|
---|
Category:General FR Notice Comment Letter
MONTHYEARML24262A0102024-09-17017 September 2024 Comment (1) of Victoria K. Anderson on Level 3 Probabilistic Risk Assessment Project Documentation (Volume 7) ML24262A0112024-09-13013 September 2024 Comment (2) of Frances A. Pimentel on Design-Basis Floods for Nuclear Power Plants and Guidance for Assessment of Flooding Hazards Due to Water Control Structure Failures and Incidents ML24234A0892024-08-15015 August 2024 Comment (1) of Mark Richter on Acceptable ASME Section XI Inservice Inspection Code Cases for 10 CFR Part 72 ML24200A1852024-07-17017 July 2024 Comment (1) of Frances A. Pimentel on Draft Regulatory Guides: Design-Basis Floods for Nuclear Power Plants and Guidance for Assessment of Flooding Hazards Due to Water Control Structure Failures and Incidents ML24173A0042024-06-14014 June 2024 Comment (1) of Individual on Draft NUREG: Event Report Guidelines ML24173A0052024-06-14014 June 2024 Comment (2) of Tony Brown on Behalf of Nuclear Energy Institute (NEI) on Draft NUREG: Event Report Guidelines ML24114A0252024-04-0808 April 2024 Comment (4) of Charlotte Shields on DG-5080 Uas Question ML24093A0392024-03-28028 March 2024 Comment (1) of Thomas Basso on Preparing Probabilistic Fracture Mechanics Submittals ML24081A0872024-03-14014 March 2024 Comment of Janet R. Schlueter on Behalf of NEI on Information Collection: Material Control and Accounting of Special Nuclear Material ML24058A0052024-02-23023 February 2024 Comment (5) of Tony Brown on Behalf of Nuclear Energy Institute (NEI) on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 an ML24009A0372023-12-13013 December 2023 Comment (2) of Bruce Montgomery on Draft DUWP-ISG-02, Radiological Survey and Dose Modeling of the Subsurface to Support License Termination ML23353A2442023-12-13013 December 2023 Comment (2) of Bruce Montgomery on Interim Staff Guidance on Subsurface Investigations, Radiological Survey and Dose Modeling of the Subsurface to Support License Termination ML23348A0732023-12-11011 December 2023 Comment (2) of Charlotte Shields on Behalf of Nuclear Energy Institute on Draft Regulatory Guide: Physical Security Event Notifications, Reports, and Records ML23348A0772023-12-11011 December 2023 Comment (1) of Charlotte Shields on Behalf of Nuclear Energy Institute on Draft Regulatory Guide: Preemption Authority, Enhanced Weapons Authority, and Firearms Background Checks ML23349A0442023-12-11011 December 2023 Comment (1) of Charlotte Shields on Draft Regulatory Guide: Suspicious Activity Reports ML23326A1172023-11-21021 November 2023 Comment (1) of Alan Campbell on Proposed Revision to Standard Review Plan Branch Technical Position 7-19, Guidance for Evaluation of Defense-In-Depth and Diversity to Address Common-Cause Failure Due to Latent Design Defects in Digital Safe ML23326A0312023-11-17017 November 2023 Comment (2) of Kati R. Austgen on Draft Regulatory Guide: General Site Suitability Criteria for Nuclear Power Stations ML23284A3892023-10-10010 October 2023 Comment (8) of Ben Holtzman on Guidance for a Technology-Inclusive Content of Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Advanced Reactors ML23270B9552023-09-27027 September 2023 Comment (2) of Stewart Yuen on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses ML23242A0412023-08-25025 August 2023 Comment (2) of Brett Titus on Behalf of NEI on Draft NUREG: Revision to Subsequent License Renewal Guidance Documents, and Supplement to Associated Technical Bases Document ML23236A5292023-08-21021 August 2023 Comment (6) of Bruce S. Montgomery on Draft Interim Staff Guidance: Use of the Decommissioning Trust Fund During Operations for Major Radioactive Component Disposal ML23256A1122023-08-10010 August 2023 Comment (3) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1132023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1152023-08-10010 August 2023 Comment (2) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1162023-08-10010 August 2023 Comment (1) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1192023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1202023-08-10010 August 2023 Comment (2) of Ben Holtzman on Behalf of Nuclear Energy Institute on Draft Interim