|
---|
Category:General FR Notice Comment Letter
MONTHYEARML24009A0372023-12-13013 December 2023 Comment (2) of Bruce Montgomery on Draft DUWP-ISG-02, Radiological Survey and Dose Modeling of the Subsurface to Support License Termination ML23353A2442023-12-13013 December 2023 Comment (2) of Bruce Montgomery on Interim Staff Guidance on Subsurface Investigations, Radiological Survey and Dose Modeling of the Subsurface to Support License Termination ML23348A0732023-12-11011 December 2023 Comment (2) of Charlotte Shields on Behalf of Nuclear Energy Institute on Draft Regulatory Guide: Physical Security Event Notifications, Reports, and Records ML23348A0772023-12-11011 December 2023 Comment (1) of Charlotte Shields on Behalf of Nuclear Energy Institute on Draft Regulatory Guide: Preemption Authority, Enhanced Weapons Authority, and Firearms Background Checks ML23349A0442023-12-11011 December 2023 Comment (1) of Charlotte Shields on Draft Regulatory Guide: Suspicious Activity Reports ML23326A1172023-11-21021 November 2023 Comment (1) of Alan Campbell on Proposed Revision to Standard Review Plan Branch Technical Position 7-19, Guidance for Evaluation of Defense-In-Depth and Diversity to Address Common-Cause Failure Due to Latent Design Defects in Digital Safe ML23326A0312023-11-17017 November 2023 Comment (2) of Kati R. Austgen on Draft Regulatory Guide: General Site Suitability Criteria for Nuclear Power Stations ML23284A3892023-10-10010 October 2023 Comment (8) of Ben Holtzman on Guidance for a Technology-Inclusive Content of Application Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Advanced Reactors ML23270B9552023-09-27027 September 2023 Comment (2) of Stewart Yuen on Proposed Revision to Standard Review Plan Section 15.0, Introduction - Transient and Accident Analyses ML23242A0412023-08-25025 August 2023 Comment (2) of Brett Titus on Behalf of NEI on Draft NUREG: Revision to Subsequent License Renewal Guidance Documents, and Supplement to Associated Technical Bases Document ML23236A5292023-08-21021 August 2023 Comment (6) of Bruce S. Montgomery on Draft Interim Staff Guidance: Use of the Decommissioning Trust Fund During Operations for Major Radioactive Component Disposal ML23256A1122023-08-10010 August 2023 Comment (3) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1132023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1152023-08-10010 August 2023 Comment (2) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1162023-08-10010 August 2023 Comment (1) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1192023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1202023-08-10010 August 2023 Comment (2) of Ben Holtzman on Behalf of Nuclear Energy Institute on Draft Interim Staff Guidance: Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications-Roadmap ML23256A1222023-08-10010 August 2023 Comment (5) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1232023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23256A1252023-08-10010 August 2023 Comment (4) of Ben Holtzman on Behalf of Nuclear Energy Institute on Draft Interim Staff Guidance: Review of Risk-Informed, Technology Inclusive Advanced Reactor Applicationsroadmap ML23234A0392023-08-10010 August 2023 Comment (4) of Ben Holtzman on Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap ML23181A0292023-06-29029 June 2023 Comment (2) of Rod Mccullum on Draft Regulatory Guide: Weather-Related Administrative Controls at Independent Spent Fuel Storage Installations ML23174A0492023-06-16016 June 2023 Comment (2) of Ben Holtzman on Behalf of Nuclear Energy Institute on Draft Interim Staff Guidance: Review of Risk-Informed, Technology Inclusive Advanced Reactor Applicationsroadmap ML23158A2162023-06-0202 June 2023 Comment (2) of Alan Campbell on Draft Regulatory Guide: Guidelines for Lightning Protection for Production and Utilization Facilities ML23159A2472023-05-22022 May 2023 Comment (4) of William Gross on Perimeter Intrusion Alarm Systems ML23143A1982023-05-18018 May 2023 Comment (1) of Richard Mogavero on Behalf of Nuclear Energy Institute on Draft Regulatory Guide: Cybersecurity Event Notifications ML23130A2082023-05-0808 May 2023 Comment (9) of Mark A. Richter on Behalf of Nuclear Energy Institute on Material Compatibility for Non-Light Water Reactors ML23115A0152023-04-0707 April 2023 Comment (1) of Alan Campbell on Draft Regulatory Guide: Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power Plants ML23089A0012023-03-28028 March 2023 OMB 3150-0035, NEI Comment on 10 CFR Part 21 