Final - Section a Operating Exam (Folder 3)
ML060310559
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/11/2005
From:
Susquehanna
To: Fish T H
Operations Branch I
Conte R J
References
Download: ML060310559 (99)


Text

PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 00.AD.269.101 0 0912 6/05 2.2.24 N/A 2.613. a ADDI. JPM Number Rev. No. Date NUREG 1123 KIA No. WA Imp. *. To Sys. No. Task Title:

Determine Trip Inputs to Zone 3 Is0 Signals Lockout Relay XY07553A Using Controlled Electrical Prints Completed By: Rich Chin Writer Approval : Nuclear Trng.

Supv. Date of Performance: JPM Performed By: Validated 09/26/05 Date InstructorNVriter Date Date 20130 Validation Time (Min.) Time Taken (Min.) Student Name: Last First M.I. Employee #I S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Eva1 uation: Evaluator Name: Signature Typed or Printed Comments:

Form NTP-QA-3 1 .S- 1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE WRO 00.AD.269.101

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. E 201 sheet 1 (Rev. 27) 6. E 184 sheet 1 (Rev. 19)

C. E 184 sheet 3 (Rev.

17) I II. REACTIVITY MAN1 PU LATIONS This JPM satisfies the requirements of Operational Activity(s):

None IV. TASK CONDITIONS A. Electrical maintenance is preparing to replace the Zone 3 Is0 Signals Lockout Relay XY07553A on panel OC681. V. INITIATING CUE Your supervisor asks you to use the controlled electrical prints to identify all of the trip input signals to this relay, and report your results to back to your supervisor.

VI. TASK STANDARD All of the trip input signals to Zone 3 Is0 Signals Lockout Relay XY07553A are identified.

SROs must additionally identify the required Tech Spec actions for an inoperable input.

Form NTP-QA-3 1.8- 1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.AD.269.101 - Step 1. 2. PERFORMANCE CHECKLIST Page 3 of 7 Student Name: Action EVALUATOR NOTE Candidate may use any number of different mediums to obtain the controlled copy of the electrical drawings.

These would all be acceptable.

Candidate obtains the controlled copy of the electrical print. Locates relay XY07553A on print E 201 sheet

1. EVALUATOR NOTE The following steps 3 - 9 may be done in any order. Candidate may also elect not to report result back to supervisor until they have completed the task. This JPM is written with a report back after each determination as a convenience to the evaluator.

Standard References the electrical print index, OR the operating manuals and determine the appropriate print is E 201 sheet 1. Locates relay XY07553A at grid location C6. Eva1 - Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given I PERFORMANCE CHECKLIST Page 4 of 7 Appl. To/JPM No.: S/RO 00.AD.269.101 Step +3 u4 Action Candidate determines Unit 1 High radiation inputs a trip signal to relay XY07553A. Candidate determines Unit 2 High radiation inputs a trip signal to relay XY07553A.

Student Name: Standard Determines that High radiation from the following Unit 1 locations will input a trip signal into relay XY07553A [Grid location B7] 0 Refuel floor exhaust 0 Refuel floor wall exhaust 0 Railroad access shaft exhaust AND Reports this to the supervisor Determines that High radiation from the following Unit 2 locations will input a trip signal into relay XY07553A [Grid location 881 0 Refuel floor exhaust 0 Refuel floor wall exhaust AND Reports this to the supervisor Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: SIR0 00.AD.269.101 Step 5 6 *7 8 PERFORMANCE CHECKLIST Action Determines the need to transition to another electrical drawing. Candidate obtains the controlled copy of the electrical print E 184 sheet 1. Candidate determines Unit 1 Div 1 LOCA isolation signal inputs a trip signal to relay XY07553A.

Candidate obtains the controlled copy of the electrical print E 184 sheet

3. Student Name: ~ Standard Determines the other 2 inputs to trip relay XY07553A are on drawings 184 sheet 1 and 3 by observing the notes Obtains the controlled copy of the electrical print E 184 sheet 1. Determines Unit 1 Div 1 LOCA isolation signal inputs a trip signal to relay XY07553A and this signal is generated by
Manual isolation Lo-Lo water reactor level (trip2) Hi drywell pressure Switch in "TEST" mode AND Reports this to the supervisor Obtains the controlled copy of the electrical print E 184 sheet
3. I Page 5 of 7 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.AD.269.101 PERFORMANCE CHECKLIST Page 6 of 7 Action Candidate determines Unit 2 Div 1 LOCA isolation signal inputs a trip signal to relay XY07553A.

Candidate determines there are no more inputs to relay XY07553A EVALUATOR CUE: This completes the JPM for the ROs ONLY. w Student Name: Standard Determines Unit 2 Div 1 LOCA isolation signal inputs a trip signal to relay XY07553A and this signal is generated by : Manual isolation 0 0 Hi drywell pressure 0 Switch in 'TEST" mode RPV low level (trip 2) AND Reports this to the supervisor Determines there are no more inputs to relay XY07553A, and reports this to the supervisor. - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 00.AD.269.101 PERFORMANCE CHECKLIST Page 7 of 7 Action EVALUATOR CUE:

FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec LCO for the INOPERABLE relay. Obtains a copy of the Tech Specs Determines required actions for Tech Spec 3.3.6.2 EVALUATOR CUE: This completes the JPM Student Name: Standard References Tech Spec 3.3.6.2 - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-3 1.8-2, Rev. 0, Page 1 of I 2005 NRC Exam As Given SRO ONLY TASK CONDITIONS Unit 1 is in Mode 1 Unit 2 is in Mode 4 with: NO Core alterations taking place and NO Irradiated fuel movements taking place and NO activities with the potential for draining the reactor vessel taking place. A. Electrical maintenance has determined the Unit 1 Refuel Floor High Exhaust Duct Radiation Monitor is INOPERABLE. INITIATING CUE What Technical Specifications action(s), including time limits, idare required as a result of this determination?

2005 NRC Exam As Given Page 1 of 4 SRO ONLY TASK CONDITIONS Unit 1 is in Mode 1 Unit 2 is in Mode 4 with: NO Core alterations taking place and NO Irradiated fuel movements taking place and NO activities with the potential for draining the reactor vessel taking place. A. Electrical maintenance has determined the Unit 1 Refuel Floor High Exhaust Duct Radiation Monitor is INOPERABLE.

INITIATING CUE What Technical Specifications action(s), including time limits, idare required as a result of this determination?

2005 NRC Exam As Given Page 2 of 4 TASK CONDITIONS A. Electrical maintenance is preparing to replace the Zone 3 Is0 Signals Lockout Relay XY07553A on panel OC681. INITIATING CUE Your supervisor asks you to use the controlled electrical prints to identify all of the trip input signals to this relay, and report your results to back to your supervisor.

2005 NRC Exam As Given Page 3 of 4 TASK CONDITIONS A. Electrical maintenance is preparing to replace the Zone 3 Is0 Signals Lockout Relay XY07553A on panel OC681. INITIATING CUE Your supervisor asks you to use the controlled electrical prints to identify all of the trip input signals to this relay, and report your results to back to your supervisor.

2005 NRC Exam As Given Page 4 of 4 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.AD.273.002 0 09/26/05 2.1.12 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title:

Completed By: Validated Determine TRO applicability and complete the LCOITRO log sheet. Rich Chin 09/26/05 Writer Date InstructorMlriter Date Ap p rova I : Nuclear Trng.

Supv. Date of Performance:

Date 15 Validated Time (Min.) Time Taken (Min.) JPM Performed By: Student Name: Last First M.I. Employee # / S.S. # Performance Evaluation: ) Satisfactory ( ) Unsatisfactory Evaluator Name: Signature Typed or Printed Comments:

Form NTP-QA-31.8-1.

Rev. 0. Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.AD.273.002

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgement of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES NDAP-QA-0312, "CONTROLS OF LCO'S, TRO'S AND SAFETY FUNCTION DETERMINATION PROGRAM" (Revision

8) Tech Specs I II. R EACTlVlTY MAN I PU LATl ONS This JPM satisfies the requirements of Operational Activity(s):

NONE IV. TASK CONDITIONS A. Unit 1 is in Mode 1 at 100% power. 6. "B" RPS Bus De-energized 30 minutes ago due to a voltage regulator failure in the MG set. C. "B RPS has been transferred to the alternate power supply IAW ON-158-001, LOSS OF RPS attachment

6. D. At step 9 of ON-158-001, LOSS OF RPS attachment 6, a problem was encountered. NONE of the CRM AIR SAMPLE IS0 LOOP valves (HS-15711 OAl , A2, B1, 62) could be OPENED. All other steps of the attachment were completed successfully.

