Agenda for TSTF/NRC Meeting July 15, 2010 8:30 a.m. - 4:00 p.m.

I. Administrative A. Introductions B. Agenda Review C. Other Administrative Issues II. Discussion of Development of ISTS Revision 4 A. Unresolved questions needed to complete Rev. 4 typing:

1. NRC comments on TSTF-494-T
2. Bases for TSTF-425
3. Identification of Travelers with conditions and limitations that should be captured in Reviewers Notes in Revision 4.

III. Process Issues A. Status of NRC letter concerning RG 1.174 Tier 2 requirements B. Discussion of Traveler review process IV. Traveler Review Status A. Initiative 1 Travelers (TSTF-422, TSTF-423, TSTF-431, and TSTF-432)

1. TSTF-432 RAIs (6/2/10 status call)

B. TSTF-426, "Revise or Add Actions to Preclude Entry into LCO 3.0.3 - RITSTF Initiatives 6b & 6c"

1. Awaiting NRC comments on proposed Bases changes C. TSTF-446, "Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791)"
1. Status of Notice of Availability D. TSTF-500, "DC Electrical Rewrite - Update to TSTF-360"
1. NRC response to TSTF comment to revise and republish the model application E. TSTF-505, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b"
1. NRC requested discussion of comments F. TSTF-508, "Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation"
1. Status of Notice of Availability (comments provided by TSTF on 11/6/09)

G. TSTF-510, "Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection" H. TSTF-513, "Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation" and TSTF-514, "Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation"

1. NRC response to TSTF letter on fee exemption I. TSTF-515, "Revise Post-Accident Monitoring Instrumentation based on Reg Guide 1.97, Rev. 4 and NEDO-33349" J. TSTF-521, "Exclusion of Time Constants from Channel Operation Tests in Specifications 3.3.1 and 3.3.2" K. TSTF-522, "Revise Ventilation System Surveillance Requirements to Operate for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> per Month" L. TSTF-523, "Generic Letter 2008-01, Managing Gas Accumulation" V. Issues with Previously Approved Travelers A. TSTF-493, Clarify Application of Setpoint Methodology for LSSS Functions
1. Awaiting NRC input on NRC/Industry workshop topics on TSTF-493 B. TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
1. Discussion of potential NRC reversal of position C. Discussion of industry white paper provided at the January 28, 2010 public meeting on TSTF-363-A, TSTF-408-A, and TSTF-419-A.
1. Implication of NRC approval of ANO LAR on 5/25/10 to revise COLR list
2. Request for NRC to document any other concerns with TSTF-363, 408, or 419, or to document resolution of concerns.

D. Removal of TSTF-439-A, "Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO" from list of questioned Travelers.

1. NRC about to approve for Peach Bottom.

E. Plant-Specific Bases Changes for TSTF-425-A, "Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b."

F. NRC RAIs on plant-specific adoption of TSTF-372-A, "Addition of LCO 3.0.8, Inoperability of Snubbers" VI. Technical Issues A. April 19, 2010, Clinton TIA on SR 3.0.3 Application to the IST Program B. Discussion of March 31, 2010, TSTF Letter Regarding Required Action Completion C. Discussion of need for clarification of performing common mode failure evaluation in TS 3.8.1.

D. NRC questions on TSTF-283, "Modify Section 3.8 Mode restriction Notes," SRs 3.8.4.3 and 3.8.6.6.

E. TSTF feedback on NRC suggestion of a possible TSTF Traveler to provide a uniform and consistent approach to thermal power limits.

VII. Future Planning A. Consideration of expanding the end-state initiative Travelers to Hot Standby (Mode 3 for PWRs)

VIII. Designated time for public comments IX. Future Meetings in 2010 & Closing Remarks A. November 5, 2010 X. Adjourn