-01/LRA Section 4.4.1

1. NRC staff will review LRA Appendix B (B.3.1.1) to determine if it contains the needed information and if so, the request will be deleted. 2. NRC staff will assess whether they will request this under RAI or address during the AMP Audit. Objective is not to duplicate. 3. Same as #2. 4. Same as #2.

RAI-4.4.1.0-02/LRA Section 4.4.1

1. NRC to review BAW-1999 and BAW-1847 and determine if they contain the needed information and if so, the request will be deleted. 2. Same as question 1 (above).
3. Deleted. RAI-4.4.1.0-03/LRA Section 4.4.1
1. NRC staff to review MRP-140 to determine if it contains the needed information and if so, the request will be deleted. 2. NRC staff will assess whether they will request this under RAI or address during the AMP Audit. Objective is not to duplicate. 3. Staff to review MRP-140 to determine if it contains the needed information and if so, the request will be deleted.

RAI-4.4.1.0-04/LRA Section 4.4.1

1. AmerGen to respond to request indicating that the impact of the power uprate on the leak before break (LBB) piping and fatigue flow growth analysis has been reviewed.

RAI-4.4.1.0-05/LRA Section 4.4.1

1. NRC staff will review Nickel Alloy and ISI Appendix B program descriptions and determine if request is still needed. AMP Audit may not look at non-GALL programs and request would still be needed.

RAI-4.4.2.0-01/LRA Section 4.4.2

1. This request will be combined with Draft RAI 4.4.2.0-02. AmerGen will respond to the combined question by clarifying the history and sequence of the analyses, and will provide the document referred to by Areva as the "51" document as part of the response.

RAI-4.4.2.0-02/LRA Section 4.4.2

1. Request will be combined with RAI 4.4.2.0-01. See above.

RAI-4.4.2.0-03/LRA Section 4.4.2

1. AmerGen will submit response, indicating that the TMI pump casings have no girth welds.

RAI-4.4.2.0-04/LRA Section 4.4.2

1. Deleted. Covered under RAIs 4.4.2.0-5 and 4.4.2.0-06.

RAI-4.4.2.0-05/LRA Section 4.4.2

1. AmerGen will submit a response indicating that the pump nozzle(s) are also covered and that the staff positions dated May 19, 2000, are satisfied.

RAI-4.4.2.0-06/LRA Section 4.4.2

1. Amergen will submit a response.

RAI-4.4.2.0-07/LRA Section 4.4.2

1. Amergen will submit a response indicating that that Section 4.4.2 is based on fully saturated material properties.

/RA/ Jay Robinson, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-289

Enclosure:

As stated

cc: See next page

ML081780009 (package), ML081780006 (memo), ML081710470 (enclosure 2) OFFICE LA:DLR DCI:CPNB DSS:SRXB PM:DLR:RPB1 BC:DLR:RPB1 NAME SFigueroa JTsao LLois JRobinson BPham DATE 07/01/08 07/09/08 07/03/08 07/15/08 07/23/08 Letter to AmerGen Energy Company, LLC from J. Robinson dated 07/23/08 DISTRIBUTION

SUBJECT:

SUMMARY

OF CONFERENCE CALL WITH AMERGEN ENERGY COMPANY, LLC, TO DISCUSS DRAFT REQUESTS FOR ADDITIONAL INFORMATION FOR SECTIONS 4.2 AND 4.4 OF THE THREE MILE ISLAND NUCLEAR STATION, UNIT 1, LICENSE RENEWAL APPLICATION (TAC NO. MD7701)

HARD COPY: DLR RF E-MAIL: PUBLIC RidsNrrDlr RidsNrrDlrRpb1 RidsNrrDlrRpb2 RdsNrrDlrRer1 RidsNrrDlrRer2 RidsOgcMailCenter -------------

SLopas JDaily JTsao LLois Enclosure 1 Conference Call between the U.S. Nuclear Regulatory Commission and AmerGen Energy Company, LLC To Discuss Draft Requests for Additional Information for Sections 4.2 and 4.4 of the Three Mile Island Nuclear Station, Unit 1 License Renewal Application List of Participants June 5, 2008

PARTICIPANTS AFFILIATION Jay Robinson U.S. Nuclear Regulatory Commission (NRC) John Daily NRC John Tsao NRC Lambros Lois NRC Fred Polaski AmerGen Energy Company, LLC (AmerGen) Ed Fuhrer AmerGen Gene Navertel AmerGen Bill McSorley AmerGen Mark Rinkle Areva Ashuck Nana Areva

Three Mile Island Nuclear Station, Unit 1 cc: Site Vice President - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057

Senior Vice President - Operations, Mid-Atlantic AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Chairman Board of County Commissioners of Dauphin County Dauphin County Courthouse Harrisburg, PA 17120 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Senior Resident Inspector (TMI-1) U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057

Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Plant Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057

Regulatory Assurance Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057 Ronald Bellamy, Region I U.S. Nuclear Regulatory Commission

475 Allendale Road King of Prussia, PA 19406 Ronnie Gardner, PMP Manager, Site Operations and Corporate Regulatory Affairs AREVA NP Inc. 3315 Old Forest Road OF-16 Lynchburg, VA 24501

Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Eric Epstein TMI Alert 4100 Hillsdale Road Harrisburg, PA 17112 Three Mile Island Nuclear Station, Unit 1 cc: Correspondence Control Desk AmerGen Energy Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348 Manager Licensing - Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

Mr. Charles G. Pardee Chief Nuclear Officer AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348

Associate General Counsel AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

Chief Operating Officer (COO) AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

Senior Vice President - Operations Support AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Kennett Square, PA 19348

Frederick W. Polaski Manager License Renewal Exelon Nuclear 200 Exelon Way Albert A. Fulvio, Senior Project Manager License Renewal Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348 Rich Janati, Chief Division of Nuclear Safety Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Michael Murphy Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469

Michael G. Brownell, Chief Water Resources Management Susquehanna River Basin Commission 1721 N. Front Street Harrisburg, PA 17102

Rachel Diamond, Regional Director Southcentral Regional Office Pennsylvania Department of Environmental Protection 909 Elmerton Avenue Harrisburg, PA 17110

Nancy Ranek Environmental Lead, License Renewal Exelon Nuclear 200 Exelon Way, KSA/2-E Kennett Square, PA 19348 Three Mile Island Nuclear Station, Unit 1 cc:

Christopher Wilson KSQ License Renewal Exelon Nuclear 200 Exelon Way, KSA/2-E Kennett Square, PA 19348 Mr. Michael P. Gallagher Vice President License Renewal Projects AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348