MONTHYEARML15110A2812015-04-0606 April 2015 Letter from Timothy M. Debey Revised (Corrected) the 2014 Annual Report for the U.S. Geological Survey Triga Non-Power Reactor Facility ML14051A5292014-01-30030 January 2014 Submittal of 2013 Annual Report for the U.S. Geological Survey Triga Reactor ML12030A0942012-01-23023 January 2012 Department of the Interior, Us Geological Survey - Annual Report for 2011 ML0703302122007-01-26026 January 2007 Submittal of Correction Page for the 2006 Annual Report of the U.S. Geological Survey Triga non-power Reactor Facility ML0702903702007-01-19019 January 2007 Us Geological Survey Triga Reactor Annual Report, January 1, 2006 - December 31, 2006 ML0601804752006-01-10010 January 2006 Submittal of Annual Report for U.S. Geological Survey Triga Non-Power Reactor Facility ML0502402642005-01-12012 January 2005 Submittal of Annual Report of the Geological Survey Triga Non-Power Reactor Facility ML0403002442004-01-14014 January 2004 Annual Report of the Us Geological Survey Triga Non-Power Reactor Facility, January 1 - December 31, 2003 ML0303003522003-01-22022 January 2003 Submittal of the Annual Report of the U.S. Geological Survey Triga 2015-04-06
[Table view] Category:Letter
MONTHYEARML24092A1542024-04-0404 April 2024 U.S. Geological Survey - Change of Facility Project Manager ML24092A0422024-03-28028 March 2024 U.S. Geological Survey Triga Reactor Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 for 2023 IR 05000274/20232022023-11-13013 November 2023 U.S. Geological - U.S. Nuclear Regulatory Commission Safety Inpsection Report No. 05000274/2023202 IR 05000274/20232032023-11-0909 November 2023 United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000274/2023203 (Public) IR 05000274/20232012023-02-27027 February 2023 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000274/2023201 ML22026A4852022-03-0707 March 2022 Examination Confirmation Letter No. 50-274/OL-22-01, United States Department of Interior Geological Survey ML22053A1872022-02-22022 February 2022 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Reactor Administrator Succession IR 05000274/20212022021-10-0101 October 2021 U.S. Geological U.S. Nuclear Regulatory Commission Safety Inspection Report No. 05000274/2021202 IR 05000274/20212032021-09-30030 September 2021 United States Geological Survey - Nuclear Regulatory Commission Security Inspection Report No. 05000274/2021203 IR 05000274/20202012021-04-21021 April 2021 United States Geological Survey, U.S. Nuclear Regulatory Commission Routine Inspection Report05000274/2020201 - Cover Letter and Enclosure ML21090A1912021-03-29029 March 2021 U.S. Geological Survey Triga Reactor, Annual Report Submittal in Accordance with Technical Specification 6.7.1 Rev. 00 ML21082A2822021-03-23023 March 2021 Letter to R. Horton, USGS Denver Federal Center, from B. Smith, NRC, NRC Office of Investigations Report No. 4-2019-014 - Release of OI Synopsis IR 05000274/20212012021-03-12012 March 2021 U.S. Geological Survey NRC Non-Routine Inspection Report 05000274/2021201 ML20314A2922020-12-0303 December 2020 USGS Issuance of Amendment No. 14 to Renewed Facility Operating License No. R-113 for the USGS Triga Research Reactor Increasing the Special Nuclear Material Possession Limit ML20336A0202020-12-0101 December 2020 U.S. Geological Survey Triga Reactor - License Amendment Request LAR 14, Supplemental Information Letter 04 Provided in Response to Phone Call with NRC Project Manager at 0854 Mst on 2020-11-30 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20310A2962020-11-0505 November 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request LAR 14, Supplemental Information Letter 03 Provided in Resolution of Comments Presented by the State of Colorado During the Public M ML20310A3352020-11-0505 November 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Updated Physical Security Plan, Rev. Xxi ML20318A0882020-10-22022 October 2020 U.S. Geological Survey Trig a Reactor, License Amendment Request LAR 14, Supplemental Information Letter 01 Provided in Response to Audit Visit on 2020-10-15 Purpose ML20296A4902020-10-22022 October 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request LAR 14, Supplemental Information Letter 02 Provided in Response to Audit Visit on 2020-10-15 ML20295A5102020-10-21021 October 2020 U.S. Geological Survey - Regulatory Audit Report Proposed License Amended No. 14 to Increase the Special Nuclear Material Possession Limit ML20233A9962020-10-0909 October 2020 Us Geological Survey - Issuance of Amendment No. 13 to Renewed Facility Operating License No. R-113 to Amend Technical Specifications 3.1.3 and 4.1 for the Us Geological Survey Triga Research Reactor ML20279A5912020-10-0606 October 2020 