NL-16-1049, Joseph M. Farley Nuclear Plant, Units 1 and 2 - Seventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)

From kanterella
Revision as of 03:21, 8 November 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Joseph M. Farley Nuclear Plant, Units 1 and 2 - Seventh Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)
ML16221A398
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/08/2016
From: Pierce C R
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-049, NL-16-1049
Download: ML16221A398 (7)


Text