Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20073H335 | 31 December 1990 | Annual Environ Monitoring Rept (Nonradiological) | Zebra Mussel |
ML20073H448 | 28 February 1974 | Ecological Survey of Delaware River in Vicinity of Point Pleasant,Pa Jul 1972 - Dec 1973 | |
ML20073R154 | 31 December 1987 | Revised Recorded Annual Whole Body Exposures, 1987 | |
ML20073R156 | 31 December 1988 | Revised Recorded Annual Whole Body Exposures, 1988 | |
ML20073R159 | 31 December 1989 | Revised Recorded Annual Whole Body Exposures, 1989 | |
ML20073R163 | 31 December 1990 | Revised Recorded Annual Whole Body Exposures, 1990 | |
ML20073S299 | 31 August 1982 | Environ Assessment Rept & Findings,Point Pleasant Water Supply Project | |
ML20074A717 | 30 April 1983 | Rev 12 to Environ Rept - OL Stage.One Oversize Drawing Encl. Aperture Card Available in PDR | Ultimate heat sink Probabilistic Risk Assessment Earthquake Turbine Missile Fuel cladding Fatality |
ML20076E688 | 31 May 1983 | Rev 13 to Environ Rept.Environ Qualification Rept for safety-related Equipment Encl | Safe Shutdown Anticipated operational occurrence |
ML20076G984 | 31 August 1983 | Rev 15 to Environ Rept - OL Stage | Anticipated operational occurrence |
ML20076N296 | 31 December 1990 | Annual Radiological Environ Operating Rept 7 | |
ML20077D870 | 17 May 1991 | NPDES Noncompliance Notification:On 910512,cooling Tower Experienced Failure,Causing Large Vol of Cooling Tower Water to Bypass Normal Blowdown Discharge Pathway.Cooling Tower Will Be Inspected During mid-yr Outage | |
ML20077F627 | 29 July 1983 | Rev 14 to Environ Rept - OL Stage | |
ML20077G577 | 20 June 1991 | NPDES Noncompliance Notification:On 910528,chiller C at Bedminster Water Processing Facility Tripped Due to High Vibration & Temp at Discharge 001 Exceeding Permitted Instantaneous Temp.Discharge Temp Setpoint Lowered | |
ML20080N106 | 31 December 1994 | Annual Effluent Release Rept 20 Jan-Dec 1994 PECO Energy LGS Units 1 & 2 | Grab sample Offsite Dose Calculation Manual |
ML20080N112 | 31 December 1994 | Tower 1 Joint Frequency Distributions of Wind Speed & Direction by Atmospheric Stability Class 1994 Rept 10 | |
ML20080U358 | 29 February 1984 | Rev 17 to Environ Rept - OL Stage | |
ML20082H692 | 31 December 1989 | Addendum to Dec 1989 Rept Entitled, Point Pleasant Pumping Facilities Operational Environ Noise Assessment | |
ML20082H697 | 31 December 1989 | Point Pleasant Pumping Facilities Operational Environ Noise Assessment | |
ML20082H710 | 31 March 1991 | Final Rept, Bradshaw Reservoir Pumping Facilities Environ Noise Assessment | |
ML20082H742 | 28 February 1991 | Final Rept, Limerick Generating Station Environ Noise Assessment, Parts 1 & 2 | |
ML20082L987 | 28 August 1991 | NPDES Noncompliance Notification:On 910707 & 19,electrical Storm Caused Loss of Power to Bedminster Water Processing Facility & Tripped Chillers.On 910721,discharge Temp Exceeded Permitted Limits.Permit Limits Changed | |
ML20082N006 | 30 June 1991 | Semiannual Effluent Release Rept,Jan-June 1991 | Process Control Program |
ML20082N506 | 31 December 1994 | Annual Environ Operating Rept | Zebra Mussel |
ML20083D906 | 31 August 1991 | NPDES Discharge Monitoring Repts for Aug 1991 | NJPDES |
ML20084P335 | 15 May 1984 | Meteorological Tower 1 Data for 831015-840415 | |
ML20086E498 | 22 November 1991 | NPDES Noncompliance Notification:On 911016 Underground Fire Water Pipeline Inadvertently Punctured by Contractor Backhoe Ram During Excavation of Trench.Caused by Inadequate Review of Required Prints.Backhoe Ram Operator Terminated | |
ML20086G382 | 31 December 1983 | Rev 16 to Environ Rept | |