U.S. Geological Survey - Regulatory Audit Proposed License Amendment No. 14 Tt Increase the Special Nuclear Material Possession Limit ML20279A3052020-10-0505 October 2020 U.S. Geological Survey - Acceptance of the Application for Proposed License Amendment No. 14 Increase in the Special Nuclear Nuclear Material Possession Limit ML20275A2672020-10-0101 October 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-02, LAR 14, Rev. 00 ML20199M1672020-07-20020 July 2020 NRC Letter and SER Authorizing USGS to Use an Alternate A2 Value ML20183A1622020-07-0202 July 2020 U.S. Geological Survey - Acceptance of the Application for a License Amendment Exception to TS 3.1.3 and 4.1 to Allow Fewer than 110 Fuel Elements When Either Shutdown or Operating at a Power Level Not Greater than 5 Kilowatts ML20177A6102020-06-25025 June 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Supplemental Information Provided in Response to ML20176A465 ML20161A1272020-06-0404 June 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01, Revision 01 ML20134J1082020-05-13013 May 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, License Amendment Request 2020-01 ML20157A0752020-05-0707 May 2020 U.S. Geological Survey Triga Reactor, Docket Number 50-274, License Number R-113, Reactor Supervisor Appointment ML20136A3362020-04-21021 April 2020 Us Dept. of Interior, Geological Survey (Usgs), Submittal of Corrected 2019 Annual Report ML20134J1162020-04-10010 April 2020 7 of the Emergency Plan for the U.S. Geological Survey Triga Reactor (Gstr) Facility (License R-113, Docket 50-274) ML20087H0192020-03-0202 March 2020 Us Dept of Interior, Geological Survey (USGS) - Submittal of 2019 Annual Report ML19206A0622019-07-11011 July 2019 Us Dept of the Interior, Us Geological Survey Follow-Up on August 9, 2018 Letter Request for Approval for Use of Alternative A2 Value for Isotope Br-80m Under Appendix a to 10 CFR 71 ML19066A0542019-02-25025 February 2019 U.S. Dept of the Interior, Geological Survey, Reply to a Notice of Violation: EA-18-031 and EA-18-111 ML19044A3732019-01-31031 January 2019 Us Dept. of Interior, Geological Survey - Submittal of 2018 Annual Report ML18354B1702018-12-31031 December 2018 U.S Geological Survey-Notice of Violation and Proposed Imposition of Civil Penalty ML18324A5752018-11-16016 November 2018 United States Geological Survey (Usgs), Transfer of Reactor Supervisor Responsibilities. Position of Reactor Supervisor for Triga Facility Has Been Transferred from Mr. Brycen Roy to Mr. Christopher Farwell, Effective October 26, on Interim ML18324A5742018-11-16016 November 2018 United States Department of the Interior - Transfer of Reactor Administrative Responsibilities ML18325A1462018-11-0707 November 2018 U.S. Dept. of Interior, Geological Survey - Response to Apparent Violations Associated with NRC Investigation Reports 4-2017-027 and 4-2018-005; IA-18-038 IR 05000274/20182022018-08-15015 August 2018 United States Geological Survey - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-274/2018-202 ML18236A5512018-08-0909 August 2018 Request for Approval for Use of Alternative A2 Value for Isotope Br-80m Under Appendix a to 10 CFR 71 IR 05000274/20182032018-07-17017 July 2018 United States Geological Survey - U.S. Nuclear Regulatory Commission Security Inspection Report 05000274/2018203 ML18016A0512018-01-11011 January 2018 2017 Annual Report for the U.S. Geological Survey Triga Non-Power Reactor Facility ML17355A1472017-12-18018 December 2017 Establishing a Quality Assurance Program at the U.S. Geological Survey Triga Reactor Facility (License R-113, Docket 50-274) IR 05000274/20172012017-05-17017 May 2017 United States Geological Survey NRC Routine Inspection Report No. 50-274/2017-201 ML17074A6472017-04-19019 April 2017 United States Geological Survey TRIGA Reactor Closure of Confirmatory Action Letter No. NRR-03-005 on Site-Specific Compensatory Measures Implementation Plan ML17067A3942017-03-22022 March 2017 U.S. Geological Survey - Non-Power Reactor Closeout of Generic Letter 2016-01, "Monitoring of Neutron Absorbing Materials in Spent Fuel Pools," for the U.S. Geological Survey Training Reactor And Isotopes Production, General Atomics Research Reactor ML17046A3632017-02-17017 February 2017 Examination Report No. 50-274/OL-17-01, United States Geological Survey 2024-04-04
[Table view] |
Text
United States Department of the Interior GEOLOGICAL SURVEY BOX 25046 M.S. tug DENVER FEDERAL CENTER DENVER, COLORADO 80225 IN RF P'LY RF1FR 1(1 January 10, 2006 U.S. Nuclear Regulatory Commission Document Control Desk Washington DC 20555
Dear NRC staff:
The attached annual report of the U.S. Geological Survey TRIGA non-power reactor facility is submitted in accordance with license conditions.
