MONTHYEARWM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) WM 22-0004, Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment2022-07-27027 July 2022 Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment WM 22-0003, Operating Corp. - Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment2022-05-26026 May 2022 Operating Corp. - Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel - Form 405F Amendment WM 21-0005, Supplement to License Amendment Request for Change to Owner Licensee Names2021-05-24024 May 2021 Supplement to License Amendment Request for Change to Owner Licensee Names WM 21-0003, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2021-03-31031 March 2021 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) WM 20-0006, (WCGS) - License Amendment Request for Change to Owner Licensee Names2020-11-0404 November 2020 (WCGS) - License Amendment Request for Change to Owner Licensee Names WM 20-0009, Notification of Readiness for Supplemental Inspection 927222020-09-0808 September 2020 Notification of Readiness for Supplemental Inspection 92722 WM 19-0022, Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel2019-07-17017 July 2019 Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel WM 19-0017, Operating Corp., Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel2019-04-25025 April 2019 Operating Corp., Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel WM 19-0008, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2019-04-10010 April 2019 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) WM 19-0009, Operating Corporation Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors, and Executive Personnel2019-03-25025 March 2019 Operating Corporation Foreign Ownership, Control or Influence Information - Change to Lists of Owners, Officers, Directors, and Executive Personnel WM 19-0006, Operating Corp Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel2019-02-20020 February 2019 Operating Corp Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel WM 19-0003, Notice of Violation and Proposed Imposition of Civil Penalty Statement of Method of Payment2019-01-16016 January 2019 Notice of Violation and Proposed Imposition of Civil Penalty Statement of Method of Payment WM 19-0002, Transmittal of Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel2019-01-10010 January 2019 Transmittal of Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel WM 18-0047, Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel2018-10-0808 October 2018 Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel WM 18-0040, Transmittal of Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel2018-07-25025 July 2018 Transmittal of Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel WM 18-0039, Schedule for the Wolf Creek Nuclear Operating Corporation (WCNOC) Re-Analysis of the LBLOCA and SBLOCA Using the Full Spectrum LOCA (Fsloca) Methodology and the Performance and Analysis Design (PADS) Model, Amendment 213 License Condition2018-07-0303 July 2018 Schedule for the Wolf Creek Nuclear Operating Corporation (WCNOC) Re-Analysis of the LBLOCA and SBLOCA Using the Full Spectrum LOCA (Fsloca) Methodology and the Performance and Analysis Design (PADS) Model, Amendment 213 License Condition t WM 18-0037, Transmittal of Wolf Creek Nuclear Operating Corporation'S(Wcnoc) and Its Owner Companies' Updated Lists of Owners, Officers, Directors and Executive Personnel (Oodep)2018-06-28028 June 2018 Transmittal of Wolf Creek Nuclear Operating Corporation'S(Wcnoc) and Its Owner Companies' Updated Lists of Owners, Officers, Directors and Executive Personnel (Oodep) WM 18-0035, Notice of Receipt of Regulatory Approvals & Closing Date2018-05-29029 May 2018 Notice of Receipt of Regulatory Approvals & Closing Date WM 18-0034, Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel2018-04-26026 April 2018 Foreign Ownership, Control or Influence (FOCI) Information - Change to Lists of Owners, Officers, Directors and Executive Personnel WM 17-0021, Updated Request for Consent to Indirect Transfer of Control2017-09-0505 September 2017 Updated Request for Consent to Indirect Transfer of Control WM 16-0016, Response to Non-Cited Violation 050000482/2016003-012016-12-0808 December 2016 Response to Non-Cited Violation 050000482/2016003-01 WM 16-0013, Operating Corp., Request for Consent to Indirect Transfer of Control2016-07-22022 July 2016 Operating Corp., Request for Consent to Indirect Transfer of Control WM 16-0006, Reply to Notice of Violation EA-16-0182016-03-10010 March 2016 Reply to Notice of Violation EA-16-018 WM 16-0005, Submittal of Updated Safety Analysis Report (Usar), Revision 292016-03-10010 March 2016 Submittal of Updated Safety Analysis Report (Usar), Revision 29 WM 15-0017, Commitment to Maintain Severe Accident Management Guidelines2015-12-14014 December 2015 Commitment to Maintain Severe Accident Management Guidelines WM 14-0026, 30-Day Response on Planned Actions to Restore Compliance Regarding Essential Service Water Design Issues2014-12-16016 December 2014 30-Day Response on Planned Actions to Restore Compliance Regarding Essential Service Water Design Issues WM 14-0024, Cel Inspection Readiness Letter 11-13-142014-11-13013 November 2014 Cel Inspection Readiness Letter 11-13-14 WM 14-0017, Reply to a Notice of Violation; EA-14-0242014-07-29029 July 2014 