ML20084B456 | 10 April 1984 | Failure Analysis,Cracked Containers,Lead-Acid Storage Batteries | |
ML20084B593 | 26 October 1972 | Special Rept 5 Torus Ring Header Support Failure | Liquid penetrant |
ML20084C740 | 22 November 1967 | Title Page to Status Rept:Reactor Vessel Repair Program | |
ML20084E542 | 30 April 1984 | Emergency Diesel Generator Engine & Auxiliary Module Wiring & Termination Qualification to IEEE-383-1974 | |
ML20084K323 | 11 December 1970 | Preliminary Draft of Containment Dome Rept | |
ML20084K350 | 2 October 1970 | Interim Rept, Containment Dome Concrete Investigation | Grab sample |
ML20086L021 | 2 February 1984 | Detailed Control Room Design Review Summary Rept for Snupps, in Response to Generic Ltr 82-33,NUREG-0737, Suppl 1 | Boric Acid |
ML20086P892 | 17 August 1981 | Comments Re Igniters in Upper Plenum of Ice Condenser of Sequoyah & McGuire Nuclar Power Plants, Prepared for ACRS Subcommittee on Class 9 Accidents | |
ML20086S222 | 27 February 1984 | Investigation of Types AF & Ae Piston Skirts | Hydrostatic Nondestructive Examination Finite Element Analysis |
ML20087F890 | 30 June 1983 | Steam Pressure Suppression Characteristics of Water-Soluble Plastic Membrane Shielded Ice for Ice Condenser Containment Nuclear Power Plants. Supporting Documentation Encl | Boric Acid Safe Shutdown Earthquake B.5.b |
ML20087L351 | 31 March 1984 | Emergency Diesel Generator Air Start Valve Capscrew Dimension & Stress Analysis, Prepared for Transamerica Delaval,Inc (Tdi) Diesel Generator Owners Group | |
ML20090D479 | 10 May 1972 | Torus Insp & Analysis of Effect on Relief Valves Blowdown Forces on Torus Baffles | |
ML20090G673 | 30 April 1984 | Nuclear Physics Methodology for Reload Design | |
ML20091J056 | 1 June 1984 | Diesel Engine 1A Component Revalidation Insp Rept | Breakaway torque Liquid penetrant |
ML20091L753 | 30 June 1984 | Suppl to Emergency Diesel Generator Auxiliary Module Control Wiring & Termination Qualification Review for Tdi Generators | |
ML20091M520 | 22 May 1984 | Draft Final Rept, Evaluation of Emergency Diesel Generator Crankshafts at Shoreham & Grand Gulf, Prepared for Tdi Diesel Generator Owners Group | Finite Element Analysis |
ML20091M545 | 31 May 1984 | Design Review of Connecting Rods for Tdi DSRV-4 Series Diesel Generators, Final Rept Prepared for Tdi Diesel Generator Owners Group | Finite Element Analysis Breakaway torque |
ML20091M551 | 23 May 1984 | Investigation of Types AF & Ae Piston Skirts, Final Rept Prepared for Tdi Diesel Generator Owners Group | Hydrostatic Nondestructive Examination Finite Element Analysis |
ML20091R628 | 4 May 1984 | Suppl to Emergency Diesel Generator Auxiliary Module Control Wiring & Termination Qualification Review for Tdi Generators, Prepared for Tdi Diesel Generator Owners Group | |
ML20092G896 | 30 April 1984 | Fracture & NDE Evaluations for Closure Flange Regions of Comanche Peak Units 1 & 2 | |
ML20093A391 | 30 June 1984 | Rev 1 to Detailed Control Room Design Review Summary Rept for Snupps, in Response to Generic Ltr 82-33,(NUREG-0737, Suppl 1) | Boric Acid Backfit |
ML20093F862 | 4 October 1984 | Moisture Content Analysis for Air Stream at Inlet to Auxiliary Bldg Ventilation Exhaust Charcoal Filters | |
ML20093M735 | 31 August 1984 | Rev 3 to Calibr Rept RD-72 Wide-Range Gas Monitor High & Mid-Range Detectors | |
ML20093M737 | 31 October 1984 | Rev 5 to Calibr Rept for Model RD-52 Offline Beta Detector | |
ML20095C690 | 31 July 1984 | Draft Sequoyah Nuclear Plant Integrated Containment Analysis, Technical Rept | Boric Acid Reactor Vessel Water Level |
