Pages that link to "05000254/LER-2006-001"
Jump to navigation
Jump to search
The following pages link to 05000254/LER-2006-001:
Displayed 50 items.
- 05000254/LER-1982-034, Forwards LER 82-034/03L-0 (← links)
- 05000254/LER-1976-002, Updated LER 76-002/03L Re Excessive Leakage from Double Gasketed Seal X-4.Initially Reported on 760202.Caused by Equipment Failure & Insufficient Compression.Hatch Bolts Tightened (← links)
- 05000254/LER-1982-039, Forwards LER 82-039/03L-0 (← links)
- 05000254/LER-1995-004, Forwards LER 95-004.Listed Commitments Made,Including Updating Vendor Technical Manual CO099, GE Protective Relays & Accessories (← links)
- 05000254/LER-1994-016, Forwards LER 94-016,Rev 0 for Plant.Licensee Commitments Listed (← links)
- 05000254/LER-1994-015, Forwards LER 94-015-00:on 941002,single Loop Operation in Unanalyzed Condition Occurred (← links)
- 05000254/LER-1983-019, Forwards LER 83-019/03L-0 (← links)
- 05000254/LER-1996-003, Forwards LER 96-003-00 Re Unit 1 Start of Egd Due to Inadequate Procedure (← links)
- 05000254/LER-1994-004, Submits Reproduction of Original Text of LER 94-004 & Suppl Info (← links)
- 05000254/LER-1995-001, Informs of Two Addl Commitments to Be Made Re LER 95-001,rev 0 (← links)
- 05000254/LER-1984-018, :on 840922 & 24,reactor Bldg Fuel Pool Channel B Area Radiation Monitor 1705-16B Spiked High, Tripping Ventilation.Cause Unknown.Corrective Actions for Both Events Will Be Documented in Suppl to LER 84-018 (← links)
- 05000254/LER-1996-013, Forwards LER 96-013,Rev 0 IAW Requirements of 10CFR50.73(a)(2)(i)(B).Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1996-012, Forwards LER 96-012-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items within Component Classification Program & Ensure Resolution of Items.Plan Will Be Completed by 970301 (← links)
- 05000254/LER-1996-011, Forwards LER 96-011-00.Circuit Mods & Procedure Changes Will Be Implemented Prior to Startup & Review of Sample of Assumptions from Safe Shutdown Repts & Calculations Investigated (← links)
- 05000254/LER-1996-015, Forwards LER 96-015-00.Commits to Completion Review of All Pipe Whip & Vibration Restraint Configuations by 961231 (← links)
- 05000254/LER-1996-008, Forwards LER 96-008,Rev 00 & Makes Following Commitment: Procedure Qcts 0600-34 Will Be Revised to Ensure Appropriate Vent Path Exists When Leak Rate Testing 2251(2)-81A/B Panels (← links)
- 05000254/LER-1991-003, Forwards LER 91-003-02.Containment Atmosphere Monitoring Piping & Mark I Support Installation Work Will Be Completed Prior to Startup from Current Forced Outage Q2F41 (← links)
- 05000254/LER-1983-012, Forwards LER 83-012/01T-0 (← links)
- 05000254/LER-1983-010, Forwards LER 83-010/03L-0 (← links)
- 05000254/LER-1982-026, Forwards Revised LER 82-026/03L-2 (← links)
- 05000254/LER-1983-008, Forwards LER 83-008/03L-0 (← links)
- 05000254/LER-1996-022, Submits Corrective Action Plan for LER 96-022-00 Re Inoperable Control Room Emergency Ventilation Sys (← links)
- 05000254/LER-1997-009, Forwards LER 97-009-00 Per 10CFR50.73(a)(2)(v)(D).Commitment Included in Ltr (← links)
- 05000254/LER-1997-014, Forwards LER 97-014-00 Per 10CFR50.73(a)(2)(i)(B).Listed Commitment Made by Ltr (← links)
- 05000254/LER-1997-020, Forwards LER 97-020-00,reporting Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures.No Commitments Being Made by Ltr (← links)
- 05000254/LER-1997-013, Forwards LER 97-013-00 Re Any Single Cause of Inoperable Independent Train or Channel in Single Sys Designed to Remove Residual Heat.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1997-011, Forwards LER 97-011-00 Re an Event or Condition That Alone Could Have Prevented Fulfillment of Safety Function of Structures or Sys That Are Needed to Remove Residual Heat. Commitments Made by Ltr,Submitted (← links)