E. Electrical maintenance was dispatched to determine the problem with the CRM AIR SAMPLE IS0 LOOP valves. Electrical maintenance has determined the cause to be a failure of the MDR relay. F. AR-146-AO2 CONTN RAD DET SYSTEM A TROUBLE alarm is locked in. G. AR-146-AO5 CONTN RAD DET SYSTEM B TROUBLE alarm is locked in. H. No Tech Spec actions, TRO actions or Loss of safety function worksheets are in effect at either Unit.

V. INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech Spec/TRM actions, and complete the necessary tracking forms. VI. TASK STANDARD Entry into LCO 3.4.6 declared with LCO/TRO log and Operations portion of Chemistry/Health Physics LCO/TRO Sample /Survey Log sheet filled-out, and Chemistry notified.

Form NTP-QA-31.8-1.

Rev. 0. Page 2 of 2 2005 NRC Exam As Given Appl. To/JPM No.: 00.AD.273.002 I PERFORMANCE CHECKLIST Page 3 of 9 Student Name: Action EVALUATOR NOTE: Due to the nature of this JPM, the candidate may refer to several procedures before determining CRM A 8, B are both INOPERABLE and LCO 3.4.6 entry is required. Allow candidate to use the forms from the copy of NDAP-QA-0312 that is provided with this JPM. Obtain a controlled copy of NDAP-QA-0312, "CONTROLS OF LCO'S, TROIS AND SAFETY FUNCTION DETERMINATION PROGRAM Selects the correct section to perform. Review applicable TS LCO and Bases or TRM TRO and Bases. EVALUATOR NOTE: Placing Unit 1 in either of the appropriate blocks in the next 2 steps will satisfy the "Critical portion for BOTH steps. *Critical Step #Critical Sequence Standard Controlled copy obtained. Selects section

6.3 Reviews

TS LCO and Bases and TRM TRO and Bases. Determines LCO 3.4.6 is applicable.

Comments Form NTP-QA-31 8-2. Rev. 0. Page 1 of 1 2005 NRC Exam As Given I PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: 00.AD.273.002 - Step *4 *5 6 *7 ma 9 Action In accordance with the applicable TSRRM, complete a LCORRO log sheet (Form NDAP-QA-0312-1) as follows: Enter the applicable unit for which the log sheet is being completed.

Enter the unit containing the inoperable equipment.

Enter the system number.

Circle or enter whether the Action is an LCO or TRO and enter the specification number. Enter the applicable MODES. EVALUATOR NOTE: Candidate may choose to place references in the reference document section, however this is not required.

Enter the reference documents, if applicable.

The Reference Documents section may also be used to provide clarifying information for the reason the LCORRO is being entered. Student Name: Standard Fills out a copy of Attachment C of NDAP-QA-0312 (Form Records a 1 in the space provided to designate Unit 1 NDAP-QA-0312-1)

Records a 1 in the space provided to designate Unit 1 Records a 79 in the space provided.

Circles or records LCO Then records 3.4.6. Records 1,2,3. Determines NO reference documents are applicable.

Comments *Critical Step #Critical Sequence Form NTP-QA-31 .E-2, Rev. 0. Paw 1 d 1 2005 NRC Exam As Given Appl. To/JPM No.: 00.AD.273.002 Step *lo *11 I PERFORMANCE CHECKLIST Page 5 of 9 Action Reviewhevise all active LOSF worksheets based on the above inoperable equipment.

Determine if LCO 3.0.6 has been applied for any other system on both Units 1 and 2. EVALUATOR NOTE:

The next 4 steps of this JPM will require 2 separate line item entries on Attachment C of NDAP-QA-0312.

One for action 6.1 , and one for 6.2. See attached answer key for specifics of this form should be completed.

  • Critical Step #Critical Sequence Student Name: Standard Determines from initial conditions that No Tech Spec actions , TRO actions or Loss of safety function worksheets are in affect at either Unit and Records N/A in the space provided Determines from initial conditions that No Tech Spec actions , TRO actions or Loss of safety function worksheets are in affect at either Unit and Records an X in the "Is this a Safety Function Determination support system?" NO space provided AND Records an X in the "If YES, is TS 3.0.6 to be applied?"

NA space provided.

Comments

  • Form NTP-QA-31.8-2, Rev. 0. Page 1 d 1 2005 NRC Exam As Given I PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: 00.AD.273.002 Student Name: - Step 12 *13 *14 *15 Action Enter the Date and Time that the CONDITION was entered. Enter the reason for CONDITION and the appropriate REQUIRED ACTION.

The REQUIRED ACTION should be listed by number and include a brief noun description.

Enter the Date and Time by when the REQUIRED ACTION must be completed. Initial that the CONDITION has been entered. Standard Records B in CONDITION block for both line items Records date and time for each of the actions in the space provided.

Records all of the following Required Primary Containment Atmospheric Monitoring System INOPERABLE B.1 Analyze grab samples of primary containment atmosphere AND 8.2 Restore required Primary Containment Atmospheric Monitoring System to OPERABLE status In the spaces provided Records: Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B.l Within 30 days for item 8.2 Records candidate initials in the spaces provided Comments *Critical Step #Critical Sequence Form NTP-QA-31.&2.

Rev. 0, Paw 1 d 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 7 of 9 Appl. To/JPM No.: 00.AD.273.002 Step 16 17 Action Have another SRO Peer Check the LCOTTRO entry and also initial in the "Entered By" box. EVALUATOR CUE: Role-play the second SRO and inform the candidate that you have Peer Checked the LCO/TRO entry, and they can assume that you have initialed the "Entered By" box. If required, additional CONDITION(S) can be entered within the same LCOTTRO as follows: If the REQUIRED ACTION requires a repetitive action (ex; perform action once every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />); COMPLETE Form NDAP-QA-0312-5 "LCOTTRO Repetitive Required Action Completion Sheet" and attach to the LCOTTRO log sheet EVALUATOR NOTE: It is not necessary to initiate a Chemistry/Health Physics LCOTTRO Sample/Survey Log if the LCO is expected to be cleared prior to the first required action/sample.

However, caution must be used to ensure the sample/survey is not missed in the event the LCO is not cleared in a timely manner. Student Name: Standard Asks another SRO to Peer Check the LCOTTRO entry and initial in the "Entered By" box. Determines:

Form NDAP-QA-0312-5 "LCOTTRO Repetitive Required Action Completion Sheet" IS NOT REQUIRED. (actions will be performed by chemistry)

Comments *Critical Step #Critical Sequence Fon NTP-QA-31 .E-2. Rev. 0. Paw 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: 00.AD.273.002 Action - - If the LCO/TRO Condition requires Chemistry or Health Physics to sample or perform a survey, Shift Supervision shall initiate a Chemistry/Health Physics LCO/TRO Sample/Suwey Log (FORM NDAP-QA-0312-3) by: Completing the top section of FORM NDAP-QA-0312-3.

Notifying Chemistry/Health Physics to pick up the log sheet in the Control Room. EVALUATOR CUE:

Role-play Chemistry and acknowledge the report. *Critical Step #Critical Sequence Student Name: Standard - L Determines:

Chemistry/Health Physics LCO/TRO Sample/Survey Log (FORM IS REQUIRED NDAP-QA-0312-3)

Places the following information on top section of FORM NDAP-QA-0312-3.

UNIT 1 The LCO/TRO for operation of the BOTH Primary Containment Atmospheric Monitoring System INOPERABLE Commenced at LCO entry time TS LCO 3.4.6 Action B.l Sample/Survey within Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Contacts Chemistry to pick up the log sheet in the Control Room. Comments Form NTP-QA-31.&2.

Rev. 0. Page 1 of 1 2005 NRC Exam k Given Appl. To/JPM No.: 00.AD.273.002 PERFORMANCE CHECKLIST Student Name: Page 9 of 9 That completes this JPM *Critical Step #Critical Sequence Form NTP-QA-31.8-2.

Rev. 0. Page 1 of 1 2005 NRC Exam As Given ANSWER KEY DO NOT GIVE TO CANDIDATES UNIT SYSTEM 1 79 MODE 1,293 Reviewhevise all active LOSF worksheets based on the above inoperable equipment.

Is this a Safety Function Determination support system? If YES, is TS 3.0.6 to be applied? YES 0 NO 0 NA If YES, perform a LOSF Determination using the Safety Function Determination Work Sheet. If NO, cascade LCO's. Review Complete N/A YES 0 NO Reference Documents z 0 k n z 8 Chem/HP B Date/ Time Entered Today's date and time Today's date and time B REASON AND REQUIRED ACTION Required Primary Containment Atmospheric Monitoring System INOPERABLE B.l Analyze grab samples of primary containment atmosphere AND 8.2 Restore required Primary Containment Atmospheric Monitoring System to OPERABLE status LCOiTRO CONDITION Entered Completion Daterrime Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Within 30 days LCO Entered Entered By candidate initials candidate initials LCOiTRO CONDITIO DateiTime .CO Cleared Cleared Cleared Bv 2005 NRC Exam As Given ANSWER KEY DO NOT GIVE TO TSKR LCO 3.4.6 CANDIDATES SAM PLE/SU RVEY ANALYSIS ACTION WITHIN COMPLETED WITH IN B.l Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Unit 1 CHEMISTRY/HEALTH PHYSICS LCO/TRO SAMPLEEURVEY LOG ThWRO for operation of the BOTH Primary Containment Atmospheric Monitoring System INOPERABLE Report chemistry analysis results to Shift Supervision.

