Pages that link to "L-2022-052, Core Operating Limits Report"
Jump to navigation
Jump to search
The following pages link to L-2022-052, Core Operating Limits Report:
Displayed 50 items.
- L-2014-139, Special Report Regarding Accident Monitoring Instrumentation (← links)
- L-2014-105, Inservice Inspection Plan - Fifth Inspection Interval, Unit 3 Relief Request No. 1 - Response to Follow-up Request for Additional Information (← links)
- L-2014-069, Core Operating Limits Report (← links)
- L-2014-100, Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 1 - Response to Request for Additional Information (← links)
- L-2014-096, Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 1 (← links)
- L-2014-065, Special Report - Accident Monitoring Instrumentation (← links)
- L-2014-034, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report (← links)
- L-2014-005, Response to Request for Additional Information and Supplemental Information for Relief Request No. 13 (← links)
- L-2013-296, Relief Request No. 13 (← links)
- L-2013-246, Steam Generator Tube Inspection Report (← links)
- L-2013-227, Extended Power Uprate Cycle 27 Startup Report-Supplement 1 (← links)
- L-2013-226, Extended Power Uprate Cycle 26 Startup Report - Supplement 3 (← links)
- L-2013-219, License Amendment Request No. 225 Regarding One-Time Extension for Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d (← links)
- L-2013-180, Extended Power Uprate Cycle 26 Startup Report - Supplement 2 (← links)
- L-2013-184, Special Report - Accident Monitoring Instrumentation (← links)
- L-2013-140, Special Report - Accident Monitoring Instrumentation (← links)
- L-2013-141, Emergency Response Data System (ERDS) Changes Due to EPU (← links)
- L-2013-132, Errata Corrections to FPL Letter L-2012-451 (← links)
- L-2013-117, Special Report - Accident Monitoring Instrumentation (← links)
- L-2013-024, License Amendment Request No. 225 Regarding One-Time Extension for Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d (← links)
- L-2013-073, Extended Power Uprate Cycle 26 Startup Report, Supplement 1 (← links)
- L-2013-059, Emergency Response Data System Changes Due to Replacement of the Main Steam Line High-Range Noble Gas Effluent Monitor (← links)
- L-2013-032, 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems in Light Water Nuclear Power Reactors, 30 Day Special Report (← links)
- L-2013-034, Core Operating Limits Report for Unit 4 Cycle 27 (← links)
- L-2012-451, Emergency Response Data System Changes Due to Replacement of the Main Steam Line High-Range Noble Gas Effluent Monitor (← links)
- L-2012-435, Inservice Inspection Program Fourth Interval-Third Period-First Refueling Outage Owner'S Activity Report (OAR-1) (← links)
- L-2012-426, Extended Power Uprate Cycle 26 Startup Report (← links)
- L-2012-355, Nuclear Fuel Pellet Thermal Conductivity Degradation Impact on Current Cycle 26 Be LBLOCA Analysis Using the 1996 Cqd Methodology 10 CFR 50.46 30-Day Special Report (← links)
- L-2012-356, Revised Core Operating Limits Report (← links)
- L-2012-330, Response to Request for Additional Information Questions Re Inaccessible End of the Designated Exempt Tendons During Refueling Outage (← links)
- L-2012-332, Emergency Response Data System (ERDS) Maintenance (← links)
- L-2012-318, Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate Amendment 245 and License Condition 3.K.1 on Spent Fuel Pool Cooling System Supplemental Heat Exchanger Structural Design (← links)
- L-2012-179, Response to NRC Request for Additional Information Regarding Extended Power Uprate and Unit 3 License Condition 3.J.1 on Spent Fuel Pool Cooling System Heat Exchange Design (← links)
- L-2012-258, Core Operating Limits Report (← links)
- L-2012-193, Concrete Containment Inservice Inspection Program, Exempt Tendon Inspection Relief Request No.7 (← links)
- L-2012-155, One-Time Exemption Request 10 CFR 26.205(d)(3) - Work Hour Controls (← links)
- L-2012-180, Revised Core Operating Limits Report (← links)
- L-2011-492, Response to Request for Additional Information Regarding the 2010 Steam Generator Tube Inspection (← links)
- L-2011-408, One-Time Exemption Request from Portions of 10 CFR 26.205(d)(3) - Work Hour Controls (← links)
- L-2011-254, Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1) (← links)
- L-2011-119, Submittal of Steam Generator Tube Inspection Report (← links)
- L-2011-146, Plan for Revision of Previously Submitted Information for Generic Letter 2004-02 (← links)
- L-2011-118, Core Operating Limits Report (← links)
- L-2011-102, Response to NRC Request for Additional Information (RAI) Regarding Extended Power Uprate (EPU) License Amendment Request (LAR) No. 205 and Unit 3 Mechanical/Civil Engineering Issues (← links)
- L-2011-019, Cycle 25 Sartup Report (← links)
- L-2010-243, Response to Request for Additional Information Relief Request No. 8, Transfer Canal Drain Line Piping Repair (← links)
- L-2011-042, Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1) (← links)
- L-2010-250, Fourth Inservice Inspection Interval, Relief Request No. 9, Visual Examination of Containment Liner Repair (← links)
- L-2010-230, Core Operating Limits Report (← links)
- L-2010-012, License Amendment Request No. 204, Spent Fuel Pool Criticality Analysis Taking Credit for Boraflex Withdrawal of Application (← links)