Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML20210T44427 March 1986FOIA Request for Initial (Cycle 1) Startup Test Repts & Suppls for Seven Plants & Original Monthly Operating Rept for June 1983 for Virgil C Summer Plant
ML20211D66312 February 1987Notifies of 830204 Meeting W/Util,Idvp,Nrc & BNL in San Francisco,Ca to Discuss Status of Containment Annulus Steelwork & Status of Auxiliary Bldg
ML20211D70312 February 1987Notifies of 830209 Meeting in San Francisco,Ca to Discuss Shake Table Tests of Electrical Equipment
ML20211D74412 February 1987Notifies of 830517 Meeting in San Francisco,Ca to Discuss Development of Piping Stress Intensification Factor
ML20211D77421 April 1983Notifies of 830421 Meeting W/Util,Nrc & Idvp in Boston,Ma to Discuss Hosgri Response Analysis Topic & non-Hosgri Rlca Verifications
ML20211D78326 April 1983Notifies of 830426 Meeting in San Francisco,Ca to Discuss Status of All Structures
ML20211D81112 May 1983Notifies of 830512 Meeting W/Nrc,Util & Idvp in Boston,Ma to Discuss Containment & Turbine Bldgs
ML20211D83318 May 1983Discusses Proposed Change to Procedures Allowing NRC to Attend IDVP-DCP Meetings for Exchange of Background Info
ML20211D8682 June 1983Notifies That Location of 830602 Meeting Changed to Boston, Ma.Agenda Items Listed for Meeting
ML20211D88520 June 1983Notifies of 830602 Meeting in San Francisco,Ca to Review Requests for Info on Rupture RestraintsEarthquake
ML20211E43625 August 1983Forwards Revs 0 to Interim Technical Repts,Including ITR-57, Review of Diablo Canyon Plant Activities Fuel Handling Bldg, ITR-58, Verification of Diablo Canyon Plant Activities Intake Structure & ITR-60.W/o Encls
ML20211E51524 August 1983Forwards 830819 Rev Package & 839822 Errata Package 5 to Suppl Facility Idvp Final Rept
ML20211E54210 August 1983Notifies of Change in Date & Location of 830810 Meeting in Waltham,Ma Re Auxiliary Bldg & Interior Structure Horizontal Spectra.New Date & Location Not Indicated
ML20211E5615 August 1983Notifies of Idvp 830805 Meeting in Boston,Ma Re Auxiliary Bldg & Interior Structure Horizontal SpectraSafe Shutdown
Operating Basis Earthquake
Earthquake
ML20211P20524 November 1986FOIA Request for La Crosse & Big Rock Point Semiannual Effluent Repts & Turkey Point & St Lucie SALP Repts
ML20213F88430 October 1986FOIA Request for Encls to NRC 860724 & 31 Requests for Addl Info Re Vermont Yankee Spent Fuel Pool Expansion & Browns Ferry Seismic Reevaluation Program,Respectively
ML20214J97615 October 1986FOIA Request for Containment Event Trees for Listed Facilities,Technical Repts & Memoranda Re Interpretation & Quantification & Identification of FIN Numbers,Contractors & Investigators Involved in Creation/Analysis of Event Trees
ML20214K02315 October 1986FOIA Request for All Documentation Re Accident Sequence Evaluation Program Repts Re Listed Facilities in Preparation for NUREG-1150
ML20214K52618 July 1986FOIA Request for SECY-86-174 Re ISFSI Using Dry Casks
ML20214Q88017 April 1987Forwards EGG-NTA-7591, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28 Reactor Trip Sys Vendor Interface,Hatch-1 & 2,Millstone-1, Final Rept.Plants Conform to Item
ML20214R06217 April 1987Forwards EGG-NTA-7613, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface,Arnold, Brunswick-1 & 2, Final Rept.Plants Conform to Item
ML20214R13626 March 1987Forwards Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Maine Yankee, St Lucie 1 &-2 & Waterford 3, Final Rept.Plants Conform to Generic Ltr
ML20214R18626 March 1987Forwards Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components,Haddam Neck & Millstone 1,2 & 3, Final Rept
