05000400/FIN-2018002-04

From kanterella
Revision as of 17:35, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
04
Site: Harris Duke Energy icon.png
Report IR 05000400/2018002 Section 4OA2
Date counted Jun 30, 2018 (2018Q2)
Type: NCV: Green
cornerstone Initiating Events
Identified by: Self-revealing
Inspection Procedure: IP 71152
Inspectors (proximate) J Zeiler
A Patz
A Butcavage
C Fontana
R Kellner
J Panfel
S Sanchez
J Walker
R Williams
S Rose
Violation of: Technical Specification - Procedures
CCA H.12, Avoid Complacency
INPO aspect QA.4
'