MONTHYEARL-2018-181, Revised Figure 3.a.1-1 for Turkey Point and Point Beach Updated Final Response to GL 2004-022018-10-18018 October 2018 Revised Figure 3.a.1-1 for Turkey Point and Point Beach Updated Final Response to GL 2004-02 ML13028A0662012-12-17017 December 2012 2012 Point Beach Nuclear Plant Initial License Examination Proposed Written Exam Handouts NRC 2010-0069, License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information2010-07-0808 July 2010 License Amendment Request 261 Extended Power Uprate Response to Request for Additional Information ML0406309492003-10-17017 October 2003 Drawing LR-M-223, Rev. 1, Unit 1, Potable Water. Sheet 2 ML0406308462003-10-17017 October 2003 Drawing L-M-219, Rev. 1, Unit 1, Fuel Oil System. Sheet 1 ML0406309482003-10-17017 October 2003 Drawing LR-PBM-231, Rev. 1, Units 1 & 2, De-Ionized and Reactor Makeup Water. Sheet 1 ML0406309462003-10-17017 October 2003 Drawing LR-PBM-250, Rev. 1, Units 1 & 2, Battery & Ee Room Rms Vac. ML0406309142003-10-17017 October 2003 Drawing LR-M-214, Rev. 1, Unit 1, Aux/Htg Steam, Chilled & Hot Water Systems Details. Sheet 4 ML0406309102003-10-17017 October 2003 Drawing LR-M-211, Rev. 1, Units 1 & 2, Diesel Generator Building Air Flow Diagram HVAC System. Sheet 3 ML0406309072003-10-17017 October 2003 Drawing LR-M-144, Rev. 1, Units 1 & 2, HVAC Battery & SWGR Rooms. Sheet 3 ML0406309012003-10-17017 October 2003 Drawing LR-M-144, Rev. 1, Units 1 & 2, Heating & Ventilation Temperature Control. Sheet 2 ML0406308972003-10-17017 October 2003 Drawing LR-M-144, Rev. 1, Units 1 & 2, Heating & Ventilation. Sheet 1 ML0406308932003-10-17017 October 2003 Drawing LR-M-143, Rev. 1, Units 1 & 2, Heating & Ventilation Temperature Controls. ML0406308912003-10-17017 October 2003 Drawing LR-PBM-3232, Rev. 1, Unit 2, Instrument Air Containment Purge Valve Pneumatic Control Valve. ML0406308842003-10-17017 October 2003 Drawing LR-M-2215, Rev. 1, Unit 2, Heating and Ventilation. Sheet 1 ML0406308872003-10-17017 October 2003 Drawing LR-PBM-332, Rev. 1, Unit 1, Instrument Air Containment Purge Valve Pneumatic Control Scheme. ML0406308772003-10-17017 October 2003 Drawing LR-M-215, Rev. 1, Unit 1, Heating & Ventilation System. Sheet 1 ML0406308762003-10-17017 October 2003 Drawing LR-FIG 12.2.6, Rev. 1, Units 1 & 2, Gtg Instrument and Control Air System. ML0406308732003-10-17017 October 2003 Drawing LR-FIG 12.2.5, Rev. 1, Units 1 & 2, Fuel Oil Supply & Control Systems Schematic Diagram. ML0406308692003-10-17017 October 2003 Drawing LR-FIG 12.2.4, Rev. 1, Units 1 & 2, Oil System Schematic Diagram. ML0406308672003-10-17017 October 2003 Drawing LR-FIG 12.2.3, Rev. 1, Units 1 & 2, Gas Turbine Air System Schematic Diagram. ML0406308652003-10-17017 October 2003 Drawing LR-M-227, Rev. 1, Units 1 & 2, Glycol Cooling System Diesel Generator Building. Sheet 2 ML0406308622003-10-17017 October 2003 Drawing LR-M-227, Rev. 1, Units 1 & 2, Glycol Cooling System Diesel Generator Building. Sheet 1 ML0406308602003-10-17017 October 2003 Drawing LR-M-226, Rev. 1, Units 1 & 2, Air Intake & Exhaust Diesel Generator Building. Sheet 2 ML0406308592003-10-17017 October 2003 Drawing LR-M-226, Rev. 1, Units 1 & 2, Air Intake & Exhaust Diesel Generator Building. Sheet 1 ML0406308522003-10-17017 October 2003 Drawing LR-MKW-6090F04001, Rev. 1, Units 1 & 