HEALTH PHYSICS The Desk Foreman - Health Physics or the HP Shift Lead Technicians shall notify the HP Duty Foreman immediately following receipt of this log. CHEMISTRY FIRST SAMPLE DUE DATEKIME FIRST ANALYSIS COMPLETION DUE DATEKIME Shift Supervision

--OR-- LCO/TRO cleared at Bv -a Daterrime Shift Supervision Copy sent to Chemistry/HP Foreman. Technician COMPLETED FORMS SHALL BE INCLUDED WITH THE LCOKRO LOG SHEET FOR THE SAMPLING LCOTTRO. Page 1 of 2005 NRC Exam As Given TASK CONDITIONS A. B. C. D. E. F. G. H. Unit 1 is in Mode 1 at 100%

power. "B RPS Bus De-energized 30 minutes ago due to a voltage regulator failure in the MG set. "B RPS has been transferred to the alternate power supply IAW ON-158-001, LOSS OF RPS attachment B. At step 9 of ON-158-001, LOSS OF RPS attachment B, a problem was encountered.

NONE of the CRM AIR SAMPLE IS0 LOOP valves (HS-15711 OAl , A2, B1, 82) could be OPENED. All other steps of the attachment were completed successfully. Electrical maintenance was dispatched to determine the problem with the CRM AIR SAMPLE IS0 LOOP valves. Electrical maintenance has determined the cause to be a failure of the MDR relay. AR-146-AO2 CONTN RAD DET SYSTEM A TROUBLE alarm is locked in. AR-146-AO5 CONTN RAD DET SYSTEM B TROUBLE alarm is locked in. No Tech Spec actions, TRO actions or Loss of safety function worksheets are in effect at either Unit. INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech SpecmRM actions, and complete the necessary tracking forms. 2005 NRC Exam As Given 1 of2 TASK CONDITIONS - A. B. C. D. E. F. G. H. Unit 1 is in Mode 1 at 100% power. "B RPS Bus De-energized 30 minutes ago due to a voltage regulator failure in the MG set. "6 RPS has been transferred to the alternate power supply IAW ON-158-001, LOSS OF RPS attachment B. At step 9 of ON-158-001, LOSS OF RPS attachment B, a problem was encountered.

NONE of the CRM AIR SAMPLE IS0 LOOP valves (HS-157110A1 , A2, B1, 82) could be OPENED. All other steps of the attachment were completed successfully. Electrical maintenance was dispatched to determine the problem with the CRM AIR SAMPLE IS0 LOOP valves. Electrical maintenance has determined the cause to be a failure of the MDR relay. AR-146-AO2 CONTN RAD DET SYSTEM A TROUBLE alarm is locked in. AR-146-AO5 CONTN RAD DET SYSTEM B TROUBLE alarm is locked in. No Tech Spec actions, TRO actions or Loss of safety function worksheets are in effect at either Unit. INITIATING CUE Based on these plant conditions, IAW with the appropriate procedure, determine the required Tech SpeciTRM actions, and complete the necessary tracking forms. 2005 NRC Exam As Given 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET RO 00. E P.004.002 0 9/27/05 2.4.43 N/A 2.8 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title: Completed By: Validated:

Control Room Communicator Emergency Notification Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval:

NuclearTrng.

Supv. Date of Performance: JPM Performed By: Date Time Critical 15 Minutes Validated Time (Min.) Time Taken (Min.) Student Name: Last First M.I. Employee #/ S.S. # Performance Evaluation: ) Satisfactory ( ) Unsatisfactory Evaluator Name: Signature Typed or Printed Comments:

Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE RO 00.EP.004.002

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.

2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. EP-PS-100 EMERGENCY DIRECTOR, CONTROL ROOM: Emergency-Plan-Position Specific Instruction (Rev. 22) B. EP-PS-126, EMERGENCY PLAN COMMUNICATOR: Emergency Plan-Position Specific Instruction (Rev. 23) C. EP-TP-003, COMMUNICATION PROCESS (Rev.

0) I II. R EACTl VlTY MANIPULATIONS This JPM satisfies the following Operational Activity(s):

None IV. TASK CONDITIONS An Alert has been declared due to sustained high winds greater than 80 mph resulting in visible damage to the ESSW pump house. (OA3)

V. INITIATING CUE You have been assigned as the Control Room Communicator. Transmit initial information about the Emergency Condition to required organizations, IAW the appropriate procedure.

VI. TASK STANDARD Identify the ENR form is incomplete; Contact the offsite agencies within 15 minutes from initiation of the ENR form; Communicate the Emergency Classification, Unit, declaration Time and Date to the off site agencies.

Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: RO 00.EP.004.002 Step Action EVALUATOR NOTE: This is a time critical JPM. Ensure a copy of EP-PS-100, EP-TP-003, and EP-PS-126 are available to support performance of this JPM. Have current, filled-out copy of ENR Form available, with Line 4 BLANK If performing in the simulator, place a yellow sticky on each of the 2 communicator phones with the following call-back number: 570-759-4902 EVALUATOR NOTE:

To begin this JPM, provide the candidate with the Tasl Conditions and Initiating Cue Sheet.

Role play as Control Room ED and give student filled-out ENR Form. Student Name: Standard Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: RO 00.EP.004.002 PERFORMANCE CHECKLIST Page 4 of 9 Action Obtain and review Event Notification Report (ENR) form with the Shift Manager/ED. EVALUATOR CUE: Role play as Control Room ED and Place OA3 on line 4 of the ENR Form. Return completed ENR form to the candidate. EVALUATOR CUE:

After the ENR has been corrected and returned to the candidate, the Time Critical Portion of the JPM begins. Record Start Time Student Name: Standard Reviews ENR form to verify Lines 1, 3, 4, 5, 6, and 7 are all filled out. Determines:

Line 4 is NOT filled out Reports to the ED that line 4 MUST be filled out Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: RO 00.EP.004.002

.. - Step *2 Action NOTE: If the MOC does not answer, do not wait.

Transmit the ENR form information to the emergency agencies.

NOTE: Do not communicate the control number to offsite agencies.

This block is gray shaded on the ENR form. Within 15 minutes of declaration, using the purple colored phone button, dial "1 91" to transmit the ENR form to the following: (Dialing 191 will simultaneously connect the listed agencies in a conference call.) EVALUATOR NOTE: If candidate is concerened about the button not being CLEARLY purple, Inform the candidate that the CTN 4915 button is PURPLE! EVALUATOWBOOTH CUE: Role-play the receiving agencies and confirm each agency is on the line and you are "Ready to Copy" Student Name: Standard Dials "1 91" on the purple colored button Verifies the following agencies are on the line: (1 ) (2) Columbia County EMA (3) Luzerne County EMA Media Operations Center Penna. Emergency Management Agency Eva1 - Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: RO 00.EP.004.002 Step 3 PERFORMANCE CHECKLIST Page 6 of 9 Action EVALUATOR NOTE:

After contact with the offsite agencies has been confirmed, the Time Critical Portion of the JPM ends. Record stop Time NOTE: When you communicate your phone number to the offsite agencies, the prefix for 4XXX numbers is (570) 759. (The 191 call originates from a 4XXX number.) Communicate ENR Form Student Name: Standard Communicates the following for line1 Call status: This is a Drill Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2.

Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: RO 00.EP.004.002 Step 4 15 _. PERFORMANCE CHECKLIST Page 7 of 9 Action EVALUATOR NOTE: Initial Declaration is not critical Student Name: Standard Communicates the following for line 2: This is: Candidate's Name at Susquehanna Steam Electric Station. My telephone number is: 570-759-4902 Notification time is: Current Time Communicates the following for line 3: EMERGENCY CLASSIFICATION:

ALERT UNIT: ONE and TWO Declaration Time: 5 MINUTES AGO DATE: TODAY'S DATE THIS REPRESENTS NAN: INITIAL DECLARATION - Eva1 Comments *Critical Step #Critical Seq uence Form NTP-QA-31 .E-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given To/JPM No.: RO 00.EP.004.002 PERFORMANCE CHECKLIST Page 8 of 9 Action Student Name: - ~~ Standard Communicates the following for line 4: The Classification Designation is: OA3 EVENT: OA3 BRIEF NON-TECHNICAL DESCRIPTION OF THE Communicates the following for line 5: THERE IS: NO NON-ROUTINE RADIOLOGICAL RELEASE IN PROGRESS Communicates the following for line 6: WIND DIRECTION IS FROM: 21 O WIND SPEED IS: as mph Communicates the following for line 7: THIS IS A DRILL Eva1 - Comments *Critical Step

  1. Critical Sequence Form NTP-CIA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: RO 00.EP.004.002 Step
  • PERFORMANCE CHECKLIST Action EVALUATOWBOOTH CUE: Candidate may choose to have one of the offsite agencies "REPEAT" back the communicated information.