The facility docket number is 50-274.Sincerely, Timothy M. DeBey Reactor Supervisor Enclosure Copy to: Al Adams, MS 0-11 -D-1 9 PP-1 U.S. GEOLOGICAL SURVEY TRIGA REACTOR ANNUAL REPORT JANUARY 1, 2005 -DECEMBER 31, 2005 NRC LICENSE NO. R-1 13 -DOCKET NO. 50-274 1. Personnel Changes: One personnel change occurred in CY 2005 with the hiring of Paul Lietz as a reactor operator trainee.11. Operating Experience The Geological Survey TRIGA Reactor (GSTR) was in normal operation for the year 2005. No major facility changes were made during the year.A synopsis of irradiations performed during the year is given below, listed by the organization submitting the samples to the reactor staff: Organization Geologic Discipline
-INAA Geologic Discipline
-Geochronology Non-USGS affiliated Total Number of Samples 960 565 764 2716 A Thermal power calibrations were performed in May and November, with minor adjustments made to the instrumentation.
B. During the report period, 160 daily checklists and 12 monthly checklists were completed in compliance with technical specifications requirements for surveillance of the reactor facility.C. Tours were provided to individuals and groups during the year for a total visitor count of approximately 545.1 IlI. Tabulation of Energy Generated Jan Feb Mar Apr May June AJu Sept§M-Oct Nov Dec MWH operated 15.016 25.818 27.850 61.050 34.687 38.450 57.797 38.980 42.792 92.673 15.380 20.638 Critical hours 16h 57m 26h 12m 28h 46m 62h 44m 35h 58m 39h 36m 64h 48m 40h 04m 43h 56m 98h 03m 16h 02m 22h 05m Pulses 0 0 0 0 0 0 0 0 0 0 0 0 Totals 471.131 495h 11m 0 IV. Unscheduled Shutdowns Number Date Cause 1005 1006 1007 1008 2/28/05 7/27105 7/28/05 12/15/05 DAC DIS064 timeout DAC DIS064 timeout Loss of building AC power Building evacuation alarm V. Sianificant Maintenance Operations
- 1. The ion exchange resin was replaced in January.2. The main exhaust fan and motor were replaced in October.3. The secondary sump covers were replaced in December.4. A W/4" secondary pipe drain was plugged in December.
This pipe was unplugged and a section of it was replaced along with a new gate valve.VI. Summary of 10 CFR 50.59 changes No 50.59 changes were made during this year.2 Vii. Radioactivity Releases A. Listed below are the total amounts of radioactive gaseous effluent released to the environment beyond the effective control of the reactor facility.Table 1. Gaseous Effluents Released to the Environment Month Argon-41 Ar-41 License Tritium (HTO) IOCFR20 Allowable Allowable H-3_ (curies) (Ci) (R-113) (mCi) * (mci)January 0.054 5.8 0.063 124 February 0.071 5.8 0.076 124 March 0.643 5.8 0.164 124 April 0.361 5.8 0.067 124 May 0.127 5.8 0.067 124 June 0.122 5.8 0.056 124 July 0.167 5.8 0.164 124 August 0.095 5.8 0.067 124 September 0.058 5.8 0.067 124 October 0.417 5.8 0.055 124 November 0.398 5.8 0.067 124 December 0.048 5.8 0.055 124 Total 2.993 69.6 0.968 1488% of Allowable 4.3% -__ 0.065% __* Note: The tritium concentrations are estimates based on the amount of water lost by evaporation from the reactor multiplied by the concentration of tritium as HTO. Tritium sample analyses were performed by Severn Trent Laboratories.