2, Cooling System. Sheet 1 ML0406308512003-10-17017 October 2003 Drawing LR-MKW-6090F03001, Rev. 1, Units 1 & 2, Lube Oil System. Sheet 1 ML0406308502003-10-17017 October 2003 Drawing L-M-219, Rev. 1, Units 1 & 2, Fuel Oil System Diesel Generator Building. Sheet 3 ML0406308482003-10-17017 October 2003 Drawing L-M-219, Rev. 1, Units 1 & 2, Fuel Oil System Diesel Generator Building. Sheet 2 ML0406309542003-10-17017 October 2003 Drawing LR-M-212, Rev. 1, Unit 1, Circulating Water System Cond. Air Removal & Priming. Sheet 1 ML0406308452003-10-17017 October 2003 Drawing LR-M-209, Rev. 1, Units 1 & 2, Starting Air System Diesel Generator Building. Sheet 15 ML0406310272003-10-17017 October 2003 Drawing LR-ELECTRICAL-E1, Rev 1, Units 1 & 2, Electrical Power Distribution. ML0406310222003-10-17017 October 2003 Drawing LR-6704-E-353401, Rev. 1, Units 1 & 2, Yard Structures. ML0406310202003-10-17017 October 2003 Drawing LR-E-100, Rev. 1, Units 1 & 2, Yard Structures. Sheet 1 ML0406310162003-10-17017 October 2003 Drawing LR-C-3, Rev. 1, Units 1 & 2, Plant Structures. ML0406310122003-10-17017 October 2003 Drawing LR-M-217, Rev. 1, Units 1 & 2, Auxiliary Feedwater System. Sheet 2 ML0406310082003-10-17017 October 2003 Drawing LR-M-217, Rev. 1, Unit 1, Auxiliary Feedwater System. Sheet 1 ML0406310062003-10-17017 October 2003 Drawing LR-M-2202, Rev. 1, Unit 2, Feedwater System. Sheet 2 ML0406310022003-10-17017 October 2003 Drawing LR-M-202, Rev. 1, Unit 1, Feedwater System. Sheet 2 ML0406309992003-10-17017 October 2003 Drawing LR-M-202, Rev. 1, Unit 1, Condensate System. Sheet 1 ML0406309942003-10-17017 October 2003 Drawing LR-PBM-227, Rev. 1, Units 1 & 2, Radwaste System Supply. ML0406309902003-10-17017 October 2003 Drawing LR-M-2201, Rev. 1, Unit 2, S.G. Blowdown System. Sheet 3 ML0406309882003-10-17017 October 2003 Drawing LR-M-2201, Rev. 1, Unit 2, Main & Reheat Steam System. Sheet 1 ML0406309832003-10-17017 October 2003 Drawing LR-M-201, Rev. 1, Unit 1, S.G. Blowdown System. Sheet 3 ML0406309822003-10-17017 October 2003 Drawing LR-M-201, Rev. 1, Unit 1, Main & Reheat Steam System. Sheet 1 ML0406309732003-10-17017 October 2003 Drawing LR-M-209, Rev. 1, Units 1 & 2, Instrument Air. Sheet 11 ML0406309702003-10-17017 October 2003 Drawing LR-M-209, Rev. 1, Units 1 & 2, Instrument Air. Sheet 8 ML0406309642003-10-17017 October 2003 Drawing LR-M-209, Rev. 1, Units 1 & 2, Service Air. Sheet 2 ML0406309802003-10-17017 October 2003 Drawing LR-M-209, Rev. 1, Units 1 & 2, Emergency Breathing Air. Sheet 13 ML0406310042003-10-17017 October 2003 Drawing LR-M-2202, Rev. 1, Unit 2, Condensate System. Sheet 1 2018-10-18
[Table view] Category:License-Operator
MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21281A1202021-10-0808 October 2021 GFE Results, September 2021 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 2024-07-11
[Table view] Category:Part 55 Examination Related Material
MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024 Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 2024-07-11
[Table view] |
Text
file:///Gl/
...Proposed/Written%20Exam/written%20exam%20references/RO%20Provided%20to%20examinees/Steam%20Table%20Mollier.txt
[1/4/2013 8:22:36 AM]
POINT BEACH NUCLEAR PLANT EMERGENCY OPERATING PROCEDURE
.......................................................................
