Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
CNL-14-094, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, 2.5-4, 3.0.3-1-3 Request 4c, and B.1.13-4a13 June 2014Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, 2.5-4, 3.0.3-1-3 Request 4c, and B.1.13-4aBoric Acid
High Radiation Area
Fire Barrier
Weld Overlay
Coatings
Aging Management
Moisture barrier
Earthquake
Biofouling
Offsite Circuit
Fire Protection Program
CNL-14-102, Resolution of Generic Safety Issue (GSI)-191 - Commitment Change20 June 2014Resolution of Generic Safety Issue (GSI)-191 - Commitment Change
CNL-14-109, Submittal Extension to the Fifth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request27 June 2014Submittal Extension to the Fifth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension RequestFukushima Dai-Ichi
CNL-14-110, Submittal Extension to the Fifth Progress Update on Improved Flood Mitigation System Project27 June 2014Submittal Extension to the Fifth Progress Update on Improved Flood Mitigation System Project
CNL-14-114, Resolution of Generic Safety Issue (GSI)-19127 June 2014Resolution of Generic Safety Issue (GSI)-191Fuel cladding
CNL-14-119, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - July 2014 Status Report31 July 2014the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - July 2014 Status ReportCommercial Grade Dedication
CNL-14-123, Brown Ferry Units 1, 2 & 3, Sequoyah Units 1 & 2 and Watts Bar Unit 1 - Submittal of Revision 59 to Emergency Plan Implementing Procedure CECC EPIP-1, Central Emergency Control Center (CECC) Operations.26 August 2014Brown Ferry Units 1, 2 & 3, Sequoyah Units 1 & 2 and Watts Bar Unit 1 - Submittal of Revision 59 to Emergency Plan Implementing Procedure CECC EPIP-1, Central Emergency Control Center (CECC) Operations.
CNL-14-130, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant28 August 2014Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear PlantSpent Fuel Pool Instrumentation
CNL-14-133, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)(TAC Nos..28 August 2014Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)(TAC Nos..Boric Acid
Shutdown Margin
FLEX
Earthquake
CNL-14-135, Central Emergency Control Center - Central Emergency Control Center (CECC) Operations Procedure Revision22 August 2014Central Emergency Control Center - Central Emergency Control Center (CECC) Operations Procedure Revision
CNL-14-162, Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 & 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A29 August 2014Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 & 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-AFitness for Duty
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Coatings
Nondestructive Examination
B.5.b
Process Control Program
Fire Protection Program
Grace period
CNL-14-176, Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03)2 December 2014Application to Revise Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program, (SQN-TS-14-03)Safe Shutdown
High winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
Coatings
Large early release frequency
Moisture barrier
License Renewal
Earthquake
CNL-14-181, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Set 22, B.1.34-9c22 October 2014Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Set 22, B.1.34-9cBoric Acid
High Radiation Area
Fire Barrier
Weld Overlay
Coatings
Aging Management
Moisture barrier
Earthquake
Biofouling
EVT-1
Fire Protection Program
CNL-14-195, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2014 Status Report31 October 2014the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - October 2014 Status ReportCommercial Grade Dedication
CNL-14-209, Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revisions5 November 2014Submittal of Central Emergency Control Center - Emergency Plan Implementing Procedure Revisions
CNL-14-211, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.22 December 2014Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.Safe Shutdown
Boric Acid
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Power Operated Valves
CNL-14-221, Response to NRC Request for Additional Information Regarding Review of License Renewal Application, Set 23, B.1.34-9.d (Follow Up)11 December 2014Response to NRC Request for Additional Information Regarding Review of License Renewal Application, Set 23, B.1.34-9.d (Follow Up)Boric Acid
High Radiation Area
Fire Barrier
Weld Overlay
Coatings
Aging Management
Moisture barrier
Earthquake
Biofouling
EVT-1
Fire Protection Program
CNL-14-223, TVA - Seventh Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request17 December 2014TVA - Seventh Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension RequestFukushima Dai-Ichi
CNL-14-226, Organization Topical Report, TVA-NPOD89-A13 February 2015Organization Topical Report, TVA-NPOD89-AFire Protection Program
CNL-14-229, American Society of Mechanical Engineers Request for Relief RP-0731 December 2014American Society of Mechanical Engineers Request for Relief RP-07Boric Acid
CNL-14-231, Notification of Intent to Use Code Case N-716-122 December 2014Notification of Intent to Use Code Case N-716-1
CNL-14-234, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 116 December 2014Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 1Recently irradiated fuel
CNL-15-015, Service List Update for Routine Information16 April 2015Service List Update for Routine Information
CNL-15-016, Service List Update for Documents Containing Official Use Only and Safeguards Information16 April 2015Service List Update for Documents Containing Official Use Only and Safeguards Information
CNL-15-017, Decommissioning Funding Status Report31 March 2015Decommissioning Funding Status Report
CNL-15-018, Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2015 Status Report30 January 2015Nuclear Power Group Commercial Grade Dedication Recovery Project - January 2015 Status ReportCommercial Grade Dedication