ML20087H723 | 31 December 1994 | Annual Radiological Environ Operating Rept 11 for Jan-Dec 1994 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
ML20091H260 | 31 May 1984 | Draft Environ Protection Plan (Nonradiological) for Facility,App B to CPPR-106 & CPPR-107 | |
ML20091Q430 | 23 January 1992 | NPDES Noncompliance Notification:On 911218 Cooling Tower Blowdown Water Discharged to Possum Hollow Creek Resulting in Unpermitted Discharge Due to Failure to Identify & Revise All Appropriate Procedures.Procedure GP-3 to Be Revised | |
ML20092N553 | 30 June 1984 | Rev 18 to Environ Rept - OL Stage | |
ML20093N641 | 31 July 1984 | Rev 19 to Environ Rept - OL Stage | |
ML20094G889 | 31 December 1991 | Semiannual Effluent Release Rept 15,Jul-Dec 1991 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20094G893 | 31 December 1991 | Annual Tower 1 Joint Frequency Distributions of Wind Speed & Direction by Atmospheric Stability Class 1991 Rept 7 | |
ML20094H034 | 31 December 1991 | Std Format for Reporting Number of Personnel & Man-Rem by Work & Job Function for Period Jan-Dec 1991 | |
ML20095E772 | 31 December 1991 | Annual Environ Operating Rept (Nonradiological) | Zebra Mussel |
ML20095H869 | 31 December 1991 | Annual Radiological Environ Operating Rept for 1991,Rept 8 | Annual Radiological Environmental Operating Report Chernobyl |
ML20095J120 | 23 April 1992 | NPDES Noncompliance Notification:On 920322,cooling Tower Blowdown Water Discharged Into Possum Hollow Creek.Caused by Procedure Deficiency.Sys Operating Procedure S09.4.A Expected to Be Revised by 920501 | |
ML20098E902 | 30 September 1984 | Rev 20 to Environ Rept - OL Stage | |
ML20100L886 | 31 December 1995 | Annual Effluent Release Rept 21,Jan-Dec 1995 | Offsite Dose Calculation Manual Process Control Program |
ML20100L896 | 31 December 1995 | Tower 1 Joint Frequency Distributions of Wind Speed & Direction by Atmospheric Stability Class 1995 Rept 11 | |
ML20100P631 | 28 February 1996 | NPDES Noncompliance Notification:On 951108,discharge 001 Net TSS in Excess of Maximum Daily Limit.Caused by Flaw in Methodology to Calculate Net TSS concentration.Follow-up Composite Samples Taken | Grab sample |
ML20101H532 | 26 June 1992 | NPDES Noncompliance Notification:On 920504,crack Discovered on Above Ground Cleanout for Sewage Line Leading from Plant Training Ctr to Plant Sewage Sys Holding Tanks.Caused by Expansion of Sewage Spill Line.Clamps Installed | |
ML20101K466 | 28 March 1996 | NPDES Noncompliance Notification:On 960218,discovered That No Records Existed for Bradshae Reservoir Discharge Water Temp for Listed Time Periods.Caused by Temporary Reassigment of Personnel.Review of Staffing in Progress | |
ML20106H264 | 30 September 1984 | Draft 6 of Union Township,Berks County,Radiological Emergency Response Plan for Incidents at Limerick Generating Station. Related Correspondence | |
ML20108A367 | 28 April 1996 | NPDES Noncompliance Notification:On 960314,personnel Observed Sewage Overflowing from MH-07 & Into Storm Drain W-4.Caused by Blockage of Pipe Section Between MH-07 & MH-08.Sewer Contract Svc Pressure Cleaned | |
ML20108A380 | 28 April 1996 | NPDES Noncompliance Notification:On 960223,identified Seven Issues of Administrative non-compliance/ambiguity W/Permits. Caused by Inadequate Administration.Individuals Gained Better Understanding W/Guidance | |
ML20108B739 | 31 December 1995 | Annual Radiological Environ Operating Rept 12 Jan-Dec 1995 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl |
ML20108C928 | 31 December 1995 | LGS Units 1 & 2 1995 Annual Environ Operating Rept (Non- Radiological) Jan-Dec 1995 |