- 37 Control RCS Pressure And Charging *
- Flow To Minimize RCS To S/G Leakage:
- a. Perform appropriate action(s)
- RISING LOWERING OFF SCALE HIGH
- LESS THAN 0 Raise charging Raise charging 0 Raise charging
- OR EQUAL TO flow flow flow * * [44%] 24% *
- 0 Depressurize 0 Maintain RCS and *
- BETWEEN Depressurize Turn on Maintain RCS and * * [44%] 24% RCS using PZR heaters ruptured S/G *
- AND 50% Step 38 pressures equal
- BETWEEN 0 Depressurize Turn on Maintain RCS and *
- 50% AND RCS using PZR heaters ruptured S/G * * [60%1 68% Step 38 pressures equal * * *
- GREATER THAN Reduce Turn on PZR Maintain RCS and *
- OR EQUAL TO charging flow heaters ruptured S/G * * [60%] 68% pressures equal * * * ....................................................................... STEAM GENERATOR TUBE RUPTURE EOP-3 UNIT 1 SAFETY RELATED Revision 43 11/2011 Page 28 of 44 lsTEP I ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED I I I CAUTION RCS and ruptured S/G pressures must be maintained less than 1050 psig. I' " I MFIVs, MFRVs, and MFRV Bypass Valves
3.7.3 Point
Beach 3.7.3-1 Unit 1 - Amendment No. 241 Unit 2 - Amendment No. 245
3.7 PLANT
SYSTEMS
3.7.3 Main Feedwater Isolation Valves (MFIVs), Main Feedwater Regulating Valves (MFRVs) and MFRV Bypass Valves
LCO 3.7.3 Main Feedwater Isolation shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
NOTE-----------------------------------------------------
Separate Condition entry is allowed for each valve.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more MFIVs inoperable.
A.1 Close or isolate MFIV.
AND A.2 Verify MFIV is closed or isolated.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
Once per 7 days B. One or more MFRVs inoperable.
B.1 Close or isolate MFRV.
AND B.2 Verify MFRV is closed or isolated.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
Once per 7 days
C. One or more MFRV Bypass Valves
inoperable.
C.1 Close or isolate MFRV Bypass Valve
AND C.2 Verify MFRV Bypass Valve is closed or
isolated 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
Once per 7 days
MFIVs, MFRVs, and MFRV Bypass Valves
3.7.3 Point
Beach 3.7.3-2 Unit 1 - Amendment No. 241 Unit 2 - Amendment No. 245 ACTIONS (continued) CONDITION REQUIRED ACTION COMPLETION TIME D. Two valves in the same flowpath inoperable.
D.1 Isolate affected flow path 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />
E. Required Action and associated Completion
Time not met.
E.1 Be in MODE 3.
AND E.2 Be in MODE 4.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify each MFIV, MFRV, and MFRV bypass valve, actuate to the isolation position on an
actual or simulated actuation signal.
18 months
SR 3.7.3.2 Verify each MFIV, MFRV, and MFRV Bypass Valve isolation time is within limits.
In accordance
with the Inservice Testing
Program
Rod Group Alignment Limits
3.1.4 Point
Beach 3.1.4-1 Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206 3.1 REACTIVITY CONTROL SYSTEMS
3.1.4 Rod Group Alignment Limits
LCO 3.1.4 All shutdown and control rods shall be OPERABLE, with individual rod positions within limits.
APPLICABILITY: MODES 1 and 2.
ACTIONS
NOTE--------------------------------------------------- One hour is allowed following rod motion prior to verifying rod operability and group alignment limits.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more rod(s) inoperable.
A.1.1 Verify SDM to be within the limits provided in the COLR.
OR A.1.2 Initiate boration to restore SDM to within limit.
AND A.2 Be in MODE 3.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (continued)
Rod Group Alignment Limits
3.1.4 Point
Beach 3.1.4-2 Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206 ACTIONS (continued) CONDITION REQUIRED ACTION COMPLETION TIME B. One rod not within alignment limits.
B.1 Restore rod to within alignment limits.
OR B.2.1.1 Verify SDM to be within the limits provided in the COLR.
OR B.2.1.2 Initiate boration to restore SDM to within limit.
AND B.2.2 Reduce THERMAL POWER to 75% RTP.
AND B.2.3 Verify SDM to be within the limits provided in the COLR.