Staff Guidance: Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications-Roadmap ML23256A1222023-08-10010 August 2023 Comment (5) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1232023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1252023-08-10010 August 2023 Comment (4) of Ben Holtzman on Behalf of Nuclear Energy Institute on Draft Interim Staff Guidance: Review of Risk-Informed, Technology Inclusive Advanced Reactor Applicationsroadmap ML23234A0392023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23181A0292023-06-29029 June 2023 Comment (2) of Rod Mccullum on Draft Regulatory Guide: Weather-Related Administrative Controls at Independent Spent Fuel Storage Installations ML23174A0492023-06-16016 June 2023 Comment (2) of Ben Holtzman on Behalf of Nuclear Energy Institute on Draft Interim Staff Guidance: Review of Risk-Informed, Technology Inclusive Advanced Reactor Applicationsroadmap ML23158A2162023-06-0202 June 2023 Comment (2) of Alan Campbell on Draft Regulatory Guide: Guidelines for Lightning Protection for Production and Utilization Facilities ML23159A2472023-05-22022 May 2023 Comment (4) of William Gross on Perimeter Intrusion Alarm Systems ML23143A1982023-05-18018 May 2023 Comment (1) of Richard Mogavero on Behalf of Nuclear Energy Institute on Draft Regulatory Guide: Cybersecurity Event Notifications ML23130A2082023-05-0808 May 2023 Comment (9) of Mark A. Richter on Behalf of Nuclear Energy Institute on Material Compatibility for Non-Light Water Reactors ML23115A0152023-04-0707 April 2023 Comment (1) of Alan Campbell on Draft Regulatory Guide: Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power Plants ML24120A2702023-04-0404 April 2023 Melody Rodridguez NEI Comment on Controlled Unclassified Information ML23089A0012023-03-28028 March 2023 OMB 3150-0035, NEI Comment on 10 CFR Part 21 Information Collection Renewal 2023 ML23094A0632023-03-28028 March 2023 NRC-2022-0145- NEI Official Comment Attachment on 10 CFR Part 21 Information Collection Renewal ML23115A0172023-03-23023 March 2023 Comment (3) of Alan Campbell on Draft Regulatory Guide: Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power Plants ML23074A0472023-03-14014 March 2023 Comment (2) of A. J. Clore on Perimeter Intrusion Alarm Systems ML22354A2422022-12-19019 December 2022 Comment (4) of Thomas Basso on Behalf of Nuclear Energy Institute on Performance-Based Containment Leak Test Program ML23005A2412022-12-16016 December 2022 Comment (1) of Janet R. Schlueter on Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities ML22244A1732022-08-31031 August 2022 Comment (1) of Tony Brown on Behalf of Nuclear Energy Institute on Industry Comments on Draft Appendices to NUREG/BR-0058, Revision 5, Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission ML22242A0302022-08-29029 August 2022 Comment (1) of Victoria K. Anderson on High Energy Arcing Fault Hazard Frequency and Consequence Modeling ML22231B0532022-08-19019 August 2022 Comment (6) of James E. Slider on Nrc'S Fiscal Years 2023-2027 Artificial Intelligence Strategic Plan ML22230A0402022-08-15015 August 2022 Comment (4) of William R. Gross on Behalf of NEI on Update of Facility Security Clearance ML22224A1942022-08-12012 August 2022 Comment (1) of William R. Gross on Behalf of Nuclear Energy Institute on Personnel Access Authorization Requirements for Non-Immigrant Foreign Nationals Working at Nuclear Power Plants 2024-09-17
[Table view] |
Text
JANET R. SCHLUETER Senior Director, Radiation and Materials Safety 1201 F Street, NW, Suite 1100 Washington, DC 20004 P: 202.739.8098 jrs@nei.org nei.org December 18, 2017 Ms. May Ma Office of Administration U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
~I NUCLEAR ENERGY INSTITUTE r~ F/2. qt7;..1 10/11 IPll/1 (3
Subject:
Industry Comments on Draft "Guidance for the Reviews of Proposed Disposal Procedures and Transfers of Radioactive Material Under 10 CFR Part 20.2002 and 10 CFR 40.13(a) (Docket NRC-2017-0198)
Project Number: 689
Dear Ms. Ma:
On behalf of the Nuclear Energy Institute's (NEI)1 Low Level Waste (LLW) Task Force members, we appreciate the public meetings held on October 19th and November 16th and the opportunity to comment on the subject draft guidance.