CNL-15-020, Supplement to the Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) and Response to NRC Requests for Additional Information10 April 2015Supplement to the Application to Modify Ice Condenser Technical Specifications to Address Revisions in Westinghouse Mass and Energy Release Calculation (SQN-TS-12-04) and Response to NRC Requests for Additional InformationDesign basis earthquake
Fuel cladding
CNL-15-037, Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)27 February 2015Fourth Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Time to boil
Emergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Earthquake
CNL-15-038, Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2015Fourth Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
CNL-15-042, Flood Hazard Reevaluation Report for Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review.12 March 2015Flood Hazard Reevaluation Report for Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review.Safe Shutdown
Ultimate heat sink
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Moisture barrier
Earthquake
CNL-15-051, Guarantee of Payment of Deferred Premiums - 2014 Annual Report7 April 2015Guarantee of Payment of Deferred Premiums - 2014 Annual Report
CNL-15-052, Annual Insurance Status Report1 April 2015Annual Insurance Status Report
CNL-15-058, Fifth Status Update of Planned Actions to Facilitate Maintenance of 6.9 Kilovolt and 480 Volt Shutdown Boards at Sequoyah, Units 1 and 227 March 2015Fifth Status Update of Planned Actions to Facilitate Maintenance of 6.9 Kilovolt and 480 Volt Shutdown Boards at Sequoyah, Units 1 and 2
CNL-15-059, Response to NRC Request for Additional Information Regarding the Review Related to License Amendment Request to Revise Technical Specification on Ultimate Heat Sink, Including Enclosures 1 and 2, Pp. 1 Through 20619 June 2015Response to NRC Request for Additional Information Regarding the Review Related to License Amendment Request to Revise Technical Specification on Ultimate Heat Sink, Including Enclosures 1 and 2, Pp. 1 Through 206Ultimate heat sink
CNL-15-065, Request for Schedule Relaxation from NRC Order EA-12-049, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design External Event2 April 2015Request for Schedule Relaxation from NRC Order EA-12-049, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design External EventUltimate heat sink
FLEX
CNL-15-066, Eighth Progress Update on Improved Flood Mitigation System Project30 March 2015Eighth Progress Update on Improved Flood Mitigation System Project
CNL-15-067, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation15 July 2015Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool InstrumentationSafe Shutdown Earthquake
Operating Basis Earthquake
FLEX
Design basis earthquake
Spent Fuel Pool Instrumentation
Earthquake
CNL-15-082, Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2015 Status Report30 April 2015Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - April 2015 Status ReportCommercial Grade Dedication
CNL-15-095, Revision to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule for License Renewal14 May 2015Revision to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule for License Renewal
CNL-15-098, Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor10 July 2015Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 ReactorAging Management
CNL-15-106, 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information8 July 20153, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information
CNL-15-107, Service List Update for Documents Containing Official Use Only and Safeguards Information10 November 2015Service List Update for Documents Containing Official Use Only and Safeguards Information
CNL-15-116, Ninth Progress Update on Improved Flood Mitigation System Project30 June 2015Ninth Progress Update on Improved Flood Mitigation System Project
CNL-15-136, Response to NRC Request for Additional Information Regarding ASME Request for Relief RP-0722 July 2015Response to NRC Request for Additional Information Regarding ASME Request for Relief RP-07
CNL-15-138, Tennessee Valley Authority Nuclear Power Group Response to NRC Regulatory Issue Summary 2014-13 Planned Licensing Action Submittals for All Power Reactor Licensees28 August 2015Tennessee Valley Authority Nuclear Power Group Response to NRC Regulatory Issue Summary 2014-13 Planned Licensing Action Submittals for All Power Reactor Licensees
CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report31 July 2015the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure ReportCommercial Grade Dedication
CNL-15-146, Response to NRC Request for Information Regarding the Review of the License Renewal Application, Set 25 (TAC Nos. MF0481 and MF0482)3 August 2015Response to NRC Request for Information Regarding the Review of the License Renewal Application, Set 25 (TAC Nos. MF0481 and MF0482)Aging Management
Foreign Material Exclusion
CNL-15-156, Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 924 July 2015Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9Safe Shutdown
Shutdown Margin
Anticipated operational occurrence
Post Accident Monitoring
Abnormal operational transient
Surveillance Frequency Control Program
CNL-15-158, Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor.3 August 2015Supplement to TVA Letter, Sequoyah Nuclear Plant - Revision to Commitment No. 28 and Review of Impacts to the SQN Reactor Vessel Internals Aging Management Program Due to Dislodged Reactor Vessel Surveillance Capsules in Unit 1 Reactor.Aging Management
CNL-15-163, Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions5 August 2015Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Proposed License Conditions