MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472023-07-0303 July 2023 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-046, Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal2023-06-0606 June 2023 Revision to Notice of Intent to Pursue Subsequent License Renewal - Schedule Submittal CNL-23-037, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Request2023-06-0101 June 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-034, 10 CFR 50.46 Annual Report2023-04-26026 April 2023 10 CFR 50.46 Annual Report CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-012, Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02)2023-04-11011 April 2023 Revision to the Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, (TS-19-02) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-018, Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540)2023-03-30030 March 2023 Request for Amendment Regarding Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves (BFN TS-540) CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-027, Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524)2023-03-29029 March 2023 Second Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b (BFN TS-524) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-019, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-322023-03-11011 March 2023 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative BFN-0-ISI-32 CNL-22-045, Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 42023-03-10010 March 2023 Application to Revise Technical Specifications to Adopt TSTF-566-A, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, and TSTF-580-A, Revision 1, Provide Exception from Entering Mode 4 CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533)2023-01-31031 January 2023 Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-011, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2023-01-18018 January 2023 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-089, License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546)2022-12-20020 December 2022 License Amendment Request for Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (BFN TS-546) CNL-22-090, Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval2022-12-12012 December 2022 Request to Use a Later Edition of the American Society of Mechanical Engineers Operation and Maintenance Code and Alternative Requests for the Fifth Inservice Testing Interval 2024-01-09
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-017 February 7, 2014 50.54(f) ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NFP-90 NRC Docket No. 50-390
Subject:
Update to Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Review of Available Physical Margin (APM) Assessments
References:
- 1. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident," dated March 12, 2012 Printed on recycled paper 2. NRC Letter to Nuclear Energy Institute, "Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features,"" dated May 31, 2012 3. TVA Letter to NRC, "Tennessee Valley Authority (TVA)-Fleet Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Flooding Walkdown Results of Recommendation 2.3 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-ichi Accident," dated November 27, 2012 U.S. Nuclear Regulatory Commission Page 2 February 7, 2014
- 4. NRC Letter, "Request for Additional Information Associated with Near
-Term Task Force Recommendation 2.3, Flooding Walkdowns,"
dated December 23, 2013
On March 12, 2012, the Nuclear Regulatory Commission (NRC) staff issued Reference 1 requesting information pursuant to Title 10 of the Code of Federal Regulations 50.54(f). of that letter contains specific requested information associated with Near
-Term Task Force Recommendation 2.3 for Flooding. Per Reference 2, the NRC endorsed Nuclear Energy Institute (NEI) 12
-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features," dated May 31, 2012.
By Reference 3, Tennessee Valley Authority (TVA) submitted its final report in response to the request for information.
The requirements of NEI 12
-07, section 5.8, "Documentation of Available Physical Margin,"
include: identify the available physical margin (APM) associated with each applicable flood protection feature; determine if the margin provided is small; and, evaluate any small margins that have potentially significant consequences through the corrective action program. The results of this effort were to be maintained on site for future NRC audits.
Following the NRC staff's initial review of the walkdown reports, regulatory site audits were conducted at a sampling of plants.
Based on the walkdown report reviews and site audits, the staff identified additional information necessary to allow them to complete its assessments. Accordingly, by Reference 4, the NRC staff has issued a request for additional information (RAI).
Reference 4 requested a response by January 31, 2014.
TVA requested an extension to February 7, 2014, via phone call with the Watts Bar Nuclear Plant (WBN) NRC Project Manager on January 29, 2014. The RAI questions and TVA's responses for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3, Sequoyah Nuclear Plant (SQN), Units 1 and 2, and WBN, Unit 1, are provided below.
RAI 1 Confirmation that the process for evaluating APM was reviewed.
TVA Response: TVA has completed a review of the process used at BFN, Units 1, 2, and 3, SQN, Units 1 and 2, and WBN , Unit 1, to evaluate APMs.
RAI 2 Confirmation that the APM process is now or was always consistent with the guidance in NEI 12-07 and discussed in this RAI.
U.S. Nuclear Regulatory Commission Page 3 February 7, 2014 TVA Response:
The original walkdown effort followed the guidance provided in NEI 12
-07, including a definition for a small margin. Additional actions have been taken to make the process consistent with the information provided in this RAI.
RAI 3 If changes are necessary, a general description of any process changes to establish this consistency.
TVA Response:
As stated above, the original walkdown effort followed the guidance provided in NEI 12
-07, including a definition for a small margin.
However, a specific APM had not been assigned to the seals associated with flood protection features.
These items have now been addressed in accordance with the guidance provided in this RAI and entered into the corrective action process, as appropriate, for further evaluation.
RAI 4 As a result of the audits and subsequent interactions with industry during public meetings, NRC staff recognized that evaluation of APM for seals (e.g., flood doors, penetrations, flood gates, etc.) was challenging for some licensees.
