05000397/FIN-2012004-08
From kanterella
Revision as of 14:04, 30 September 2017 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Finding | |
|---|---|
| Title | Failure to Establish Conservative Electronic Dosimeter Alarm Set-points |
| Description | A non-cited violation of Technical Specification 5.4.1a was identified for the failure to follow station procedures and establish conservative electronic dosimeter set-points prior to entering the radiologically controlled area during emergency preparedness exercises and drills. On August 28, 2012, during the emergency preparedness exercise, the licensee used an exercise radiation work permit that established electronic dosimeter set-points of 5 millirem dose and 50 millirem per hour dose rate. As part of the exercise scenario, the inspectors observed Operations Support Center personnel demonstrate the ability to raise electronic dosimeter alarm set-points to 200 millirem dose and 1000 millirem/hour. However, prior to entering the plants actual radiologically-controlled area the licensee failed to re-establish conservative electronic dosimeter set-point values for the entry in accordance with Station Procedure GEN-RPP-02, ALARA Planning and Radiation Work Permits, Revision 29, and Radiation Work Permit 30002943. The inspectors also identified eight additional occurrences of non-conservative dosimeter set-points when entering the radiologically controlled area during previous exercises and drills. The licensee entered this issue into the corrective action program as Action Request AR 269790269790 The finding was more than minor because it was associated with the program and process attribute of the Occupational Radiation Safety Cornerstone and adversely affected the cornerstone objective to ensure the adequate protection of the worker health and safety from exposure to radiation from radioactive material, and if left uncorrected, it would potentially result in unplanned radiation exposure. The inspectors evaluated the finding using Inspection Manual Chapter 0609 Appendix C, Occupational Radiation Safety Significance Determination Process, dated August 19, 2008. The inspectors determined that the finding was of very low safety significance because it did not: (1) involve ALARA planning and work controls; (2) result in an overexposure; (3) involve a substantial potential for overexposure; and (4) compromise the licensees ability to assess dose. In addition, the finding had human performance cross-cutting aspects associated with work control because interdepartmental communication, coordination, and cooperation was necessary to assure plant and human performance. |
| Site: | Columbia |
|---|---|
| Report | IR 05000397/2012004 Section 4OA5 |
| Date counted | Sep 30, 2012 (2012Q3) |
| Type: | NCV: Green |
| cornerstone | Or Safety |
| Identified by: | NRC identified |
| Inspection Procedure: | |
| Inspectors (proximate) | L Ricketson G Guerra C Smith P Elkmann B Tharakan W Walker J Laughlin J Groom M Hayes N Okonkwo N Greene J Dykert E Schrader |
| CCA | H.5, Work Management |
| INPO aspect | WP.1 |
| ' | |
Finding - Columbia - IR 05000397/2012004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Columbia) @ 2012Q3