Loss-of-Coolant Accident Reanalysis Schedule
ML15202A152
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/21/2015
From: Boles B D
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-15-199
Download: ML15202A152 (1)


Text

FE NOCŽ FirstEnergy Nuclear Operating Company Brian D. Boles Vice President, Nuclear July 21, 2015 L-15-199 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Loss-of-Coolant Accident Reanalysis Schedule 5501 North State Route 2 Oak Harbor, Ohio 43449 10 CFR 50.46 419-321-7676 Fax: 419-321-7582 By letter dated August 19, 2013 (Accession No. ML 13231A020), FirstEnergy Nuclear Operating Company (FENOC) stated that the loss-of-coolant accident (LOCA) reanalysis for the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) would be completed on or before December 15, 2014. By letter dated December 10, 2014(ML14345A115)

FENOC notified the Nuclear Regulatory Commission (NRC) of a schedule delay and an expected completion date of July 31, 2015. The schedule for the LOCA reanalysis for DBNPS has been further delayed and the expected completion date is now June 15, 2016. There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Fleet Licensing at (330) 315-6810.

Sincerely, Brian D. Boles cc: NRC Region Ill Administrator Nuclear Reactor Regulation Project Manager NRC Resident Inspector Utility Radiological Safety Board