Information Collection Renewal 2023 ML23094A0632023-03-28028 March 2023 NRC-2022-0145- NEI Official Comment Attachment on 10 CFR Part 21 Information Collection Renewal ML23115A0172023-03-23023 March 2023 Comment (3) of Alan Campbell on Draft Regulatory Guide: Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power Plants ML23074A0472023-03-14014 March 2023 Comment (2) of A. J. Clore on Perimeter Intrusion Alarm Systems ML22354A2422022-12-19019 December 2022 Comment (4) of Thomas Basso on Behalf of Nuclear Energy Institute on Performance-Based Containment Leak Test Program ML23005A2412022-12-16016 December 2022 Comment (1) of Janet R. Schlueter on Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities ML22244A1732022-08-31031 August 2022 Comment (1) of Tony Brown on Behalf of Nuclear Energy Institute on Industry Comments on Draft Appendices to NUREG/BR-0058, Revision 5, Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission ML22242A0302022-08-29029 August 2022 Comment (1) of Victoria K. Anderson on High Energy Arcing Fault Hazard Frequency and Consequence Modeling ML22231B0532022-08-19019 August 2022 Comment (6) of James E. Slider on Nrc'S Fiscal Years 2023-2027 Artificial Intelligence Strategic Plan ML22230A0402022-08-15015 August 2022 Comment (4) of William R. Gross on Behalf of NEI on Update of Facility Security Clearance ML22224A1942022-08-12012 August 2022 Comment (1) of William R. Gross on Behalf of Nuclear Energy Institute on Personnel Access Authorization Requirements for Non-Immigrant Foreign Nationals Working at Nuclear Power Plants ML22174A0722022-06-21021 June 2022 Comment (11) of Frances A. Pimentel on Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Plants ML22174A3422022-06-21021 June 2022 Comment (2) of Victoria K. Anderson on Level 3 PRA Project Documentation (Volume 3x) ML22165A2082022-06-13013 June 2022 Comment (2) of Victoria K. Anderson on Draft Research Information Letter Reports Determining the Zone of Influence for High Energy Arcing Faults Using Fire Dynamics Simulator, and Predicting High Energy Arcing Fault Zones of Influence for ML22145A2992022-05-23023 May 2022 Comment (2) of Victoria K. Anderson on Acceptability of Probabilistic Risk Assessment Results for Advanced Non-Light Water Reactor Risk-Informed Activities ML22152A0632022-05-23023 May 2022 Comment (1) of Kati R. Austgen on Safety Review of Light-Water Reactor Construction Permit Applications ML22124A0812022-05-0202 May 2022 Comment (3) of Richard Mogavero on Cyber Security Programs for Nuclear Power Reactors ML22124A0792022-05-0202 May 2022 Comment (2) of Richard Mogavero on Cyber Security Programs for Nuclear Power Reactors 2023-09-27
[Table view] |
Text
8/24/23, 8:45 AM blob:https://www.fdms.gov/fc6e03cf-952a-4192-b5c5-688bfac1cde0 SUNSI Review As of: 8/24/23, 8:45 AM Complete Received: August 21, 2023 PUBLIC SUBMISSION Template=ADM-013 E-RIDS=ADM-03 ADD: Shawn Harwell, Status: Pending_Post Tracking No. lll-2ibh-630c Mary Neely Comments Due: August 21, 2023 Comment (6) Submission Type: Web Publication Date:
6/21/2023 Docket: NRC-2023-0111 Citation: 88 FR 40337 Draft Interim Staff Guidance: Use of the Decommissioning Trust Fund During Operations for Major Radioactive Component Disposal Comment On: NRC-2023-0111-0001 Draft Interim Staff Guidance: Use of the Decommissioning Trust Fund During Operations for Major Radioactive Component Disposal Document: NRC-2023-0111-DRAFT-0007 Comment on FR Doc # 2023-13093 Submitter Information Email: atb@nei.org Organization: Nuclear Energy Institute General Comment See attached file(s)
Attachments 08-21-23_NRC_Comments on Draft ISG on Use of DTF blob:https://www.fdms.gov/fc6e03cf-952a-4192-b5c5-688bfac1cde0 1/1
BRUCE S. MONTGOMERY Director Decommissioning and Used Fuel 1201 F Street, NW, Suite 1100 Washington, DC 20004 P: 202.739.8128 bsm@nei.org nei.org August 21, 2023 Office of Administration U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Attn: Program Management, Announcements and Editing Staff
Subject:
Draft Interim Staff Guidance: Use of the Decommissioning Trust Fund During Operations for Major Radioactive Component Disposal (Docket ID NRC-2023-0111)
Project Number: 689 Submitted via Regulations.gov On June 21, 2023, the U.S. Nuclear Regulatory Commission (NRC) issued a notice in the Federal Register soliciting comments on the subject draft interim staff guidance (ISG) document. 1 The Nuclear Energy Institute (NEI) 2 is pleased to provide comments on this draft guidance on behalf of the nuclear energy industry.
