CNL-14-102, Resolution of Generic Safety Issue (GSI)-191 - Commitment Change
| ML14175A546 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 06/20/2014 |
| From: | James Shea Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CNL-14-102, GSI-191 | |
| Download: ML14175A546 (2) | |
Text
L44 140620 002 Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-1 02 June 20, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 10 CFR 50.54(f)
Subject:
Sequoyah Nuclear Plant, Units 1 and 2 - Resolution of Generic Safety Issue (GSI)-191 -Commitment Change
Reference:
TVA letter to NRC, "Sequoyah Nuclear Plant, Units 1 and 2-Path Forward for Resolution of Generic Safety Issue (GSI)-191," dated May 16, 2013.
In the reference letter, TVA committed to complete the review of the Safety Evaluation Report and document adherence to the Limitations and Conditions contained in Section 4.0 in the appropriate TVA calculations and design documents and to submit the results of this effort to NRC by June 20, 2014.
TVA is currently finalizing the administrative review of these results. The results will therefore be submitted to NRC by June 27, 2014.
There are no new commitments made in this submittal.
If you have any questions concerning this submittal, please contact Russell Thompson at (423) 751-2567.
I declare under penalty of perjury that the foregoing is true and accurate. Executed on this 20th day of June 2014.
ea resident, Nuclear Licensing cc: See Page 2