Reply to a Notice of Violation; EA-14-024 WM 14-0016, Notification of Readiness for Supplemental Inspection2014-07-0808 July 2014 Notification of Readiness for Supplemental Inspection WM 14-0011, Change to an Essential Service Water System Water Hammer Mitigation Commitment2014-05-0808 May 2014 Change to an Essential Service Water System Water Hammer Mitigation Commitment WM 14-0013, Voluntary Commitment Regarding Containment Coolers at Wolf Creek Generating Station2014-05-0808 May 2014 Voluntary Commitment Regarding Containment Coolers at Wolf Creek Generating Station WM 14-0008, Request for Regulatory Conference (EA-14-024)2014-04-0909 April 2014 Request for Regulatory Conference (EA-14-024) WM 13-0021, Response to NRC Letter Regarding Work Environment Issues at Wolf Creek Generating Station2013-09-18018 September 2013 Response to NRC Letter Regarding Work Environment Issues at Wolf Creek Generating Station WM 13-0014, Commitment to NRC Regarding Actions Necessary to Increase Safety Margins Through Ongoing Actions to Resolve Substantive Cross-Cutting Issues (Sccis)2013-06-27027 June 2013 Commitment to NRC Regarding Actions Necessary to Increase Safety Margins Through Ongoing Actions to Resolve Substantive Cross-Cutting Issues (Sccis) WM 13-0008, Notification of Readiness for Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area2013-04-30030 April 2013 Notification of Readiness for Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area WM 13-0002, Operating Corporation - Response to NRC Follow-Up Letter on Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.32013-02-26026 February 2013 Operating Corporation - Response to NRC Follow-Up Letter on Technical Issues for Resolution Regarding Licensee Communication Submittals Associated with Near-Term Task Force Recommendation 9.3 WM 12-0041, Operating Corporation - Submittal of Emergency Preparedness Communications Assessment Results in Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3.2012-10-31031 October 2012 Operating Corporation - Submittal of Emergency Preparedness Communications Assessment Results in Response to Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 9.3. WM 12-0039, Reply to Notice of Violation EA-12-1522012-10-18018 October 2012 Reply to Notice of Violation EA-12-152 WM 12-0029, Response to NRC Augmented Inspection Team Follow-up Report 05000482/2012009; Preliminary Yellow Finding2012-08-15015 August 2012 Response to NRC Augmented Inspection Team Follow-up Report 05000482/2012009; Preliminary Yellow Finding WM 12-0023, Reply to Notice of Violation EA-12-1352012-08-0202 August 2012 Reply to Notice of Violation EA-12-135 WM 12-0013, Notification of Readiness for Inspection of Human Performance and Problem Identification and Resolution Safety Culture Themes2012-05-0707 May 2012 Notification of Readiness for Inspection of Human Performance and Problem Identification and Resolution Safety Culture Themes WM 12-0008, Operating Corporation'S Answer to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event (Order Number EA-12-049)2012-04-0202 April 2012 Operating Corporation'S Answer to March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event (Order Number EA-12-049) WM 12-0010, Receipt Confirmation for Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-04-0202 April 2012 Receipt Confirmation for Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident WM 12-0009, Operating Corporation'S Answer to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2012-04-0202 April 2012 Operating Corporation'S Answer to March 12, 2012 Commission Order Modifying License with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) WM 12-0003, Response to NRC Request for Additional Information Regarding 60-day Response to NRC Bulletin 2011-01,Mitigating Strategies2012-01-15015 January 2012 Response to NRC Request for Additional Information Regarding 60-day Response to NRC Bulletin 2011-01,Mitigating Strategies WM 11-0011, 30 Day Response to Mid-Cycle Performance Review and Inspection Plan - Wolf Creek Generating Station2011-09-30030 September 2011 30 Day Response to Mid-Cycle Performance Review and Inspection Plan - Wolf Creek Generating Station WM 11-0009, Reply to Notice of Violation EA-11-1492011-09-0909 September 2011 Reply to Notice of Violation EA-11-149 WM 10-0029, Reply to Notice of Violation EA-10-1602010-10-11011 October 2010 Reply to Notice of Violation EA-10-160 WM 10-0024, Day Response to Mid-Cycle Performance Review and Inspection Plan2010-09-30030 September 2010 Day Response to Mid-Cycle Performance Review and Inspection Plan 2023-05-10
[Table view] |
Text
W.LF CREEK JNUCLEAR OPERATING CORPORATION June 1, 2007 Matthew W. Sunser Vice President Oversight WM 07-0050 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Reference:
- 1) Letter ET 06-0038, dated September 27, 2006, from T. J. Garrett, WCNOC, to USNRC 2) Letter dated May 6, 2007, from V. Rodriguez, USNRC, to T. J. Garrett, WCNOC (ML071220180)
Subject:
Docket No. 50-482: Response to NRC Requests for Additional Information Related to Wolf Creek Generating Station License Renewal Application Gentlemen:
Reference 1 provided Wolf Creek Nuclear Operating Corporation's (WCNOC) License Renewal Application for the Wolf Creek Generating Station (WCGS). Reference 2 requested additional information regarding the License Renewal Application.
