March 14, 2006Mr. M. NazarSenior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106
SUBJECT:
D.C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2INFORMATION REQUEST FOR AN NRC BIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION
Dear Mr. Nazar:
On May 8, 2006, the NRC will begin a Modifications and 10 CFR 50.59 (MOD/50.59) baselineinspection at the D.C. Cook Nuclear Power Plant. This inspection will be performed in accordance with the NRC baseline Inspection Procedures IP 71111.02 and IP 71111.17. Theon-site portion of the inspection will take place on May 8 through May 12, 2006 and May 22through May 26, 2006.Experience has shown that these baseline inspections are extremely resource intensive, bothfor the NRC inspectors and the licensee staff. In order to minimize the inspection impact on thesite, and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups.
The first group is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be available to the Regional Office no later than April 3, 2006. The inspection team will review this information and, by April 11, 2006, willrequest specific items that should be available for review by April 28, 2006. The second group of requested documents contain additional items that the team will review, or need access to,during the inspection. Certain documents in Group II.(1) will be requested for review in theRegional Office the week prior to the inspection. The remaining documents should be available by the first day of the on-site inspection, May 8, 2006. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection.
It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date andcomplete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.The lead inspector for this inspection is Mr. Robert Daley. We understand that our regulatorycontact for this inspection is of your organization. If thereare any questions about the inspection or the material requested, please contact the leadinspector at (630) 829-9749 or via e-mail at RCD@nrc.gov.
M. Nazar-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC PublicDocument Room or from the Publicly Available Records (PARS) component of NRC'sdocument system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,/RA/David E. Hills, ChiefEngineering Branch 1 Division of Reactor Safety Docket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74
Enclosure:
Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection)cc w/encl:J. Jensen, Site Vice PresidentL. Weber, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists C. Crane-2-Docket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74
Enclosure:
Modification and 50.59 Inspection Document Request (Information for Preparation Week and Information Available On-site During Inspection)cc w/encl:J. Jensen, Site Vice PresidentL. Weber, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned ScientistsADAMS Distribution
- JLD PST RidsNrrDirsIrib
GEG KGO BJK1 CAA1 DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.govDOCUMENT NAME:E:\Filenet\ML060740241.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMERDaley: lsCLipaDHills DATE03/14/0603/14/0603/14/06 INITIAL DOCUMENT REQUESTEnclosure 1OFFICIAL RECORD COPYMODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUESTInspection Report
- 05000315/2006009; 05000316/2006009 (DRS)Inspection Dates
- May 8 through May 26, 2006Inspection Procedures
- IP 71111- 02, "Evaluation of Changes, Tests, or Experiments"IP 71111- 17, "Permanent Plant Modifications"Lead Inspector
- R. Daley(630) 829-9749I. Information Requested for In-Office Preparation WeekThe following information is requested by April 3, 2006, or sooner, to facilitate the selection ofspecific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by April 11, 2006. We will request that certain items be made available to the Regional Officeduring the week prior to the inspection, no later than April 28, 2006. We request that theremaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the last Permanent Modification inspection exit (September 17, 2004) to the present. If you have any questions regarding this information, please call the team leader as soon as possible.(1)List of "permanent plant modifications" to risk significant systems, structures orcomponents. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes; design changes; set point changes; equivalency evaluations; suitability analyses; and commercial grade dedications.)The list should contain the number of each document, the title, the revision(or date), and the affected system. In addition to the list, please provide adescription of each modification, and a list of associated calculations, and affected procedures. (2)List of all 10 CFR 50.59 completed evaluations involving: (a)calculations;(b)procedure revisions; (c)changes to the facility (modifications);(b)non-routine operating configurations; and (c)departures in methods of analyses.
INITIAL DOCUMENT REQUESTEnclosure 2The list should contain the number and title of each document, a brief descriptionof the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was soughtand obtained.(3)List of all 10 CFR 50.59 changes that have been screened out as not requiring a fullevaluation involving: (a)calculations; (b)procedure revisions; (c)changes to the facility (modifications); (d)non-routine operating configurations; and (e)departures in methods of analyses. The list should contain the number and title of each document, a brief description ofthe change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).(4)List of any modifications, procedure revisions, or UFSAR changes where it wasdetermined that 10 CFR 50.59 did not apply.(5)List of corrective action documents (open and closed) that address plant permanentmodification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification, and 10 CFR 50.59 change implementation.The list should contain the number, title and revision (or date) of each document, theaffected system and corresponding documentation (if applicable), and should besorted in order of significance.(6)Copies of procedures addressing the following: modifications, design changes, setpoint changes, equivalency evaluations or suitability analyses, commercial gradededications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates.(7)UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies ofthe complete submittal.(8)Name(s) and phone numbers for the regulatory and technical contacts. (9)Current management and engineering organizational chart.
INITIAL DOCUMENT REQUESTEnclosure 3II.Information Requested to be Available the Week Prior to Inspection (Request will bemade by April 11, 2006) or on First Day of Inspection (May 8, 2006)(1)Copies of all selected items from Section I. This includes copies of associateddocuments such as calculations, post-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.(2)Copies of these documents do not need to be solely available to the team as long asthe inspectors have easy and unrestrained access to them.(f)Updated Final Safety Analysis Report;(g)Original FSAR Volumes; (h)Original SER and Supplements (for Original FSAR);
(i)FSAR Question and Answers; (j)Quality Assurance Plan; (k)Technical Specifications; (l)Latest IPE/PRA Report; (m)Vendor Manuals; and (n)The Latest 10 CFR 50.59 FSAR Update Submittal.(3)Please ensure that other supporting documents for the selected items have beenlocated and are readily retrievable as the team will likely be requesting thesedocuments during the inspections. Examples of supporting documents are:(a)Drawings supporting the modifications;(b)Procedures affected by the modifications; and (c)UFSAR change papers generated due to a 10 CFR 50.59 evaluation.(4)Current management and engineering organizational chart.III.Information Requested to be provided throughout the inspection(1)Copies of any corrective action documents generated as a result of the team'squestions or queries during this inspection.(2)Copies of any corrective action documents generated that are related to documentsfrom the list that we give you on April 11, 2006. For the purposes of this request, only provide corrective action documents generated from April 11, 2006 until the first day of the inspection, May 8, 2006. (2)Copies of the list of questions submitted by the team members and thestatus/resolution of the information requested, (provide daily during the inspection to each team member).If you have questions regarding the information requested, please contact the team leader.