L-2017-117, Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1

From kanterella
Revision as of 02:00, 28 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1
ML17173A105
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/20/2017
From: Snyder M J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2017-117
Download: ML17173A105 (6)


Text

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20.555 Re: St. Lucie Unit 2 Docket No. 50-389 In-Service Inspection Program JUN 2 0 2017 ISI Fourth Interval -First Period -SL2-23 Refueling Outage Owner's Activity Report (OAR-1) L-2017-117 10 CFR 50.36 10 CFR 50.55a Enclosed is the St. Lucie Unit 2, SL2-23 outage, Owner's Activity Report, Form OAR-1. The OAR-1 report is prepared, certified, and submitted upon completion of each refueling outage. The SL2-23 refueling outage ended on March 24, 2017. Please contact Ken Frehafer at 772-467-77 48 if there are any questions about this submittal.

Sincerely, Michael J Snyder Licensing Manager St. Lucie Plant MJS/KWF Attachment cc: NRC Region II Administrator St. Lucie Plant NRC Senior Resident Inspector Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957 L-2017-117 Attachment Page 1of5 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Plant

  • St Lucie Nuclear Power Plant Unit 2 6501. South Ocean Drive Jensen Beach, Florida 34957 Commercial Service Date: August 8, 1983 Refueling Outage No.: SL2-23 Current Inspection Interval:

ISi-Fourth, IWE-Secohd Current Inspection Period:-!Sl-flrst, IWE.:.Third Edition and Addenda of Section XI applicable to the inspection plans: ISi -2007 with Addenda through 2008 !WE -2001 Edition with Addenda through 2003 Date and Rev.lsion of inspection plans: ISi-January 30, 2017, Revision 2, 17, 201:5, .Revision 2 Edition and Addenda of Section XI applicable to. repairs and rep!acern,ehts, if different than the inspection plan: Sarne Code Cases Used: N-532-5. N-586-1 N-649 N-706-'1 N-722-1 N-751 N-729-1 & N-770-'.1.

CERTIFICATE OF CONFORMANCE I certify that. (a) the statements made in this report are correct; (b) the examinations and tests meet.the Inspection plan as requ.ired by the ASME Code,Section XI; and (c) the repairlreplacemenf activities and .evaluations supporting the completiop ofSL2..:23

'?)nfbrm to the requirements of Section XL .

J,1 / fl'-t' :R. i). bJ 1,i Pk.ct Rw;r.i-..-v.l

'i 7 A.Jy Date f.v * / s;. I=;-Owner or.Owner's Designee, Title . -CERTIFICATE OF INSERVICE lNSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company*of

  • Connecticut have .inspected the items described in this Owner's . .Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance With the requirements ofSection XL By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concemlng the repair/replacement activities and evaluation described in *this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for ariy person<1I injury or property damage or loss ofany kind arising from or conn.ected

\Ni t

  • s *
  • I: \'.

L-2017-117 Attachment Page 2 of 5 FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 1 ITEMS WITH FLAWS OR REVELANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE E:i..>amlnation Category and *item Number None PSL 2 ..., JS!. 4 TH Interval, tst Period -Outcige 23 . PSL 2 -!WE 21)d Interval, Period -Outage 23 Item Description Evaluation bescripticm None None i I I "! I I I I *I l I l l I I I t I I f 1* I I i I f: u n ' li E *f: .. ! ' ;{ I f t g tt !; fi f i :;: t I

  • l I D i R *" i a '
  • I ! ii" ' t i f' I r J *1 t* l L-2017-117 Attachment FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE2 ABSTRACT REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE PSL 2 ISi 4TH Interval, 1st Period -Outage 23 PSL 2 -IWE 2nd Interval, 3rd Period -Outage 23 Code Item Description Date Repair./ Class Description ofV\!c>rk Completed Replacement Plan Number 3 HCV-14-88 REPLACE VALVE AND FLANGE 5/17/2017 SL2-13055
  • FASTENERS WELD BUILD UP OF PUMP ! .INTERNALS TO OBTAIN PROPER 2 LPSI PP 2B FJTFOR NEW STUFFING BOX AND 5/24/2017 SL2-13064 INSTALL COUPLING RETROFIT KIT PER EC275737 1 SE-02-3 REPLACEMENT OFVALVE AND 6113/2017 SL2-13069 ADJACENT Pl PING BY WELDING 3 CW-10 WELD BUILDUP ON FLANGES TO 6/14/2017 SL2-15011 RESTORE THICKNESS REPAIR THROUGH-WALL LEAK BY 3 CW-72 WELDING UTILIZING CODE CASE N-11/11/20'.15 SL2*'15065 661-2 REPLACE ELBOW FASTENERS 3 CW-72 FOLLOWING INTERNAL 5/312017 Sl2-15065
  • INSPl3CTION

.3 HCV-21-7A REPLACE VALVE BY FLANGED 5/4/2017 Sl2-15066 . CONNECTION 2 V2326 REPLACE REL! EF VAL VE 5/4/2017 Sl2-16001 INTERNALS PERFORM WELD BUILDUP OF 3 HCV-21-78 VALVE AND PIPE FLANGE 5/24/2017 SL2-16012 SURFACES *3 V21208 REPLACE VALVE FLANGE 5/3/2017 SL2-16013 FASTENERS 1 *sG2B REPLACE SG 28 PRIMARY 6/13/2017 SLZ-16014 MANWAY *STUD 1 SG2B MACHINE REPLACEMENT STUD 6/13/2017 Sl2-'.16014 PER VENDOR RECOMMENDATIONS 1 PZR REPLACE PRESSURIZER MANWAY 6/15/2017 SL2-16015 STUDS/NUTS