Attachment I provides the WCNOC response to each NRC request.Attachment II provides a summary of the commitment made in this response.If you have any questions concerning this matter, please contact me at (620) 364-4008, or Mr.Kevin Moles at (620) 364-4126.Sincerely, Matthew W. Sunseri MWS/rlt P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET-A!I2- /
WM 07-0050 Page 2 of 3 Attachment I: Response to NRC Request for Additional Information Attachment I1: List of Commitments cc: J. N. Donohew (NRC), w/a V. G. Gaddy (NRC), w/a B. S. Mallett (NRC), w/a V. Rodriguez (NRC), w/a Senior Resident Inspector (NRC), w/a WM 07-0050 Page 3 of 3 STATE OF KANSAS COUNTY OF COFFEY))Matthew W. Sunseri, of lawful age, being first duly sworn upon oath says that he is Vice President Oversight of Wolf Creek Nuclear Operating Corporation; that he has read the foregoing document and knows the contents thereof; that he has executed the same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.Matthew W. Sunseri Vice President Oversight SUBSCRIBED and sworn to before me this I day ofJT110, 2007.Notary Public Expiration Date L D1* )
Attachment I to WM 07-0050 Page 1 of 5 Attachment I WCNOC Response to NRC Requests for Additional Information (ML071220180)
Dated May 6, 2007 RAI 2.3.1.1-1 RAI 2.3.2.6-1 RAI 2.3.2.10-1 RAI 2.3.3.7-1 RAI 2.3.3.7-2 RAI 2.3.3.7-3 Attachment I to WM 07-0050 Page 2 of 5 WCNOC Response to NRC Requests for Additional Information (ML071220180)
Dated May 6, 2007 Reactor Vessel and Internals RAI 2.3.1.1-1 Updated Safety Analysis Report (USAR) Figures 18.2-1 and 18.2-13 show the reactor head vent system and the reactor vessel level instrumentation system, respectively.
The staff requests that the applicant indicate which portions of the reactor head vent system are within the scope of license renewal. In addition, the applicant should clarify if the spare head penetration of the level instrumentation system is within the scope of license renewal. The staff requests that the applicant identify which license renewal criteria these components meet and their intended functions.
RAI 2.3.1.1-1 Response The portions of the reactor head vent system that are within the scope of license renewal are shown in the boundary drawing LR-WCGS-BB-M-12BB04.
The boundary starts from the connection with the vessel head (zone E-4) up to the second isolation valves (zones F-2 and G-2). These components have the intended function of pressure boundary and are in scope for the criteria of 10CFR54.4(a)(1).
The reactor vessel level instrumentation system (RVLIS) used a spare vessel head penetration for the upper level tap. The vessel head still has several blind flanged spare penetrations, all of which have the intended function of pressure boundary and are in scope for the criteria of 1OCFR54.4(a)(1).
The portions of the RVLIS that are within the scope of license renewal are also shown on boundary drawing LR-WCGS-BB-M-12BB04 (zone E-4 to F-5). The head penetration of the level instrumentation system and the spares are addressed in the License Renewal Application (LRA) Table 2.3.1-1 as component type of reactor vessel (RV)Penetrations.
Reactor Makeup Water System RAI 2.3.2.6-1 LRA Section 2.3.2.6-1 states that the reactor makeup water system provides containment isolation for penetration P-25. The staff requests that the applicant specifically identify the components (and their functions) affected by the containment isolation.
In addition, the staff requests that the applicant clarify if these components are within the scope of license renewal.RAI 2.3.2.6-1 Response The components that are affected by the containment isolation associated with penetration P-25 are the line segment and the associated drain between the isolation valves that are shown as green on the boundary drawing LR-WCGS-BL-M-12BL01.
Components affected by containment isolation have a pressure Attachment I to WM 07-0050 Page 3 of 5 WCNOC Response to NRC Requests for Additional Information (ML071220180)
Dated May 6, 2007 boundary intended function and are in the scope of license renewal based on the criteria of 10CFR54.4(a)(1).
Other portions of the reactor water makeup system are in scope of license renewal for structural integrity and spatial interaction based on criterion of 10CFR54.4(a)(2) and are shown as red in the boundary drawing LR-WCGS-BL-M-12BLO1.