ML20095C701 | 31 July 1984 | Draft Resuspension of Deposited Aerosols Following Primary Sys or Containment Failure, Technical Rept | |
ML20095C725 | 7 August 1984 | Draft Grand Gulf Nuclear Station Integrated Containment Analysis, Technical Rept | |
ML20095C773 | 7 August 1984 | Draft, Peach Bottom Atomic Power Station Integrated Containment Analysis, Technical Rept | Safe Shutdown Reactor Vessel Water Level Probabilistic Risk Assessment Abnormal operational transient B.5.b Mitigating Strategies Fuel cladding |
ML20098B044 | 30 September 1984 | Rev 0 to Finite Element Analysis of Pipe Whip Restraints SI3R-640A,FWR-35 & FWR-16 | Finite Element Analysis |
ML20098C883 | 27 May 1983 | Implications of WPPSS Problems on Investor Owned Utils in Pacific Northwest | |
ML20098C933 | 31 December 1974 | 1974 Updated Financial & Operating Summaries of 104 Consumer-Owned Participants & Fire Investor Owner Companies 1974 Annual Rept to Stockholders | |
ML20098D014 | 9 April 1973 | Long-Range Projection of Power Loads & Resources for Thermal Planning,West Group Area 1973-74 Through 1992-93 | |
ML20098H125 | 15 February 1977 | Pacific Northwest Utils Conference Committee,West Group Forecast of Power Loads & Resources, Jul 1977 - June 1988 | |
ML20100F106 | 30 November 1984 | Comparison of Davis-Besse Abnormal Transient Operator Guidelines & Emergency Operating Procedure EP 1202.01 | |
ML20101B479 | 30 November 1984 | Summary Rept on Design Basis of Shutdown Cooling Sys Relief Valves for CESSAR Sys 80 | Hydrostatic |
ML20101B493 | 30 November 1984 | Summary of Rept on Operability of Shutdown Cooling Sys Relief Valves for Palo Verde Units 1,2 & 3 | |
ML20101K282 | 21 December 1984 | Draft Interim Justification Position for Seismic & Environ Qualification of In-Core Thermocouples,Connectors,Adaptors & Ref Junction Box (ESE-43 & ESE-44) | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20105C177 | 18 November 1983 | Draft Rept on 1969-1979 BWR Precursor Event Reevaluation Using BWR Plant Class Special Event Trees | Probabilistic Risk Assessment |
ML20105C712 | 20 January 1984 | Northwest Us Subduction Zone Seismic Risk Assessment, Proposal to Research Program | Earthquake |
ML20106E254 | 24 October 1984 | Nonproprietary Verification of Cecor Coefficient Methodology for Application to PWRs of Middle South Utils Sys | |
ML20107L925 | 11 June 1984 | Comments on Detailed Control Room Design Review Program Plan,Surry Power Station Units 1 & 2 & North Anna Power Station Units 1 & 2 | |
ML20113F796 | 31 January 1985 | Rev 0 to SAD-454, Response to Nrc/Nrr on Pipe Restraint Energy Absorbing Matl Licensing Condition | Finite Element Analysis |
ML20113F816 | 31 January 1985 | Rev 2 to SAD-431, Evaluation of Energy Absorbing Matl for Pipe Whip Restraints | |
ML20114F817 | 31 December 1981 | Evaluation of Fort St Vrain Nuclear Generating Station | |
ML20114F901 | 17 August 1982 | Marked-up Performance Objectives & Criteria for Plant Evaluations, Showing Changes as of 820817 | High Radiation Area |
ML20116E817 | 24 April 1985 | Final Rept:Task Analysis & Verification of Snupps Control Room | Boric Acid Stroke time |
ML20117D341 | 31 May 1985 | Detailed Control Room Design Review Final Summary Rept | Loop seal Emergency Lighting Backfit |
ML20117J181 | 30 November 1981 | Evaluation of Sequoyah Nuclear Plant | |
ML20117J193 | 31 December 1982 | Evaluation of Palisades Nuclear Plant,Consumers Power Co | |
ML20117J226 | 31 March 1983 | Station,Vepco, 1982 Evaluation |