We offer the following comment for the U.S. Nuclear Regulatory Commission (NRC) staff's consideration.
Based on our interpretation of the draft guidance and discussions during the November webiria~, we suggest* the draft guide be revised to more clearly articulate when, if ever, an approval under 10 CFR 20.2002 is needed in cases involving licensed radioactive material on or within a licensee's site. Specifically, the document appears internally inconsistent and warrants clarification as to NRC's intent. Specifically, page 7 of the draft guidance states: in practice, 20.2002 ... is most often used for burial of waste in hazardous or solid waste landfills that are permitted under Resource Conservation and Recovery Act (RCRA), but it may be used for a method of alternative disposal not already defined in the regulations such as burial on a licensee's site ... However, page 27 of the draft guidance states: 1 NEI is responsible for establishing unified nuclear industry policy on matters affecting the nuclear energy industry, including regulatory, financial, technical and legislative issues. NEI members include all companies licensed to operate commercial nuclear power plants in the United States, nuclear plant designers, major architect/engineering firms, fuel fabrication facilities, materials licensees, and other organizations and individuals involved in the nuclear energy industry.
NUCLEAR. CLEAN AIR ENERGY SUNSI Review Complete Template = ADM -013 E-RIDS= ADM-03 Add=~~r {J/ttclfl-t.J/
C f1,.G,C{)
Ms. May Ma Dec~mber 18, 2017 Page2 For onsite disposal, no exemption is needed, because the radioactive material is already licensed and remains under license. When the license is terminated, the dose associated with residual radioactivity remaining at the site, including the onsite disposals, will be evaluated to ensure the L TR criteria are met for release of the site. Industry believes that page 7 of the draft guidance is not correct, does not reflect current practice as allowed by NRC, and should be edited to delete the phrase, "such as burial on a licensee's site." Specifically, in 2009, the definition of Residual Radioactivity was added to 10 CFR 20.1003 (62 FR 39087, July 21, 1997): Residual radioactivity means radioactivity in structures, materials, soils, groundwater, and other media at a site resulting from activities under the licensee's control. This includes radioactivity from all licensed and unlicensed sources used by the licensee, but excludes background radiation.
It also includes radioactive materials remaining at the site as a result of routine or accidental releases of radioactive material at the site and previous burials at the site, even if those burials were made in accordance with the provisions of 10 CFR Part 20. Further, as page 27 of the draft guidance states, no exemption is needed for onsite burial since the radioactive material is already licensed and remains on site. Therefore, if the material can be determined to be residual radioactive material as defined in 10 CFR 20.1003 and reasonably expected to meet the criteria for release at the time of license termination, then its burial would not necessitate a 10 CFR 20.2002 application and exemption.
A licensee would maintain records documenting that the residual activity concentrations are expected to be, at the time of license termination, a small fraction of the screening criteria in NUREG 1757 Volume 2, Rev. 1, Appendix H and, therefore, additional regulatory approval for its management in the interim is not needed. The licensee would leave the material in place with complete documentation, e.g., 10 CFR 50.75(g), 10 CFR 70.25(g), 10 CFR 72.30(f).
Not only is this interpretation a reasonable one and adequately protective of public health and safety, it is consistent with industry practice to date and allowed by NRC. Therefore, as stated above, page 7 of the draft guidance should be edited to delete the phrase, "such as burial on a licensee's
_site" such that licensees are not guided to submit a 10 CFR 20.2002 application for onsite burials. We trust you find this comment helpful and we look forward to learning how NRC resolves it. If you have any questions about the content of this letter, please contact me. Sincerely, ~--~ J~ueter . Cc: Gregory F. Suber, NMSS/DUWP Robert L. Gladney, NMSS/DUWP/LLWB Steven Garry, NRR/DRA/ARCB