NEI agrees with the NRC staffs position on the use of the decommissioning trust fund (DTF) during operations for major radioactive component (MRC) disposal and supports the issuance of guidance on the information that would assist NRCs consideration of licensee requests for exemption from the regulations related to this activity. There are more than 200 MRCs currently being stored onsite at operating reactors around the country. In certain cases, allowing licensees to use the DTF to permanently dispose of these MRCs during operation would significantly reduce the inventory of radioactive waste presently stored at these sites and create efficiencies in the decommissioning process following cessation of operations in the future, without compromising the NRCs reasonable assurance that adequate decommissioning funding will be available when needed.
Clearly, situations have emerged in recent years regarding the size and health of the DTF for some reactor sites that would warrant NRC consideration of exemption requests to allow withdrawals from the DTF for MRC disposal as these reactors continue to operate. While exemption requests are necessarily decided on a 1
88 Fed. Reg. 118,13093 (June 20, 2023) 2 The Nuclear Energy Institute (NEI) is responsible for establishing unified policy on behalf of its members relating to matters affecting the nuclear energy industry, including the regulatory aspects of generic operational and technical issues. NEIs members include entities licensed to operate commercial nuclear power plants in the United States, nuclear plant designers, major architect and engineering firms, fuel cycle facilities, nuclear materials licensees, and other organizations involved in the nuclear energy industry.
August 21, 2023 Page 2 case-by-case basis, the proposed guidance will assist licensees by providing clarity with respect to NRCs expectations when reviewing such requests. NEI encourages NRC to promptly issue this ISG and supports the inclusion of this guidance in RG 1.159, Assuring the Availability of Funds for Decommissioning Nuclear Reactors, as part of the ongoing rulemaking for the transition to decommissioning.
NEI offers the following specific comments on the draft ISG:
The ISG states that removal and replacement of MRCs during the operational phase is a cost of doing business. It is important to note that the disposal of removed MRCs presents a licensee with a choice between expending limited operating funds to dispose of the MRC or store it onsite until the cessation of operations when DTF can be used. In most cases, licensees have chosen to store the MRCs onsite at significant cost savings relative to disposal options so that available funds can be used to support continued safe plant operations. However, onsite storage is not without its costs, so the ability to use the DTF for immediate disposal, if certain circumstances are present, makes sense. Thus, we recommend that the description of the status quo in the ISG focus on explaining the regulations that create the need for an exemption, rather than making more subjective statements characterizing disposal costs (i.e., as a cost of doing business).
The list of information included in the ISG that would assist the NRC staff in evaluating an exemption request should be viewed as a non-exhaustive list of topics that could be useful to the NRC in dispositioning licensee exemption requests. In other words, the list provided in the ISG should not be viewed by the NRC staff (or licensee) as a prescriptive, mandatory list of information that must be included in all exemption requests, nor should it limit consideration of other factors addressed in an individual exemption request that may be relevant to establishing that the requirements of 10 CFR 50.12 have been met in any given case. The information presented by the licensee should be evaluated by NRC to determine if the totality of the facts presented demonstrates that extraordinary circumstances are indeed present supporting issuance of an exemption. 3 Thank you for the opportunity to provide industrys views on this topic. If you have any questions or require additional information, please do not hesitate to contact me.
Sincerely, Bruce S. Montgomery C: John Lubinski, NMSS, NRC Chris Regan, REFS, NMSS Fred Miller, REFS, NMSS Shawn Harwell, REFS, NMSS 3
The draft ISG quotes the NRCs denial of a rulemaking petition in 2008 as establishing a Commission position that withdrawals for the disposal of MRCs would be granted only in extraordinary circumstances (73 Fed. Reg. 62222; Oct. 20, 2008). We view the Commissions statement in that denial as an interpretive statement regarding application of the exemption criteria provided in 10 CFR 50.12 Specific Exemptions, rather than as creating an additional requirement, independent of the well-established criteria provided in section 50.12.