AND B.2.4 Perform SR 3.2.1.1 and SR 3.2.1.2.
AND B.2.5 Perform SR 3.2.2.1.
AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />
Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />
(continued)
Rod Group Alignment Limits
3.1.4 Point
Beach 3.1.4-3 Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. (continued)
B.2.6 Re-evaluate safety analyses and confirm results remain valid for duration of operation under these conditions.
5 days C. Required Action and associated Completion Time of Condition B not met. C.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> D. More than one rod not within alignment limit.
D.1.1 Verify SDM to be within the limits provided in the COLR.
OR D.1.2 Initiate boration to restore required SDM to within limit.
AND D.2 Be in MODE 3.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />
Rod Group Alignment Limits
3.1.4 Point
Beach 3.1.4-4 Unit 1 - Amendment No. 212 Unit 2 - Amendment No. 217
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify individual rod positions are within the following alignment limits:
- a. 18 steps of demanded position (as allowed by Table 3.1.4-1) in MODE 1 > 85 percent RTP when bank demand position is < 215 steps;
AND b. 24 steps of demanded position (as allowed by Table 3.1.4-2) in MODE 1 > 85 percent RTP when bank demand position is 215 steps;
AND c. 24 steps of demanded position in MODE 1 85 percent RTP or in MODE 2.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
SR 3.1.4.2 Verify rod freedom of movement (trippability) by moving each rod not fully inserted in the core 10 steps in either direction.
92 days SR 3.1.4.3 Verify rod drop time of each rod, from the fully withdrawn position, is 2.2 seconds from the beginning of decay of stationary gripper coil voltage to dashpot entry, with: a. T avg 500°F; and b. All reactor coolant pumps operating.
Prior to reactor criticality after each removal of the reactor head
Rod Group Alignment Limits
3.1.4 Point
Beach 3.1.4-5 Unit 1 - Amendment No. 212 Unit 2 - Amendment No. 217 Table 3.1.4-1 Allowable Alignment Limits As A Function Of Measured Peaking Factor Margin (F Q (Z), FH N) At Power Levels > 85% Of Rated Power And Bank D Demand < 215 Steps Withdrawn ALIGNMENT LIMITS (STEPS)* REQUIRED MARGIN TO FH NLIMIT (%)
REQUIRED MARGIN TO F Q(Z) LIMIT (%)
12 0.00 0.00 13 0.33 0.83 14 0.67 1.67 15 1.00 2.50 16 1.33 3.33 17 1.67 4.17 18 2.00 5.00
- Between the bank demand position and the RPI System.
Table 3.1.4-2 Allowable Alignment Limits As A Function Of Measured Peaking Factor Margin (F Q (Z), FH N) At Power Levels > 85% Of Rated Power And Bank D Demand 215 Steps Withdrawn ALIGNMENT LIMITS (STEPS)* REQUIRED MARGIN TO FH N LIMIT (%)
REQUIRED MARGIN TO F Q(Z) LIMIT (%)
12 0.00 0.00 13 0.33 0.83 14 0.67 1.67 15 1.00 2.50 16 1.33 3.33 17 1.67 4.17 18 2.00 5.00 19 2.33 5.83 20 2.67 6.67 21 3.00 7.50 22 3.33 8.33 23 3.67 9.17 24 4.00 10.0
- Between the bank demand position and the RPI System.
POINT BEACH NUCLEAR PLANT CSP-ST.0 UNIT 1 CRITICAL SAFETY PROCEDURe SAFETY RELATED Revision 6 11/2011 CRITICAL SAFETY FUNCTION STATUS TREES Page 8 of 11 FIGURE 3 ST-3 HEAT SINK I - TOTAL FEEDWATER FLOW TO SIGs GREATER THAN 230 GPM NO YES . .. ... ..Q GO TO --I
- CSP-H.2 NARROW RANGE LEVEL IN ANY SIG PRESSURE IN BOTH SIGs NO GREATER THAN [51%] 29% NO YES LESS THAN 1105 PSlG YES me*aaa Q ::;:3 NARROW RANGE LEVEL IN BOTH SlGs LESS THAN [85%] 91 % NO YES ....o
- GO CSP-H.4 TO PRESSURE IN BOTH SlGs LESS THAN 1085 PSlG NO YES GO TO 1 1 CSP-H.5 NARROW RANGE LEVEL IN BOTH SGs GREATER THAN [51%] 29% NO YES