Pages that link to "TSTF-513"
← TSTF-513
Jump to navigation
Jump to search
The following pages link to TSTF-513:
Displayed 50 items.
- TAC:ME6144 (← links)
- TAC:ME6159 (← links)
- TAC:ME6140 (← links)
- TAC:ME5910 (← links)
- TAC:ME1644 (← links)
- ML18142B034 (← links)
- Technical Specifications Task Force (← links)
- ML120030271 (← links)
- ML110560630 (← links)
- ML103480005 (← links)
- ML102170532 (← links)
- ML101810102 (← links)
- ML101340278 (← links)
- ML101340271 (← links)
- ML101340267 (← links)
- ML101030660 (← links)
- ML092460664 (← links)
- ML091330111 (← links)
- ML090890032 (← links)
- ML090130583 (← links)
- ML18192A917 (← links)
- ML17150A350 (← links)
- TSTF-09-24, Technical Specification Task Force Recommended Changes to Be Incorporated in Revision 4 of the Standard Technical Specifications, NUREG-1430 Through 1434 (← links)
- TSTF-09-22, Comment (2) of the Technical Specification Task Force on Proposed Model Safety Evaluation for Plant-Specific Adoption of Technical Specification Task Force Traveler (Tft) 513, Revision 2, Revise PWR Operability Requirements and Actions fo (← links)
- TSTF-10-14, Submittal of TSTF-513, Revision 3 and TSTF-514, Revision 2 (← links)
- TSTF-10-13, Change in Fee Exemption for TSTF-513 & TSTF-514 (← links)
- TSTF-09-03, Transmittal of TSTF-513, Revision 1, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation and TSTF-514, Revision 0, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation (← links)
- EPID:L-2018-LLA-0259 (← links)
- L-2018-178, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 (← links)
- L-2017-077, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 (← links)
- L-2017-038, In-Service Inspection Plans Fourth Ten-Year Interval Unit 1 Relief Request 13 (← links)
- RC-15-0153, Submittal of 10 CFR 50.59 Biennial Report (← links)
- L-2014-360, Inservice Inspection Plan Fourth Ten-Year Interval Relief Request No. 9, Revision 0 (← links)
- L-2014-339, Inservice Inspection Plan - RAI Reply - Third Ten-Year Interval Unit 2 Relief Request No. 14 (← links)
- ONS-2014-105, License Amendment Request for Adoption of Technical Specification Task Force (TSTF) - 513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation; License Amendment Request No. 2011-03 (← links)
- L-2014-124, Technical Specification Bases Control Program Periodic Report of Bases Change TS 6.8.4.j.4 (← links)
- L-2013-232, Inservice Inspection Plan, RAI Reply to Fourth Ten-Year Interval Unit 1 Relief Request No. 5, Revision 0 (← links)
- L-2013-173, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 (← links)
- L-2012-362, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 (← links)
- RC-14-0075, Final Safety Analysis Report (Fsar)/Fire Protection Evaluation Report (Fper) Updated Through June 3, 2014 (← links)
- NL-11-1960, License Amendment Request to Adopt TSTF-513-A Revision 3, Response to Request for Additional Information Regarding Requiring Performance of Reactor Coolant System Mass Balance (← links)
- NRC-2011-0290, Biweekly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations: Fr Publication Date December 27, 2011 (← links)
- NRC-2011-0205, FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11 (← links)
- L-2015-218, Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request No. 10, Revision 0 (← links)
- L-11-139, Request for an Amendment to Revise Both the Plants Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, Using the Consolidated Line Item Improvement Process (← links)
- NL-11-0675, License Amendment Request to Adopt TSTF-513-A, Rev. 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation (← links)
- SBK-L-11066, License Amendment Request 11-01, Application to Revise the Technical Specifications for Reactor Coolant System Leakage Detection Instrumentation (← links)
- L-2011-073, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation (← links)
- AEP-NRC-2018-66, Request for License Amendment to Technical Specification 3.4.15, RCS Leakage Detection Instrumentation, and Application of Leak-Before-Break Methodology (← links)
- AEP-NRC-2011-28, License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-513, Revision 3, Revise PWR Operability Requirements and Action for RCS Leakage Instrumentation (← links)