If necessary, role-play the off site agency and "Repeat" back the information. EVALUATOR CUE: This completes the JPM EVALUATOR NOTE: In order for the candidate to pass the Time Critical element of this JPM, they must complete step 2 of this JPM within 15 minutes. Student Name: Standard Page 9 of 9 Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS An Alert has been declared due to sustained high winds greater than 80 mph resulting in visible damage to the ESSW pump house. (OA3) INITIATING CUE You have been assigned as the Control Room Communicator. Transmit initial information about the Emergency Condition to required organizations, IAW the appropriate procedure.

2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS An Alert has been declared due to sustained high winds greater than 80 mph resulting in visible damage to the ESSW pump house. (OA3) INITIATING CUE You have been assigned as the Control Room Communicator. Transmit initial information about the Emergency Condition to required organizations, IAW the appropriate procedure.

2005 NRC Exam As Given Page 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 45.0N.007.101 1 0912 6/05 2.1.25 N/A 2.813.1 APPl. JPM Number Rev. Date NUREG 1123 KIA No. KIA Imp. To No. Sys. No. Task Title: Determine Cause for Reactor Water Level Indication Anomaly/ldentify required Tech Spec Actions Completed By: Validated: Rich Chin 09/26/05 Writer Date I nst ructorNV riter Date Approval: Nuclear Trng.

Supv. Date 10120 Date of Performance: Validation Time (Min.) Time Taken (Min.) JPM Performed By: Student Name: Last First M.I. Employee # / S.S. # Performance Eva1 uat ion : ( ) Satisfactory ) Unsatisfactory Evaluator Name: Signature Typed or Printed Comments:

Form NTP-QA-31

.&I, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 45.0N.007.101

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.

2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. ON-145-004, RPV WATER LEVEL ANOMALY (Rev. 9) B. Tech Specs 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

None IV. TASK CONDITIONS A. Unit 1 is in MODE 2 with a plant startup in progress.

B. An anomaly exists with RPV water level instrument indication.

V. INITIATING CUE Use the appropriate procedure to address the anomaly. VI. TASK STANDARD Identifies instrument anomaly is due to Instrument Bus 1 1Y125 breaker 01 being tripped or de-energized, and re-energizes the instruments.

SROs additionally, identify the Required Tech Spec Actions. Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: 45.0N.007.101 Step *l 2 3 Action EVALUATOR NOTE: 0 This JPM must be performed in the simulator.

0 Establish task conditions as directed on attached setup instructions.

0 When the candidate is ready to begin JPM, place the simulator to RUN. Reviews RPV water level instruments indications in the simulator to determine which indicators are affected. EVALUATOR NOTE: Candidate may reference ON-117-001, LOSS OF INSTRUMENT BUS instead of ON-145-004, RPV WATER LEVEL ANOMALY. As long as all critical steps are accomplished this would be acceptable.

However, it may be necessary to ask a follow-up question for the Tech Specs. Obtains a controlled copy of ON-145-004. Reviews Symptoms and Observations for applicability.

Student Name: Standard Determines the following level indicators are reading zero: LI-14201 B1 on 1 C651 LI-14201 B on 1 C601 LI-142038 on 1 C601 Controlled copy obtained.

Ensures the Symptoms and Observations are applicable.

Eva1 - Comments *Critical Step #Critical Sequence Form Nll-QA-31.8-2.

Rev. 0. Pap I of I 2005 NRC Exam As Given I Appl. To/JPM No.: 45.0N.007.101 PERFORMANCE CHECKLIST Page 4 of 9 Student Name: Step 4 - 5 6 Action Records date and time of event. Selects the appropriate section and attachment.

Perform following for level instrumentation malfunction:

Refer to Attachment B checking following:

Instruments with common reference leg condensing chambers or excess flow check valves. Standard Enter current date and time. Selects Section 3.5 and Attachment B. On Attachment 6 pages 1 and 2 determines the following common reference leg condensing chambers and excess flow check valves are still indicating normal values and are NOT the source of the anomaly: LI-821 1R605 LR-C32 1R608 LI-14201 A LI-14201 A1 LI-l4203A LI-B21 1R604 LI-C23 1 R606B LWPR 14201 A Comments *Critical Step #Critical Sequence FomNTF'-QA-31.8-2.

Rev 0. Pap 1 of I 2005 NRC Exam As Given Appl. To/JPM No.: 45.0N.007.101 PERFORMANCE CHECKLIST Page 5 of 9 Action Instruments and indications with common variable leg supplies or excess flow check valves. EVALUATOR CUE:

If requested, inform candidate all instrumentation power is selected to its normal source. Student Name: Standard On Attachment 6 pages land 2 determines the following common variable leg condensing chambers and excess flow check valves are still indicating normal values and are NOT the source of the anomaly: LI-B21 1R605 LR-C32 1R608 LI-14201 A LI-14201 A1 LI-l4203A LI-B21 1R604 LI-C23 1 R606B LWPR 14201 A Eva1 - Comments *Critical Step #Critical Sequence Form KIP-QA-31.8-2.

Rev. 0. Page I of I 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: 45.ON.007.101 Action Instruments with common power supplies.

Automatic actions and alarms. IF level cannot be determined 2 +13" by at least two (2) independent indications, Enter EO 100 102, RPV Control. Comply with TS 3.3.1.1, 3.3.2.2, 3.3.6.1, 3.3.6.2, 3.3.5.1, 3.3.4.2 and 3.3.5.2. EVALUATOR CUE:

If necessary, Role-play Unit Supervisor and acknowledge the request. *Critical Step #Critical Sequence Form EFIP-QA-31.8-2, Rev 0. Pege I of I 2005 NRC Exam As Given Page 6 of 9 Student Name: Standard Determines the following indicators a common power supply: LI-14201 B1 on 1 C651 LI-14201 B on 1 C601 LI-142038 on 1 C601 Identifies a loss of 1Y125 "reaker 01 as the common mode failure.

NONE Determines this is N/A since other level indications are available.

Recognizes the need to Comply with TS 3.3.1.1, 3.3.2.2, 3.3.6.1, 3.3.6.2, 3.3.5.1, 3.3.4.2 and 3.3.5.2. Comments Appl. To/JPM No.: 45.0N.007.101 PERFORMANCE CHECKLIST Page 7 of 9 Action IF applicable, Restore power supplies for failed instrumentation. EVALUATOR CUE:

Role-play NPO and report 1Y125 breaker 01 is tripped. Informs Unit Supervisor that 1 Y125 breaker 01 is tripped. EVALUATOR CUE: Role-play Unit Supervisor and acknowledge the report And Instruct candidate to attempt one closure of 1Y125 breaker 01 is tripped. Contact NPO and instruct NPO to close 1 Y125 breaker 01. BOOTH OPERATOR CUE:

Remove malfunction on 1Y125 breaker 01 MRF DB117271 CLOSE Student Name: Standard Contacts NPO to check status of 1Y125 breaker 01 Informs Unit Supervisor that 1Y125 breaker 01 is tripped. Contacts NPO and instructs NPO to close 1Y125 breaker 01. Eva1 - Comments *Critical Step #Critical Sequence Fonn N1P-QA-31.8-2.

Rev. 0. Page I of I 2005 NRC Exam As Given Appl. To/JPM No.: 45.0N.007.101 PERFORMANCE CHECKLIST Page 8 of 9 ~ Action EVALUATOR CUE: Role-play NPO and report 1 Y 125 breaker 01 is CLOSED. Verifies level instruments are reading NORMAL EVALUATOR CUE: This completes the JPM for the RO ONLY. EVALUATOR CUE:

FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec required actions for the failed level transmitters.

Obtains a copy of the Tech Specs Student Name:

Standard Verifies the following indicators are now reading normal: LI-14201B1 on 1C65 LI-14201 B on 1 C601 LI-l4203B on 1 C601

References:

Tech Spec 3.3.3.1 Comments *Critical Step #Critical Sequence Form NTF'-QA-31.8-2.