B. One 55-gallon drum of low-level radioactive solid waste was shipped for burial in Washington State during the year. Note: The principal radioactive waste generated at the reactor facility is the demineralizer resin. Used resin with small quantities of rinse water was de-watered by evaporation and placed in a 55-gallon drum.VNil. Radiation Monitoring Our program to monitor and control radiation exposures included the four major elements below during the operating year.1. Thirteen gamma-sensitive area monitors are located throughout the Nuclear Science Building.
A remote readout panel is located in the reactor health physics office. High alarm set points range from 2 mR/hr to 50 mR/hr. High level alarms are very infrequent and due to sample movements.
3 d.2. One Continuous Air Monitor (CAM) samples the air in the reactor bay. An equilibrium concentration of about 1 x 1 0 pCi/ml present for two minutes will result in an increase of 400 cpm above background.
There are two alarm setpoints.
A low-level alarm is set at 3000 cpm and the high level alarm is set at 10000 cpm.Reactor bay air is sampled during all reactor operations.
The fixed particulate air filter is changed each week and counted on a HPGE gamma spectrometer counting system. The charcoal filter, fitted behind the air filter, is also changed and counted weekly. In all instances, sample data were less than airborne concentration value (10 CFR Part 20, Appendix B, Table 2) for all particulate radioisotopes produced by the reactor.3. Contamination wipe surveys and radiation surveys with portable survey instruments are performed at least once a month. All portable instruments are calibrated with a 3-Curie (initial activity)
Cs-137 source traceable to NBS, and wipes are counted on a Gamma Products G5000 low level counting system. Two areas were identified greater than 30 pCi/1 00 cm 2 beta contamination.
One was near the decon sink in room 151 @ 53 pCi/1 00 cm 2; the other @ 48 pCi/1 00 cm 2 was near the east exit door of Building 10. All other areas were less than 30 pCi/100 cm2 beta and 15 pCi1 00 cm 2 alpha.The roof area over the reactor tank is roped off and posted as a radiation area (averaging 2.5 mR/hr) during 1 MW operations.
- 4. TLD dosimeters were used at four outdoor environmental stations.
Reactor facility visitors are issued self-reading dosimeters.
Reactor staff personnel are issued beta/gammalneutron badges.Table 2. Personnel Monitoring Results (1211104-11130105)
Deep Dose Shallow Dose Equivalent Equivalent Name Whole Body (Rem) Whole Body (Rem) Extremity (Rem)DeBey, T 0.180 0.362 1.883 Lightner,G 0.236 0.348 0.503 Liles, D 0.131 0.259 0.608 Perryman, R 0.110 0.798 0.539 Note: December's personnel dosimetry results are not available at this time.Reactor visitors and occasional experimenters wore pocket dosimeters that resulted in no individual reading that was greater than one (1) mrem.4 Table 3. Environmental Dose Results Location Dose Dose Dose Dose Total Jan-Mar Apr-June July-Sept.
Oct.- Dec.(RAD) (RAD) (RAD) (RAD) (RAD)Exhaust 0.0015 0.00 0.017 0.031 0.0495 Stack Cooling 0.00 0.00 0.002 0.011 0.013 Tower Fence West Vehicle 0.00 0.00 0.009 0.014 0.023 Gate West Room 0.00 0.00 0.014 0.014 0.028 151 Gate Southwest 0.00 0.00 0.004 0.004 0.008 Light Pole Control 0.0268 0.0203 0.029 0.037 0.1131 (backgrounds Southeast 0.00 0.00 0.00 0.001 0.001 L ight P o le__ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _Note: Above totals (except control) have the background subtracted (see control).The environmental TLDs were supplied and evaluated by Global Dosimetry.
X. Environmental Monitoring There have been no uncontrolled radioactivity releases from the reactor to the present date. Thus, the data on file from past years to the present are considered to be background information.
Soil and water samples are taken every two years and were not taken in 2005.5