- 05000254/LER-1997-010, Forwards LER 97-010-00 Which Repts Event That Occurred at Quad Cities Nuclear Station,Per 10CFR50.73(a)(2)(v)(D). Commitment Made by Ltr,Submitted (← links)
- 05000254/LER-1997-005, Forwards LER 97-005-00 IAW Requirements of 10CFR50.73(a)(2)(v)(D) W/Listed Commitments (← links)
- 05000254/LER-1997-003, Forwards LER 97-003-00 IAW 10CFR50.73(a)(2)(v)(B)(D). Procedure Qcap 0307-02, ASME Section XI Repair & Replacement Program Preparation, Attachment a, Section XI Repair/Replacement Program Will Be Revised Re VT-2 (← links)
- 05000254/LER-1997-002, Forwards LER 97-002-00 Documenting Condition That Was Discovered at Quad Cities Nuclear Power Station.Util Commitments Made within Ltr,Listed (← links)
- 05000254/LER-1997-008, Forwards LER 97-008,Rev 00 & Submits Commitments.Revised Qcop 2300-13 Is to Include Steps to Fully Disengage Turning Gear If Necessary for Testing Purposes (← links)
- 05000254/LER-1997-006, Forwards LER 97-006,Rev 00 & Submits Commitments Related to LER (← links)
- 05000254/LER-1996-021, Forwards LER 96-021-00,for Quad Cities Nuclear Power Station.No Commitments Being Made (← links)
- 05000254/LER-1996-025, Forwards LER 96-025-00 Re Operability Calculations Performed on ECCS Suction Strainers W/Incorrect Head Loss Values (← links)
- 05000254/LER-1996-023, Provides Commitments Re LER 96-023.Predefined Model Work Request Which Initiates Perodic Maint Procedure Initiated (← links)
- 05000254/LER-1996-014, Forwards LER 96-014-00.All Personnel Will Be Briefed in Event by 961215,reinforcing Expectations to Initiate Procedure Changes When Needed (← links)
- 05000254/LER-1996-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items (← links)
- 05000254/LER-1996-019, Forwards LER 96-019 IAW Requirements of 10CFR50.73(a)(2)(ii)(B) & Discusses Listed Commitments (← links)
- 05000254/LER-1996-018, Forwards Supplemental Info Re LER 96-018-00,correcting Editorial Error (← links)
- 05000254/LER-1996-020, Forwards LER 96-020-00.Commitments Included in LER & Submitted (← links)
- 05000254/LER-1998-019, Forwards LER 98-019-00,IAW 10CFR50.73(a)(2)(v)(B).Any Other Actions Described in Submittal Represent Intended or Planned Actions by Util.No Commitments Made (← links)
- 05000254/LER-1998-021, Forwards LER 98-021-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made by Util Are Listed (← links)
- 05000254/LER-1998-020, Forwards LER 98-020-00,IAW 10CFR50.73(a)(2)(v)(B). Commitments Made by Util Listed (← links)
- 05000254/LER-1988-001, Sanitized Version of LER 88-001-00:on 880114,records Review Found Two Apparent Overexposures of Contractor Personnel During Fourth Quarter 1980.Caused by Inaccurate Secondary &/ or Primary Dosimetry.Dosimetry Sys Upgraded (← links)
- 05000254/LER-1998-024, Forwards LER 98-024-00 Per 10CFR50.73(a)(2)(i)(B).List of Commitments Made by Util,Provided (← links)
- 05000254/LER-1998-023, Forwards LER 98-023-00 Per 10CFR50.73(a)(2)(v)(D).List of Licensee Commitments,Provided (← links)
- 05000254/LER-1998-022, Forwards LER 98-022-00 for Quad Cities Nuclear Power Station,Unit 1,per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Listed (← links)
- 05000254/LER-1998-003, Forwards LER 98-003-00,which Describes Condition Prohibited by Plant Ts.Commitments Made by Ltr,Listed (← links)
- 05000254/LER-1997-026, Forwards LER 97-026-01,re Event That Took Place at Quad Cities Nuclear Power Station,Unit 1.Commitments Made by Ltr, Listed (← links)