Rev. 0. Page I of I 2005 NRC Exam As Given Appl. To/JPM No.: 45.0N.007.101 - Step - f17 PERFORMANCE CHECKLIST Page 9 of 9 Action Determines required actions EVALUATOR CUE:

This completes the JPM. Student Name: Standard Determines the following action is required:

Within 30 days restore required channel to operable status. ~ Comments *Critical Step

  1. Critical Sequence Form NTP-QA-31.8-2.

Rev. 0. Page 1 of 1 2005 NRC Exam As Given SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE 2 with a plant startup in progress B. An anomaly exists with RPV water level instrument indication.

C. It has been determined that extended range level transmitter LT-142038 has lost power. INITIATING CUE Determine the required Tech Spec actions.

2005 NRC Exam As Given Page 1 of 4 SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE 2 with a plant startup in progress.

B. An anomaly exists with RPV water level instrument indication.

C. It has been determined that extended range level transmitter LT-142038 has lost power. INITIATING CUE Determine the required Tech Spec actions. Page 2 of 4 2005 NRC Exam As Given TASK CONDITIONS A. Unit 1 is in MODE 2 with a plant startup in progress.

B. An anomaly exists in RPV water level instrument indication.

INITIATING CUE Use the appropriate procedure to address the anomaly. Page 3 of 4 2005 NRC Exam As Given TASK CONDITIONS A. Unit 1 is in MODE 2 with a plant startup in progress.

B. An anomaly exists in RPV water level instrument indication.

INITIATING CUE Use the appropriate procedure to address the anomaly. 2005 NRC Exam As Given Page 4 of 4 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 69.0P.044.051 1 9/27/05 2.3.6 N/A 3.1 Appl. JPM Number Rev. Date NUREG 1123 WA No. WA Imp. To No. Sys. No. Task Title:

Completed By: Validated:

Review and Approve A Radioactive Liquid Release Permit Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval: Nuclear Trng.

Supv. Date 15 Date of Performance: Validation Time (Min.) Time Taken (Min.) JPM Performed By: Student Name: Last First M.I. Employee # / S.S. # Performance Evaluation: ( ) Satisfactory ( ) Unsatisfactory Evaluator Name: Signature Typed or Printed Comments:

Form NTP-QA-31 .E-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 69.0P.044.051

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. 2. Whenever any electrical panel is opened for inspection during JPM performance. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPN will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES OP-069-050, Release of Liquid Radioactive Waste (Revision 31 ) I II . REACTIVITY MAN1 PULATIONS This JPM satisfies the requirements of Operational Activity(@:

NONE IV. TASK CONDITIONS A. Both Units are at 100%

power, all systems in normal alignment.

B. Total Site Blowdown Flow Transmitter FIT-01596 is out of service. C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT- 31 2. D. OP-069-050, Release of Liquid Radioactive Waste Attachment A "Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit" has been completed through step 2.1.7 E. Background reading for LIQUID RADWASTE RADIATION MONITOR [RITS-064331 is 3.1 OE3 CPM V. INITIATING CUE Verify completeness and accuracy of the permit and Independently verify Liquid Radwaste radiation monitor setup IAW OP-069-050, Release of Liquid Radioactive Waste Attachment A "Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit" step 2.1.8 and sign the appropriate block on the form. VI. TASK STANDARD Identifies INCORRECT settings for Actual High Rad setpoint and Actual Alert Rad setpoint.

Form NTP-QA-31.8-1, Rev. 0. Page 2 of 2 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: 69.0P.044.051 Step 1 Action EVALUATOR NOTE: Provide the candidate with a filled out copy of OP- 069-050, Release of Liquid Radioactive Waste Attachment A "Laundry Drain Sample Tank OT- 31 2 Radioactive Liquid Release Permit" completed through step 2.1.8. Insure High Rad setpoint calculation (in step 2.1.6.n) AND ACTUAL High Rad setpoint (in step 2.1.7 Position 0) are filled out with the MATH errors specified in steps 3 and 4 of this JPM. Student may use OP-069-050, Release of Liquid Radioactive Waste for guidance, however no marks should be made on that copy. Provide the candidate with a filled out OP-069-050, Release of Liquid Radioactive Waste Attachment F. Provide the candidate with a blank OP-069-050, Release of Liquid Radioactive Waste Attachment G. Provide the candidate with a filled out OP-069- 050, Release of Liquid Radioactive Waste Attachment H. A complete Release permit for Laundry Drain Sample Tank OT-312 will consist of Attachments A, F, G, and H. Obtain a controlled copy of OP-069-050, Release of Liquid Radioactive Waste *Critical Step #Critical Sequence Form NTP-QAB1.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Student Name: Standard Controlled copy obtained.

Page 3 of 6 Comments PERFORMANCE CHECKLIST Page 4 of 6 Appl. To/JPM No.: 69.0P.044.051 Action Selects the correct section to perform. EVALUATOR NOTE: Due to the nature of this JPM, the candidate may elect to perform the calculations FIRST before proceeding to Radwaste to Verify the proper setpoints. This is acceptable.

EVALUATOR NOTE: If candidate indicates that he/she would proceed to Radwaste to Verify the proper setpoints, provide the candidate with the following information:

"All setpoints are set in Radwaste as noted on the data sheet" Verifies High Rad setpoint *Critical Step #Critical Sequence Form NTP-QA91.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Student Name: Standard Selects section step 2.1.8 which requires review of previously completed steps 2.1.5.g through 2.1.7 of OP-069- 050, Release of Liquid Radioactive Waste Attachment A "Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit" Performs the following calculation:

7.OE4 + 3.1 E3 = 7.31 E4 and compares this to the number in block 2.1.6.n (1.1 E5) AND Determines there is a math error Comments PERFORMANCE CHECKLIST Appl. To/JPM No.: 69.0P.044.051

  • Step *4 *5 Action Verifies Alert Rad setpoint EVALUATOR CUE:

If candidate attempts to stop JPM here, tell candidate to complete the verification of the Rad monitors setup. Verifies Liquid Radwaste Radiation Monitor Setpoint inputs for Function Switch position 0 Verifies Liquid Radwaste Radiation Monitor Setpoint inputs for Function Switch position 1

  • Critical Step #Critical Seq uence Form NTP-QA91.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Student Name: Standard Performs the following calculation:

5.6E4 + 3.1 E3 = 5.91 E4 and compares this to the number in block 3.1.6.0 (8.7E5) AND Determines there is a math error Checks required setpoint and actual setpoint for High Rad setpoint.

Determines Setpoints have been incorrectly set to the setpoints determined by the math error.

Checks required setpoint and actual setpoint for Alert Rad setpoint.

Determines Setpoints have been incorrectly set to the setpoints determined by the math error.

Page 5 of 6 Comments Appl. To/JPM No.: 69.0P.044.051 PERFORMANCE CHECKLIST Page 6 of 6 Action Resolves the discrepancies EVALUATOR CUE:

That completes this JPM. *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Student Name: Standard Determines: The math errors and setpoint adjustments will need corrected before the permit can be authorized for discharge.

Eva1 - Comments TASK CONDITIONS A. Both Units are at 100% power, all systems in normal alignment.

6. Total Site Blowdown Flow Transmitter FIT-01596 is out of service. C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT-31 2. D. OP-069-050, Release of Liquid Radioactive Waste Attachment A "Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit" has been completed through step 2.1.7 E. Background reading for LIQUID RADWASTE RADIATION MONITOR [RITS-064331 is 3.1 OE3 CPM INITIATING CUE Verify completeness and accuracy of the permit and Independently verify Liquid Radwaste radiation monitor setup IAW OP-069-050, Release of Liquid Radioactive Waste Attachment A "Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit" step 2.1.8 and sign the appropriate block on the form. 2005 NRC Exam As Given 1 of2 TASK CONDITIONS A. Both Units are at 100% power, all systems in normal alignment.

B. Total Site Blowdown Flow Transmitter FIT-01596 is out of service. C. A Radioactive Liquid Release Permit is being prepared for Laundry Drain Sample Tank OT-31 2. D. OP-069-050, Release of Liquid Radioactive Waste Attachment A "Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit" has been completed through step 2.1.7 E. Background reading for LIQUID RADWASTE RADIATION MONITOR [RITS-064331 is 3.1 OE3 CPM INITIATING CUE Verify completeness and accuracy of the permit and Independently verify Liquid Radwaste radiation monitor setup IAW OP-069-050, Release of Liquid Radioactive Waste Attachment A "Laundry Drain Sample Tank OT-312 Radioactive Liquid Release Permit" step 2.1.8 and sign the appropriate block on the form. 2005 NRC Exam As Given 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SIR0 78.AD.001.101 0 09/26/05 2.1.18 N/A 2.913.0 JPM Number Rev. No.

Date NUREG 1123 WA No. WA Imp. Sys. No. Apple To Task Title:

Completed By: Validated Document a Failed LPRM Detector Rich Chin 09/26/05 Writer Date I nst r ucto r/W rite r Date Approval: Nuclear Trng.