High Pressure Coolant Injection System RAI 2.3.2.10-1 License renewal drawing LR-WCGS-EM-M-12EM01 shows the refueling water storage tank within the scope of license renewal. However, the piping and components EBNO1A, EBNO1B and EBNO1C, which are entirely enclosed by this tank, are not. The staff requests that the applicant justify why these components are not within the scope of license renewal in accordance with 10 CFR 54.4(a)(2).
RAI 2.3.2.10-1 Response USAR 6.3.2.2 states that the heat exchangers (steam heating coils EBN01A, EBN01B, and EBN01C) are wrapped around the exterior shell of the tank. The steam heating coils are under the insulation that is also wrapped around the outside of the tank. The steam heating coils are not enclosed internally in the tank.The non-safety related steam heating coils that are attached to the exterior shell of the tank may have spatial interactions with the safety related tank and it's associated instrumentation in an event of heating coil leak. Thus the steam heating coils will be added to the scope of license renewal based on the criterion of 10CFR54.4(a)(2).
On license renewal drawing LR-WCGS-EM-M-12BNO1 the steam heating coils EBN01A, EBN01B, and EBN01C and the associated piping will be included in scope. LRA Table 2.3.2-10 will be amended to add steam heating coils under the component type of "Heat Exchanger Tube Side" with an Intended Function of Leakage Boundary.
LRA Table 3.2.2-10 will be amended to add lines of aging evaluation for the component type of "heat exchanger tube side".Chemical and Volume Control System RAI 2.3.3.7-1 License renewal drawing LR-WCGS-BG-M-12BG03 shows the volume control tank (TBG05) within the scope of license renewal. The staff requests that the applicant explain why the piping and spray nozzles are not included within the scope of license renewal in accordance with 10 CFR 54.4(a)(2).
Attachment I to WM 07-0050 Page 4 of 5 WCNOC Response to NRC Requests for Additional Information (ML071220180)
Dated May 6, 2007 RAI 2.3.3.7-1 Response The Volume Control Tank (VCT) has an intended function of pressure boundary.The VCT spray nozzle assembly (nozzle and pipe stub) does not have an intended function (reference USAR Section 9.3.4). Failure of the nozzle assemblies does not support the structural integrity of the VCT nor does their failure affect the intended function of the VCT. The VCT spray nozzle assemblies do not have an intended function for any of the license renewal regulated events. The VCT nozzle assemblies are not within the scope of license renewal based on the criteria of I OCFR54.4(a)(1), (a)(2) or (a)(3).Failure of the spray nozzle assemblies would result in abnormal control room indications/alarms and operator action would be taken to correct the condition.
RAI 2.3.3.7-2 LRA Table 2.3.3-7 does not list component type of pumps and tanks supports.
The staff requests that the applicant clarify if the pumps and tanks supports are within the scope of license renewal. If the supports are not within the scope of license renewal the staff requests that the applicant justify its response; if they are, the applicant should indicate where these components are discussed.
RAI 2.3.3.7-2 Response Chemical and Volume Control System supports within the scope of license renewal are addressed as structural commodities in LRA Section 2.4.22. Pump and Tank supports for the Chemical and Volume Control System are shown in LRA Table 2.4-22 as "Supports, Mechanical Equipment Class 2 and 3" or"Supports, Mechanical Equipment Non-ASME" depending upon the classification of the component.
RAI 2.3.3.7-3 License renewal drawing LR-WCGS-BG-M-12BG04 shows the spent resin storage tanks outside the scope of license renewal; however, all their connecting lines were included within the scope. The staff requests that the applicant explain and justify this inconsistency.
RAI 2.3.3.7-3 Response The portion of the Chemical and Volume Control System shown on boundary drawing LR-WCGS-BG-M-12BG04 is the boron thermal regeneration system. The"spent resin storage tanks" referenced in the RAI are the thermal regeneration demineralizers FBG02A, FBG02B, FBG02C, FBG02D, and FBG02E. The piping shown is in the scope of license renewal for spatial interaction in the auxiliary Attachment I to WM 07-0050 Page 5 of 5 WCNOC Response to NRC Requests for Additional Information (ML071220180)
Dated May 6, 2007 building.
Each thermal regeneration demineralizer tank is located in a concrete compartment.
There are no safety-related components in the tank compartments.
Therefore the demineralizer tanks are not in the scope of license renewal based upon the criterion of 10 CFR 54.4(a)(2).
Attachment II to WM 07-0050 Page 1 of 1 LIST OF COMMITMENTS The following table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation in this document.
Any other statements in this letter are provided for information purposes and are not considered regulatory commitments.
Please direct questions regarding these commitments to Mr. Kevin Moles, Manager Regulatory Affairs at Wolf Creek Generating Station, (620) 364-4126.REGULATORY COMMITMENT DUE DATE License Renewal Application changes discussed in this 08/31/2007 document will be submitted in an amendment to the application.