Pages that link to "L-PI-10-076, Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 5"
Jump to navigation
Jump to search
The following pages link to L-PI-10-076, Calculation No. GEN-PI-083, Revision 1, Locked Rotor Accident (LRA) Analysis Using AST, Attachment 5:
Displayed 50 items.
- ML093160590 (← links)
- ML093160589 (← links)
- ML093160588 (← links)
- ML093160587 (← links)
- ML093160586 (← links)
- ML093160585 (← links)
- ML093160584 (← links)
- ML083470196 (← links)
- ML083400070 (← links)
- ML083240545 (← links)
- ML17130A971 (← links)
- ML071370298 (← links)
- ML061370098 (← links)
- L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology (← links)
- L-PI-12-010, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term Methodology (← links)
- L-PI-11-099, Response to Requests for Additional Information Regarding Regulatory Guide 1.97 Instrumentation Associated with Adoption of the Alternative Source Term (AST) Methodology (← links)
- L-PI-11-060, Response to Requests for Additional Lnformation (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology (← links)
- L-PI-10-112, Prairie Lsland Nuclear Generating Plant Units 1 and 2, Response to Request for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology (TAC Nos. ME2609 and ME26102) (← links)
- L-PI-10-076 (redirect page) (← links)
- L-PI-10-054, Response to Requests for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology (← links)
- L-PI-10-046, Response to Requests for Additional Lnformation License Amendment Request to Adopt the Alternative Source Term Methodology (← links)
- L-PI-10-041, Response to Requests for Additional Information License Amendment Request to Adopt the Alternative Source Term Methodology (← links)
- L-PI-10-005, Ninety-Day 1R26 Post-Outage Report Pursuant to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal & Containment Spray Systems (← links)
- L-PI-16-058, Special Report: Timely Restoration of Operability of Explosive Gas Monitoring Instrumentation (← links)
- L-PI-16-054, Pressure and Temperature Limits Report, Revision 5 (← links)
- L-PI-16-051, 10 CFR 50.46 Emergency Core Cooling System Annual Report (← links)
- L-PI-16-037, Transmittal of 2015 Annual Radioactive Effluent Report and Offsite Dose Calculation Manual (← links)
- L-PI-15-034, Pressure and Temperature Limits Report (PTLR) Revision 4 (← links)
- L-PI-14-131, Fifth Ten-Year Interval Snubbers Testing Program (← links)
- L-PI-14-072, License Amendment Request (LAR) to Revise the Licensing Basis Analysis for a Waste Gas Decay Tank Rupture (← links)
- L-PI-14-045, Enclosure to L-PI-14-045, Transition Report, Revision 1 (← links)
- L-PI-14-028, PINGP Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident (← links)
- L-PI-13-111, Notification of Alternative Source Term (AST) Implementation and Unit 2 Steam Generator Replacement (← links)
- L-PI-13-080, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- L-PI-12-108, Final Response to NRC Request for Information, Per 10CFR50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- L-PI-12-103, Final Response to NRC Request for Lnformation Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Lnsiqhts from the Fukushima Dai-ichi Accident (← links)
- L-PI-12-082, Response to Requests for Additional Information (RAI) Associated with Adoption of the Alternative Source Term (AST) Methodology (← links)
- L-PI-09-114, License Amendment Request to Adopt the Alternative Source Term Methodology (← links)
- L-PI-09-115, Radtrad and ARCON96 Input and Output Files in Support of License Amendment Request (LAR) to Adopt the Alternative Source Term Methodology (← links)
- L-PI-09-021, 2008 Unit 2 180-Day Steam Generator Tube Inspection Report (← links)
- L-PI-08-090, Stress Analysis Summary Report of Preemptive Structural Weld Overlay for the Unit 2 Pressurizer Surge Nozzle (← links)
- L-PI-08-029, Supplement to License Amendment Request (LAR) to Add a Power Factor to the Emergency Diesel Generators' (EDG) 24-Hour Load Test (Surveillance Requirement 3.8.1.9) (← links)
- L-PI-07-057, Corrections to Emergency Core Cooling System (ECCS) Evaluation Models (← links)
- L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency (← links)
- IR 05000282/2005301 (← links)
- L-PI-05-054, Unit 2 Steam Generator Inspection Results - 15-Day Report (← links)
- ML100840642 (← links)
- ML050980256 (← links)
- L-PI-04-065, FAI/01-86, Rev 1 Gap - User Documentation (← links)
- ML041420518 (← links)