Supv. Date of Performance:

Date 15/25 Validation Time (Min.) Time Taken (Min.) JPM Performed By: Student Name: Last First M.I. Employee #I S.S. # Performance Evaluation: ( ) Satisfactory ( ) Unsatisfactory Eva1 uat o r Name : Signatu re Typed or Printed Comments:

FomNTP-QA-31.8-1.

Rev. 0. Page I of2 2005 NAC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE S/RO 78.AD.001.101

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.

2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. 01-078-001 LPRM STATUS CONTROL, (Rev.

8) with PCAF 2005-1 121
6. TS amendment 217 111. REACTIVITY MANIPULATIONS This JPM satisfies the requirements of Operational Activity(s):

None IV. TASK CONDITIONS A. Unit 1 is in MODE lat 80% power. B. Reactor Engineering has completed their evaluation of a downscale alarm condition for LPRM detector 48-1

78. LPRM detector 48-1 78 is failed C. The PCOP has just NOW bypassed LPRM detector 48-17B in the lower relay room. D. All OPRM channels are INOPERABLE V. INITIATING CUE Complete all required "hardcopy" documentation in accordance with the appropriate instructions for LPRM detector 48-178. VI. TASK STANDARD Zone 4 is identified as not having more than 50% upscale alarms operable, placard place on reactor panel, Unit Supervisor Notified to reference TRO 3.3.9, SROs must additionally identify required TRO actions. FomNTP-QA-31.8-I,Rev.O.Pnge2of2 2005 NRC Exam As Given Appl. To/JPM No.:

S/RO 78.AD.001.101 Step 1 2 PERFORMANCE CHECKLIST Action EVALUATOR NOTE: 0 Ensure the following material is available to support performance of this JPM: A COPY Of 01-078-001.

0 Prepare attachments A & B with zone 4 having exactly 50% operable LPRM upscale alarms. Blank copy of attachment A & B. 0 EVALUATOR NOTE: To begin this JPM, provide the candidate with the Task Conditions and Initiating Cue Sheet. Obtains a controlled copy of procedure.

Refers to correct section. Student Name: ~~ Standard Controlled copy of 01-078-001 obtained.

Refers to section 4. Eva1 *Critical Step #Critical Sequence Page 3 of 8 Comments Form NTP-QA-31 8-2. Rev. 0, Page I of 1 2W5 NRC Exam ki Gwen Appl. To/JPM No.: S/RO 78.AD.001.101 Step PERFORMANCE CHECKLIST Page 4 of 8 Action Determines current LPRM status. EVALUATOR CUE:

When the candidate identifies where the current LPRM Upscale Alarm Status Control Log is retained provide the candidate with previously filled-out copy of Attachments A & B. If necessary, inform the candidate that the Unit Supervisor has VERIFIED the accuracy of the PREVIOUS Attachment A EVALUATOR NOTE: Allow candidate to use blank attachments from the copy of the procedure provided. Obtains a blank copy of Attachment A & B. Completes new Attachment A. *Critical Step #Critical Sequence Student Name: Standard Obtains the Operations Special Log Book in the Unit 1 control room and locates the previously completed copy of Attachment A & B. Blank copy obtained. Enters 1 for Unit. - Eva1 Comments Form NTP-QA-31.8-2.

Rev. 0. Pqc I of I 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 5 of 8 Appl. To/JPM No.: S/RO 78.AD.001.101 - Step 6 7 *8 9 Action EVALUATOR CUE:

If candidate elects to verify position of switches in lower relay room, provide the cue that the switches are in the positions indicated on Attachment A (Special log book)

Enter a check (4) in column (2) for LPRM alarms determined inoperable or bypassed for all other reasons. Consider all LPRM Upscale Alarms with a check in column (1) or (2) of Attachment A as inoperable Determine if 250% of LPRM Upscale alarms in each zone are operable.

Notify Reactor Engineering of all LPRM upscale alarms determined inoperable.

  • Critical Step #Critical Sequence Student Name: Standard Transfers the previous LPRM data to the new Attachment A. OR Candidate may desire to verify switches in lower relay room. Place a checkmark in column 2 adjacent to LPRM detector 48-17B in Zone 4. Circles YES for zone 1, 2, 3, 5, 6, 7, 8, and 9. Circles NO for zone 4. N/A Previously noted in JPM cue. - Eva1 Comments Form NTP-QA-31.8-2.

Rev. 0, Page I of I 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 78.AD.001.101 PERFORMANCE CHECKLIST Page 6 of 8 Action Attach placard to 1C651 indicating -c required # of LPRM Upscale Alarms. EVALUATOR NOTE: The placard is required to remain posted until all zones have

>50% upscale alarms operable.

If done in the classroom, discusses the need to attach the placard.

Refer to TRO 3.3.9 LPRM, upscale alarm instrumentation Complete an LPRM vs. APRM/LPRM Group Status Control Log (Attachment B) each time LPRM operability status is changed Circle all inoperable LPRM's on LPRM vs. APRM/LPRM Group Status Control Log (Attachment B) . *Critical Step #Critical Sequence Student Name: ~ Standard Attaches placard to operating panel 1 C651. Notifies the Unit Supervisor to Refer to TRO 3.3.9 LPRM Enters 1 for Unit. Transfers the previous LPRM data to the new Attach men t B . Circles LPRM detector 48-1 7 for APRM E, under the column 'B' Level. Eva1 Comments hmn NIP-QA-31 8-2. Rev. 0. Page I of I 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 78.AD.001.101 Step 15 16 PERFORMANCE CHECKLIST Page 7 of 8 Action Obtains review. EVALUATOR CUE: This completes the JPM for the ROs ONLY EVALUATOR CUE: FOR SRO CANDIDATES ONLY Give the SRO candidate the second cue sheet that addresses the Tech Spec and TRO for the INOPERABLE LPRMs Upscale alarms. Obtains a copy of the Tech Specs and TRM Student Name: Standard Submit the completed Attachment A and B to the Unit Supervisor.

References:

TRO 3.3.9 *Critical Step #Critical Sequence Comments Form N"-QA-31 8-2. Rev. 0. Page I of I 2005 NRC Exam As Given Appl. To/JPM No.: S/RO 78.AD.001.101 Step *17 PERFORMANCE CHECKLIST Action ~~ Determines required actions EVALUATOR CUE:

This completes the JPM. *Critical Step #Critical Sequence Student Name: Standard Determines the following actions are required:

TRO 3.3.9 condition H Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Post a sign on the reactor panel that less than 50% of the LPRM Upscale alarms are OPERABLE AND TRO 3.3.9 Condition E Immediately Place the reactor mode switch in the shutdown position Eva1 Page 8 of 8 Comments Fnrm NTP-QA-31.8.2.

Rev 0, Page 1 of I 2005 NRC Exam & Given TASK CONDITIONS A. B. C. D. Unit 1 is in MODE lat 80% power. Reactor Engineering has completed their evaluation of a downscale alarm condition for LPRM detector 48-1 78. LPRM detector 48-1 78 is failed The PCOP has just NOW bypassed LPRM detector 48-178 in the lower relay room. All OPRM channels are INOPERABLE INITIATING CUE Complete all required "hardcopy" documentation in accordance with the appropriate instruction for LPRM detector 48-1 78. 2005 NRC Exam As Given Page 1 of 4 TASK CONDITIONS A. Unit 1 is in MODE lat 80% power. 8. Reactor Engineering has completed their evaluation of a downscale alarm condition for LPRM detector 48-1 78. LPRM detector 48-1 7B is failed C. The PCOP has just NOW bypassed LPRM detector 48-178 in the lower relay room. D. All OPRM channels are INOPERABLE INITIATING CUE Complete all required "hardcopy" documentation in accordance with the appropriate instruction for LPRM detector 48-1 78. 2005 NRC Exam As Given Page 2 of 4 SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE lat 80% power. B. Reactor Engineering has completed evaluation of a downscale alarm condition for LPRM detector 48-1 78. C. LPRM detector 48-1 78 is failed and bypassed.

D. All OPRM channels are INOPERABLE E. It has been determined that < 50% of LPRM Upscale alarms in zone 4 are operable.

F. The combination of thermal power and core flow is IN Region II of the power to Flow Map. INITIATING CUE Determine the required Tech Spec and TRO actions. 2005 NRC Exam As Given Page 3 of 4 SRO ONLY TASK CONDITIONS A. Unit 1 is in MODE lat 80% power. B. Reactor Engineering has completed evaluation of a downscale alarm condition for LPRM detector 48-178. C. LPRM detector 48-178 is failed and bypassed.

D. All OPRM channels are INOPERABLE E. It has been determined that

< 50% of LPRM Upscale alarms in zone 4 are operable.

F. The combination of thermal power and core flow is IN Region II of the power to Flow Map. INITIATING CUE Determine the required Tech Spec and TRO actions.