Generally, licensees were expected to use either Approach A or Approach B (described below) to determine the APM for seals:
a) If seal pressure ratings were known, the seal ratings were used to determine APM (similar to example 2 in Section 3.13 of NEI 12
-07). A numerical value for APM was documented.
No further action was performed if the APM value was greater than the pre
-established small
-margin threshold value.
If the APM value was small, an assessment of "significant consequences" was performed and the guidance in NEI 12
-07 Section 5.8 was followed.
b) If the seal pressure rating was not known, the APM for seals in a flood barrier
is assumed to be greater than the pre
-established small
-margin threshold value if the following conditions were met: (1) the APM for the barrier in which the seal is located is greater than the small
-margin threshold value, and (2) there is evidence that the seals were designed/procured, installed, and controlled as flooding seals in accordance with the flooding licensing basis.
Note that in order to determine that the seal has been controlled as a flooding seal, it was only necessary to determine that the seal configuration has been governed by the plant's design control process since installation.
In this case, the APM for the seal could have been documented as "not small".
U.S. Nuclear Regulatory Commission Page 4 February 7, 2014
As part of the RAI response, state if either Approach A or Approach B was used as part of the initial walkdowns or as part of actions taken in response to this RAI. No additional actions are necessary if either Approach A or B was used.
If neither Approach A or B was used to determine the APM values for seals (either as part of the walkdowns or as part of actions taken in response to this RAI), then perform the following two actions:
Enter the condition into the CAP (note: it is acceptable to utilize a single CAP entry to capture this issue for multiple seals).
CAP disposition of "undetermined" APM values for seals should consider the guidance provided in NEI 12
-07, Section 5.8.
The CAP disposition should confirm all seals can perform their intended safety function against floods up to the current licensing basis flood height. Disposition may occur as part of the Integrated Assessment.
If an Integrated Assessment is not performed, determine whether there are significant consequences associated with exceeding the capacity of the seals and take interim action(s), if necessary, via the CAP processes.
These actions do not need to be complete prior to the RAI response.
Report the APM as "undetermined" and provide the CAP reference in the RAI response. TVA Response: As part of the initial walkdowns, TVA performed visual inspections of seals (e.g. flood doors, penetrations, flood gates, etc.) at BFN, Units 1, 2, and 3, SQN, Units 1 and 2, and WBN , Unit 1. All seals were inspected for signs of degradation, and corrective actions were taken, if required.
TVA used a combination of Approach A and Approach B as part of the initial walkdowns.
If seal pressure rating data was known, the seal ratings were used to determine APM (similar to example 2 of Section 3.13 of NEI 12
-07), then a numerical value for APM was documented. If no seal rating information was available, then the APM was assumed to be greater than the established small
-margin threshold value if the flood licensing basis documentation provided evidence that the seals were designed/procured, installed, and controlled as flooding seals.
For BFN, Units 1, 2, and 3:
As part of the actions taken to address this RAI, an APM value was determined for some flood seal
- s. If an APM could not be determined for a seal, an APM value of "undetermined" was assigned and the seal has been entered into the CAP for further evaluation of its available physical margin.
Disposition will occur as part of the Integrated Assessment or if significant consequences associated with exceeding the capacity of the seals are determined, interim actions will be pu rsued, if necessary, via the CAP
. The CAP reference for BFN is Problem Evaluation Report (PER) number 840938.
U.S. Nuclear Regulatory Commission Page 5 February 7, 2014 For SON , Units 1 and 2: As part of the actions taken to address this RAI , an APM value was determined for each flood seal. It is noted , after the flooding walkdowns and prior to receipt of this RAI , TVA identified in the CAP degraded/nonconforming issues with seal penetrations in the Essential Raw Cooling Water (ERCW) building. Corrective actions are in place and scheduled to resolve these issues. Additional flood seal documentation has been established for the Diesel Generator Building. Documentation of flood seals for the Unit 1 and 2 Shield Buildings are in progress.
The corrective actions are documented in CAP PER number 655763. For WBN , Unit 1: As part of the actions taken to address t his RAI , APM values were determined for flood seals in accordance with a combination of Approach A and Approach B. This letter contains no new regulatory commitments.
If you have any questions regarding this submittal, please contact Kevin Casey at (423) 751-8523. I declare under penalty of perjury tha t the foregoing is true and correct. Executed on the 7th day of February 2014. cc: NRC Regional Administrator
-Region II NRR Director-NRC Headquarters NRC Senior Resident Inspector-Browns Ferry Nuclear Plant NRR Project Manager-Browns Ferry Nuclear Plant NRC Senior Resident Inspector-Sequoyah Nuclear Plant NRR Project Manager-Sequoyah Nuclear Plant NRC Senior Resident Inspector-Watts Bar Nuclear Plant NRR Project Manager-Watts Bar Nuclear Plant