! INSTALL SEAL WELD FOLLOWING 2 V3495 INTERNAL VALVE INSPECTION 5/25/2017 SL2-16016

  • REPLACE MAIN STEAM SAFETY I 2 V8202 RELIEF VALVE FASTENERS 5/3112017 SL2-16017 3 V2115. REPLACE RELIEF VALVE FLANGE 5/1712017 SL2-16019 FASTENERS 2 V2324
  • REPLACE RELfEF VALVE : INTERNALS OF REMOVED VALVE 5/3112017 SL2-16.020 REPLACE RELIEF VALVE 2 V2325 INTERNALS 5/3/2017 SL2-16021 L-2017-117 Attachment FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2 Code Date Class Item Description Description of Work Completed 1 V3527 REPLACE CHECK VALVE 6/13/2017 FASTENERS 2 V8203 REPLACE RELIEF VALVE INTERNALS AND FASTENERS FUEL POOL REPLACE FLANGE FASTENERS

.. i 3 PP2B 5/4/2017 2 FCV-25-26 REPLACEVALVEFASTENERS

.. 6/112017 1 S!G2A INSTALL TU!3E PLUGS IN 2A SIG 5/18/2017

2. V8209 REPLACE REUEF VALVE AND 5/4/2017 FASTENERS ATTACH REVISED NAMEPLATE

-.MC CNTMNTVSL FOLLOWING RE-RA TJNG OF 5/4/2017 CONTAINMENT VESSEL EXTERNAL PRESSURE REPLACE RELIEF VAf..VE 2 V8212 INTERNALS AND FASTENERS 5/31/2017 2 V8216 REPLACE RELIEF VALVE 5/3112017

' INTE:RNALS AND FASTENERS 3 CW-105 PREFABRICATE REPLACEMENT 5124/2017 PIPE ELBOW SPOOL BY WELDING I REPLACE PIPE ELBOW BY 3 CW-105 WELDING AND FLANGED 5/25/2017 CONNECTION REPLACE GODE SAFETY RELIEF 1 V1200 VALVE INTERNALS AND INLET 5/31/2017 FASTENERS 1 V1201 REPLACE GODE SAFETY RELIEF 5/3112017 VALVE INTERNALS . . ... 3 HCV-14-10 REPLACE VALVE AND FASTENERS 5/4/2017 2 V3107 REPLACE VALVE FASTENERS I :Sl1/2017 3 HCV-25..:.3 lNSTALL FLANGES BY WELDING 5117/2017 AND BOLTED CONNECTION 3 HCV-25-4 INSTALL FLANGES BY WELDING 5/24/2017 AND BOLTED *CONNECTION REPLACE PIPE SPOOLS CW-72-4 3 CW-72 AND CW-72-5 BY WELDING AND 5/25/2017 BOLTED CONNECTIONS 3 V08163

  • TACKWELDSEATRINGTOVALVE
  • 5/3/2017 BODY 1 V3247 REPLACE VALVE FASTENERS 5f31/2017 1 V3526 REPLACE VALVE DISC AND 5131/2017 FASTENERS 3 . REPLACE SPRING CAN SUPPORT 6115/2017 BY WELDING 2 CS-2 REPLACE TWO SPRING CAN i 5/i8/2017 SUPPORTS BYWELDING I I I J I l I Page 4 of s-Repair I Replacement Plan Number Sl2-16022 SL2-16023 SL2-16024 SL2-16025 SL2-16027 SL2-16029 SL2-16030 SL2*16031 SL2-16032 SL2-16035 SL2-16035 SL2-16036 SL2-16037 SL2-t6041 Sl2-16042 SL2-17001 SL2-17002 SL2-17003 SL2-17004 SL2-17006 SL2-17011 SL2-17012 I I ! I I I I I i i ! ..

L-2017-117 Attachment FORM OAR-1 OWNER,S ACTIVITY REPORT TABLE2 Code I Date Cf ass item Description Description of Work Completed REPLACE Pf PE SECTION BY 1 CH-147 WELDING FOR LICENSE RENEWAL 5/18/20'[7 DESTRUCTIVE TESTING. REPLACE SOLENOID VALVE SEAL. 2 SE-03-2A WELD FOLLOWING INTERNAL 5/3/2017 VALVE INSPECTION 1 SE-02..:1 REPLACE VALVE AND ADJACENT 6/1/2017 PIPING BY WELDJNG REMOVE AND :RE-INSTALL

.. 2 CC-2080-25 SECTION OF PIPE SUPPORT BY: 5{18/2017 WELDING REMOVE AND RE-INSTALL 2 CC-2080-30 SECTION OF PIPE SUPPORT BY 5/17/2017 WELDING 2. CC-2080-33 REPLACE SECTION OF PIPE. 5/18/2017.

SUPPORT BY WELDING 3 SS-21-18 REPLACE STRAINER FASTENERS 5/4/2017 1 l 028 1 REPLACE SNUBBER 028 5131/2017 Page 5 of 5 Repair I Replacement Plan Number SL2-*F019 SL2-17023 SL2-17026 SL2-17027 SL.2-17027 SL2-17027 SL2:..1JQ29 SL2-17031 I ;, t I I I I