2005 NRC Exam As Given Page 4 of 4 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.602 0 9/27/05 2.4.41 NIA 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title: Completed By: Validated: Perform Emergency Plan Classification (Scenario ILO-602) and Complete the ENR form Rich Chin 9/27/05 Writer Date InstructorIWriter Date Approval: Nuclear Trng.

Supv. Date of Performance: JPM Performed By: Date Time Critical 15 Minutes Validated Time (Min.) Time Taken (Min.) Student Name: Last First M.I. Employee # / S.S. # Performance Evaluation: ( ) Satisfactory ( ) Unsatisfactory Eva1 uat or Name : Signature Typed or Printed Comments:

Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.602

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.

2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. B. ILO-602, SIMULATOR EVALUATION SCENARIO C. EP-PS-1 OO-A D. EP-PS-1 OO-D E. EP-PS-100-9 EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV.

18 II I. R EACTlVlTY MAN1 PU LATl ON S This JPM satisfies the following Operational Activity@):

None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.

V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes. Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO 00.EP.001.602 Action EVALUATOR NOTE: 0 This JPM must be performed in the simulator following completion of the scenario ILO-602 as U nit Supervisor.

This is a time critical JPM. Ensure a copy of EP-PS-100 is available to support performance of this JPM. 0 0 EVALUATOR NOTE: To begin this JPM, provide the candidate with the Initiating Cue Sheet. EVALUATOR NOTE: After the candidate reviews the Task Conditions

/ Initiating Cue Sheet:

0 Ask if the candidate is ready to begin the JPM. 0 When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM. Record Start Time Student Name: Standard Page 3 of 9 Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name: Step 1 2 3 *4 Action Obtains a copy of EP-PS-100.

Identifies appropriate Tab Evaluates information.

EVALUATOR CUE: Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidate's request. Choose appropriate emergency classification level. Standard ~~ Controlled copy obtained. Determines Tab A is appropriate Tab to classify the event. Identifies from participation as The Unit Supervisor, ATWS and RPV water level dropped below -1 61 inches MS3 ATWS and ARI fail to reduce power to less than 5% OR FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO 00.EP.001.602 Student Name:

Action Record Time of Site Area Emergency declaration Determines appropriate procedure section for the classification.

Document and communicate the Emergency Classification.

If not performed earlier appoint an Emergency Plan Communicator If not performed earlier, appoint an NRC communicator.

Standard Determines TAB D Manage the Site Area Emergency is the appropriate TAB. Announces to Control Room Personnel:

I am assuming duties of the Emergency Director.

Site Area Emergency Classification declared based on MS3 ATWS and ARI fail to reduce power to less than 5% OR FS 1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification.

Appoints an Emergency Plan Communicator and instruct hidher to immediately perform EP-PS-126 E Plan Communicator.

Appoints an NRC Communicator and instruct hidher to perform EP-PS-135 NRC Communicator Eva1 - Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2.

Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: SRO 00.EP.001.602 Step 10 11 PERFORMANCE CHECKLIST Page 6 of 9 Action Generate and approve an ENR form to be transmitted by the Emergency Plan Communicator.

EVALUATOR CUE: Inform the candidate that the Control

  1. in the next step will be CR-ILO-602 Fill out and approve the Emergency Notification Report Form. EVALUATOR NOTE: The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form).

Student Name: Standard Refers to ENR Form under Tab 9. Fills out and approves the Emergency Notification Report Form as follows: Control ## CR-ILO-602 LINE 1. Call Status: Places checkmark in This is a drill box - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: SRO 00.EP.001.602 Step *12 *13 PERFORMANCE CHECKLIST Page 7 of 9 Action Completes line 3 EVALUATOR NOTE:

Initial Declaration is not critical EVALUATOR NOTE:

MS3 or FS1 alone is sufficient for the Brief Non- Technical Description for the initial notification.

Candidate may paraphrase this description Completes line 4 Student Name:

Standard LINE 3. Emergency Classification: Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date. Places a checkmark in this represents NAN initial declaration box in classification status. LINE 4. The Emergency action level (EAL) number is: Records EAL MS 3 or FS1 Brief non -technical description of the event: Records MS 3 or FS1 Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO 00.EP.001.602 Step *14 15 16 Action ~ Completes line 5 Completes line 6 Completes line 7 Approves the Emergency Notification Report Form EVALUATOR NOTE: Candidate may review the filled out ENR form with the E Plan Communicator.

Student Name: Standard LINE 5. Places a checkmark in the NO Non-routine radiological release box LINE 6 Records Wind Direction is from:

10" Wind Speed is: 5 mph LINE 7.

Conclusion:

Places a checkmark in this is a drill box. Records the following on space provided:

Approved: - HidHer name Time: - Current time Date: - Current Date Page 8 of 9 Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO 00.EP.001.602 Step 18 Action Give the approved ENR form to the E Plan Communicator.

EVALUATOR CUE: If necessary, Role-play the communicator and accept the filled out form. EVALUATOR CUE: Inform the candidate the JPM is complete.

EVALUATOR NOTE: The total time from the JPM start to step 5 of the JPM must be 21 5 minutes in order for the time critical portion of the JPM to be satisfactory.

EVALUATOR NOTE: If RPV water level drops below -205 inches the EAL will escalate to a General Emergency under MG3, and the ENR form will also reflect AN airborne NON routine radiological release based on loss of the Fuel clad barrier. Student Name: Standard Provides the filled out ENR form to the E Plan Communicator.

Page 9 of 9 Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0. Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.

Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.

INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. 2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.

Assume Wind Direction was from:

10" and Wind Speed was: 5 mph throughout the scenario.

INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. 2005 NRC Exam As Given Page 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.505 0 9/27/05 2.4.41 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA Imp. To Sys. No. Task Title:

Completed By: Validated: Perform Emergency Plan Classification (Scenario ILO-505) and Complete the ENR form Rich Chin 9/27/05 Writer Date I nstructorNV riter Date Approval: Nuclear Trng.

Supv. Date of Performance:

JPM Performed By: Date Time Critical 15 Minutes Validated Time (Min.) Time Taken (Min.) Student Name: Last First M.I. Employee #I S.S. # Performance ( ) Satisfactory ( ) Unsatisfactory Eva1 uat ion : Evaluator Name: Signature Typed or Printed Comments:

Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.505

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.
6. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.
2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. 6. ILO-505, SIMULATOR EVALUATION SCENARIO C. EP-PS-1 OO-A D. EP-PS-1 OO-D E. EP-PS-100-9 EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV.

18 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s):

None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from:

10" and Wind Speed was: 5 mph throughout the scenario.

V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes. Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 3 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name: Step Action Standard EVALUATOR NOTE:

This JPM must be performed in the simulator following completion of the scenario ILO-505 as Unit Supervisor.

This is a time critical JPM. Ensure a copy of EP-PS-100 is available to support performance of this JPM. 0 EVALUATOR NOTE: To begin this JPM, provide the candidate with the Initiating Cue Sheet. EVALUATOR NOTE:

After the candidate reviews the Task Conditions

/ Initiating Cue Sheet: 0 0 Ask if the candidate is ready to begin the JPM. When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM. Record Start Time - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 - Step 1 2 3 *4 5 6 Action Obtains a copy of EP-PS-100. Identifies appropriate Tab Evaluates information. EVALUATOR CUE:

Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidate's request. Choose appropriate emergency classification level. Record Time of Site Area Emergency declaration Determines appropriate procedure section for the classification.

Student Name: Standard Controlled copy obtained.

Determines Tab A is appropriate Tab to classify the event. Identifies from participation as The Unit Supervisor, RPV water level dropped below -1 61 inches FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Determines TAB D Manage the Site Area Emergency is the appropriate TAB. - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name: - - Step 7 8 9 10 Action Document and communicate the Emergency Classification.

If not performed earlier appoint an Emergency Plan Communicator If not performed earlier, appoint an NRC communicator. Generate and approve an ENR form to be transmitted by the Emergency Plan Communicator. EVALUATOR CUE:

Inform the candidate that the Control

  1. in the next step will be CR-ILO-505 Standard Announces to Control Room Personnel:

I am assuming duties of the Emergency Director.

Site Area Emergency Classification declared based on FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification.

Appoints an Emergency Plan Communicator and instruct hidher to immediately perform EP-PS-126 E Plan Communicator.

Appoints an NRC Communicator and instruct hidher to perform EP-PS-135 NRC Communicator Refers to ENR Form under Tab 9. Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 6 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name: - Step 11 *12 Action Fill out and approve the Emergency Notification Report Form.

EVALUATOR NOTE: The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). Completes line 3 EVALUATOR NOTE: Initial Declaration is not critical Standard Fills out and approves the Emergency Notification Report Form as follows: Control # CR-ILO-505 LINE 1. Call Status: Places checkmark in This is a drill box LINE 3. Emergency Classification: Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date.

