|
---|
Category:Letter
MONTHYEARML24264A0232024-09-20020 September 2024 RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24249A1482024-09-11011 September 2024 Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements ML24247A3162024-09-0606 September 2024 Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24222A4002024-08-14014 August 2024 TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter ML24106A2762024-08-0101 August 2024 Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207) ML24207A1822024-07-25025 July 2024 TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter ML24114A2652024-04-24024 April 2024 TSTF-597 Acceptance Review Letter ML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, 'Extend Shield Building Completion Time After Refueling' ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19176A1892019-08-14014 August 2019 Cover Letter Transmitting Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition 2024-09-06
[Table view] |
Text
March 27, 2009 Technical Specifications Task Force (TSTF) 11921 Rockville Pike, Suite 100 Rockville, Maryland 20852
Dear Members of the TSTF:
On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your February 18, 2009, letter requesting a fee exemption under 10 CFR 170.11(a)(1)(iii) for all fees associated with the NRCs review of TSTF-513, Revise [Pressurized Water Reactors] PWR Operability Requirements and Actions for [Reactor Coolant System] RCS Leakage Instrumentation, and TSTF-514, Revise [Boiling Water Reactors] BWR Operability Requirements and Actions for RCS Leakage Instrumentation. Your request meets the fee exemption criteria; therefore, I have granted your request, as explained below.
Your fee exemption request states that TSTF-513 and TSTF-514 (hereinafter referred to as Travelers) are a means for exchanging information for the purpose of supporting the NRCs generic regulatory improvements related to the resolution of containment atmosphere gaseous radioactivity monitor operability. The NRC staff has reviewed your submittals and concluded that these Travelers address the issue of operability requirements for leakage detection by gaseous radiation monitors, as described in Regulatory Issues Summary (RIS) 2009-2, Use of Containment Atmosphere Gaseous Radioactivity Monitors for Reactor Coolant System Leakage Detection Equipment at Nuclear Power Reactors, dated January 29, 2009. Upon approval, the NRC plans to use the Travelers as part of the guidance on NRCs exercise of enforcement discretion involving inoperable containment atmosphere gaseous radioactivity monitoring systems. Hence, I am able to grant you a fee exemption under the provisions of 10 CFR 170.11(a)(1)(iii).
If you have any technical questions regarding this matter, please contact Joseph Williams at 301-415-1470. Please contact Glenda Somerville of my staff at 301-415-8139, for any fee-related questions.
Sincerely,
/RA/
J. E. Dyer Chief Financial Officer cc: K. Schrader, PWROG J. Messina, BWROG T. Raidy, PWROG R. Gambrell, PWROG
March 27, 2009 Technical Specifications Task Force (TSTF) 11921 Rockville Pike, Suite 100 Rockville, Maryland 20852
Dear Members of the TSTF:
On behalf of the U.S. Nuclear Regulatory Commission (NRC), I am responding to your February 18, 2009, letter requesting a fee exemption under 10 CFR 170.11(a)(1)(iii) for all fees associated with the NRCs review of TSTF-513, Revise [Pressurized Water Reactors] PWR Operability Requirements and Actions for [Reactor Coolant System] RCS Leakage Instrumentation, and TSTF-514, Revise [Boiling Water Reactors] BWR Operability Requirements and Actions for RCS Leakage Instrumentation. Your request meets the fee exemption criteria; therefore, I have granted your request, as explained below.
Your fee exemption request states that TSTF-513 and TSTF-514 (hereinafter referred to as Travelers) are a means for exchanging information for the purpose of supporting the NRCs generic regulatory improvements related to the resolution of containment atmosphere gaseous radioactivity monitor operability. The NRC staff has reviewed your submittals and concluded that these Travelers address the issue of operability requirements for leakage detection by gaseous radiation monitors, as described in Regulatory Issues Summary (RIS) 2009-2, Use of Containment Atmosphere Gaseous Radioactivity Monitors for Reactor Coolant System Leakage Detection Equipment at Nuclear Power Reactors, dated January 29, 2009. Upon approval, the NRC plans to use the Travelers as part of the guidance on NRCs exercise of enforcement discretion involving inoperable containment atmosphere gaseous radioactivity monitoring systems. Hence, I am able to grant you a fee exemption under the provisions of 10 CFR 170.11(a)(1)(iii).
If you have any technical questions regarding this matter, please contact Joseph Williams at 301-415-1470. Please contact Glenda Somerville of my staff at 301-415-8139, for any fee-related questions.
Sincerely,
/RA/
J. E. Dyer Chief Financial Officer cc: K. Schrader, PWROG J. Messina, BWROG T. Raidy, PWROG R. Gambrell, PWROG Distribution:
OCFO R/F OCFO/DOC R/F OCFO (2009-069 closes)
R. Erickson, OCFO M. Moore, OCFO DFM (DFM-9-013 closes)
M. Williams, OCFO J. Williams, NRR/DPR/PSPB RElliott, NRR, MHamm, NRR KBoucholtz,NRR ADAMS Yes No Publicly Available Non-Sensitive DOCUMENT NAME: G:\DFM\Fee Policy Group\Fee policy\Fee waivers\TSTF-513 and 514 Fee waiver.doc To receive a copy of this document, indicate in the box:
C = Copy without attachment/enclosure E = Copy with attachment/enclosure N = No copy.
- see previous concurrence **concurred via email OFFICE OFCO/DOC OCFO/DOC NRR OCFO/DOC DCFO CFO NAME GSomerville* TGrancorvitz* TMcGinty** CRheaume MBrown JEDyer /RA/
DATE 3/24/09 3/26/09 3/26/09 3/ /09 3/27/09 3/27/09