Places a checkmark in this represents NAN initial declaration box in classification status. Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO 00.EP.001.505 Action EVALUATOR NOTE: FS1 alone is sufficient for the Brief Non-Technical Description for the initial notification.

Candidate may paraphrase this description Completes line 4 Completes line 5 Completes line 6 Page 7 of 9 Student Name: - Standard LINE 4. The Emergency action level (EAL) number is: Records EAL FS1 Brief non -technical description of the event: Records FS1 LINE 5. Places a checkmark in the NO Non-routine radiological release box LINE 6 Records Wind Direction is from: 10" Wind Speed is: 5 mph Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 8 of 9 Appl. To/JPM No.: SRO 00.EP.001.505 Student Name: Step 16 *17 18 Action Completes line 7 Approves the Emergency Notification Report Form EVALUATOR NOTE:

Candidate may review the filled out ENR form with the E Plan Communicator. Give the approved ENR form to the E Plan Communicator.

EVALUATOR CUE: If necessary, Role-play the communicator and accept the filled out form. EVALUATOR CUE: Inform the candidate the JPM is complete.

Standard LINE 7.

Conclusion:

Places a checkmark in this is a drill box. Records the following on space provided:

Approved: - HidHer name Time: - Current time Date: - Current Date Provides the filled out ENR form to the E Plan Communicator.

Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2.

Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO OO.EP.OO1 SO5 Step Page 9 of 9 Action Standard Eva1 Comments EVALUATOR NOTE: The total time from the JPM start to step 5 of the JPM must be 51 5 minutes in order for the time critical portion of the JPM to be satisfactory.

Student Name: *Critical Step #Critical Sequence Form NTP-QA-31.8-2.

Rev. 0. Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.

Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.

INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. 2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.

Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.

INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.

2005 NRC Exam As Given Page 2 of 2 PPL SUSQUEHANNA, LLC JOB PERFORMANCE MEASURE APPROVAL AND ADMINISTRATIVE DATA SHEET SRO 00.EP.001.305 0 9/27/05 2.4.41 N/A 4.0 APPl. JPM Number Rev. No. Date NUREG 1123 WA No. WA ImD. .. To Sys. No. Task Title:

Completed By: Validated: Perform Emergency Plan Classification (Scenario ILO-305) and Complete the ENR form Rich Chin 9/27/05 Writer Date InstructorNVriter Date Approval: Nuclear Trng.

Supv. Date of Performance: JPM Performed By: Date Time Critical 15 Minutes Validated Time (Min.) Time Taken (Min.) Student Name: Last First M.I. Employee # / S.S. # Performance Evaluation: ( ) Satisfactory ( ) Unsatisfactory Evaluator Name: Signature Typed or Printed Comments:

Form NTP-QA-31.8-1, Rev. 0, Page 1 of 2 2005 NRC Exam As Given REQUIRED TASK INFORMATION JOB PERFORMANCE MEASURE SRO 00.EP.001.305

1. SAFETY CONSIDERATIONS A. All Operations personnel are responsible for maintaining their radiation exposure As Low As Reasonably Achievable in accordance with OP-AD-002, Standards for Shift Operations.

B. All applicable safety precautions shall be taken in accordance with established PPL safety policies and the Safety Rule Book, for example: 1. Whenever any electrical panel is opened for inspection during JPM performance.

2. Whenever entering any plant area where specific safety equipment; such as hearing or eye protection, safety shoes, hardhats, etc; is required and/or posted as being necessary.

C. If in the judgment of the evaluator any safety issue occurs during the performance of a JPM, the JPM will be terminated until the issue is resolved.

D. Peer checking is the expectation for all evolutions; however, since a JPM is an individual effort, no peer check will be provided and Self Checking is required.

II. REFERENCES A. B. ILO-305, SIMULATOR EVALUATION SCENARIO C. EP-PS-1 OO-A D. EP-PS-1 OO-D E. EP-PS-100-9 EP-PS-100, EMERGENCY DIRECTOR CONTROL ROOM, REV. 18 111. REACTIVITY MANIPULATIONS This JPM satisfies the following Operational Activity(s):

None IV. TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario. Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.

V. INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. VI. TASK STANDARD Emergency classification of Site Area Emergency declared within 15 minutes.

Form NTP-QA-31.8-1, Rev. 0, Page 2 of 2 2005 NRC Exam As Given PERFORMANCE CHECKLIST Appl. To/JPM No.: SRO 00.EP.001.305 Step Action EVALUATOR NOTE: This JPM must be performed in the simulator following completion of the scenario ILO-305 as Unit Supervisor.

This is a time critical JPM. Ensure a copy of EP-PS-100 is available to support performance of this JPM. 0 0 EVALUATOR NOTE: To begin this JPM, provide the candidate with the Initiating Cue Sheet. EVALUATOR NOTE: After the candidate reviews the Task Conditions

/ Initiating Cue Sheet: 0 0 Ask if the candidate is ready to begin the JPM. When the candidate is ready to begin the JPM inform the candidate that this is a Time Critical JPM. Record Start Time Student Name: Standard Page 3 of 9 Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 4 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name: Step 1 2 3 *4 5 6 Action Obtains a copy of EP-PS-100. Identifies appropriate Tab Evaluates information. EVALUATOR CUE:

Assistance may be necessary for some specific scenario data or sequence of events. Use your judgment on acceptable levels of cueing based on candidate's request.

Choose appropriate emergency classification level. Record Time of Site Area Emergency declaration Determines appropriate procedure section for the classification.

Standard Controlled copy obtained.

Determines Tab A is appropriate Tab to classify the event. Identifies from participation as The Unit Supervisor, that 2 Reactor Building Areas exceeded Max Safe Radiation levels.

FS1 Loss or Potential loss of ANY 2 Fission Product Barriers Determines TAB D Manage the Site Area Emergency is the appropriate TAB. - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST Page 5 of 9 Appl. To/JPM No.: SRO 00.EP.001.305 Student Name: Step 7 8 9 10 Action Document and communicate the Emergency Classification.

If not performed earlier appoint an Emergency Plan Communicator If not performed earlier, appoint an NRC communicator.

Generate and approve an ENR form to be transmitted by the Emergency Plan Communicator. EVALUATOR CUE: Inform the candidate that the Control

    1. in the next step will be CR-ILO-305 Standard Announces to Control Room Personnel:

I am assuming duties of the Emergency Director.

Site Area Emergency Classification declared based on FSl Loss or Potential loss of ANY 2 Fission Product Barriers Time and Date of Classification.

Appoints an Emergency Plan Communicator and instruct hidher to immediately perform EP-PS-126 E Plan Communicator.

Appoints an NRC Communicator and instruct hidher to perform EP-PS-135 NRC Communicator Refers to ENR Form under Tab

9. - Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA91.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given PERFORMANCE CHECKLIST ( Page 6 of 9 Appl. To/JPM No.:

SRO 00.EP.001.305 Student Name: - Step 11 *12 Action Fill out and approve the Emergency Notification Report Form.

EVALUATOR NOTE: The communicator will fill out the communicator name, callback telephone number, and time notification is initiated. (Line 2 of the Emergency Notification Report Form). Completes line 3 EVALUATOR NOTE: Initial Declaration is not critical ~ Standard Fills out and approves the Emergency Notification Report Form as follows: Control # CR-ILO-305 LINE 1. Call Status:

Places checkmark in This is a drill box LINE 3. Emergency Classification:

Places checkmark in Site Area Emergency box Places checkmark in Unit one box Records the Declaration time and date.

Places a checkmark in this represents NAN initial declaration box in classification status. Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given Appl. To/JPM No.: SRO 00.EP.001.305 Step 3k14 15 i PERFORMANCE CHECKLIST Action EVALUATOR NOTE:

FS1 alone is sufficient for the Brief Non-Technical Description for the initial notification.

Candidate may paraphrase this description Completes line 4 Completes line 5 Completes line 6 Student Name: Standard LINE 4. The Emergency action level (EAL) number is: Records EAL FS1 Brief non -technical description of the event: Records FS1 LINE 5. Places a checkmark in the AN Airborne Non-routine radiological release box LINE 6 Records Wind Direction is from: 10" Wind Speed is:

5 mph Page 7 of 9 Eva1 Comments *Critical Step #Critical Sequence Form NTP-QA-31.8-2, Rev. 0, Page 1 of 1 2005 NRC Exam As Given TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.

Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.

INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form.

2005 NRC Exam As Given Page 1 of 2 TASK CONDITIONS Consider the plant transient conditions and failures experienced in this scenario.

Assume Wind Direction was from: 10" and Wind Speed was: 5 mph throughout the scenario.

INITIATING CUE Provide the highest emergency classification level for the events in the scenario just completed, and complete the Emergency Notification Form. 2005 NRC Exam As Given Page 2 of 2