ML20214R4058 May 1987FOIA Request for Region Input to NRR Re Status of Listed Plants Readiness for Ol,Per IE Manual Chapter 94300
ML20214R86127 March 1987Forwards EGG-NTA-7614, Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Cook-1 & -2,Haddam Neck, Final Informal Rept.Facilities Conform to Generic Ltr
ML20214R8835 November 1986FOIA Request for Encls to 860821 SALP Repts
ML20215D01529 April 1987FOIA Request for Listed Info Re Dec 1986 Accident at Facility That Killed Four Employees & Injured Four Other Employees When Pipe Burst
ML20215H9335 December 1983Provides Info Re Insp Status of 1982 Mods to Idvp & Data Re Raceway Bolts,Per D Kirsh 831130 RequestNon-Destructive Examination
Hydrostatic
Nondestructive Examination
Liquid penetrant
Scaffolding
ML20215L7357 May 1987Forwards Final EGG-NTA-7383, Conformance to Generic Ltr, Item 2.2.1 - Equipment Classification for All Other Safety- Related Components,Mcguire 1 & 2, Informal Rept.Plant Conforms to Generic Ltr on Item
ML20215M0941 May 1987Forwards Final EGG-NTA-7605, Conformance to Generic Ltr 83-28,Item 2.2.2 Vendor Interface Programs for All Other Safety-Related Components,Mcguire Units 1 & 2, Informal Rept
ML20215M99421 May 1986FOIA Request for Documents Re Eg Case 771201 Memo to Tj Mctiernan Concerning Chronology of Events Associated W/ Facility Fault Assessments
ML20216B8651 May 1987Forwards Final EGG-NTA-7611, Conformance to Generic Ltr 83-28,Item 2.2.2-Vendor Interface Programs for All Other Safety-Related Components:Nine Mile Point Units 1 & 2, Informal Rept
ML20234A7618 May 1964Twx Requesting Response to & Stds for Control Rods
ML20234A8163 September 1963Advises That Using Zero Instead of 0.5% Damping for Equipment Items of Bodega Reactor Would Not Be Useful W/ Small Vibration,Per 630829 Discussion on Obtaining Higher Seismic Design Forces for Equipment
ML20234A8744 September 1963Clarifies Items in 630815 & 30 Ltrs Ref Amend 4 to Util License Application for Proposed Nuclear Power Reactor at Bodega Bay Re Design Spectra & Reactor Structure
ML20234A9324 October 1971Forwards Vv Mackenzie to Author Re Oct 1964 Rept Entitled, Seismic Effects on Bodega Bay Reactor Concerning Subsequently Withdrawn Application of Util to Build Nuclear Steam Generating Plant at Bodega Head,Ca
ML20234A9376 May 1964Provides Info Re Influence of Seismic Considerations on Reactor Costs & Availability of Seismic Resistance in Reactors Not Designed to Withstand Seismic Forces
ML20234B1656 September 1963Informs of Plans to Attend 630917 Conference of Consultants in Bethesda,Md Re Bodega Head Power Plant
ML20234B16817 March 1964Requests Response to Listed Questions Re Bodega Bay Unit 1, Including Info on Reactor Safety Control Sys,Design of Underground Structures Traversing Fault Lines to Resist Ground Movement & Estimates & Benefits to PublicEarthquake
ML20234B4423 June 1964Forwards Revised Draft of Questions Resulting from ACRS Meeting of May 8, Per 640515 Meeting on Bodega ReactorEarthquake
ML20234B5198 August 1963Forwards Illustrations for Figures 1 & 7 for Insertion in Seismological Analysis of Bodega Head,Ca, Mailed on 630720
ML20234B62112 May 1987Requests That Listed Plants Be Added to Encl 870508 FOIA Request Re 94300 Region Input on Plant Readiness
ML20234B6578 May 1987FOIA Request for Placement,In Pdr,Region Input to NRC Headquarters,Nrr Re Status of Listed Plants in Terms of Plant Readiness for OL IE Manual,Chapter 94300
ML20234C56227 August 1963Ack Receipt of Re Possible Future Schedules
ML20234C80420 July 1963Forwards Revised Version of Seismological Rept on Proposed Bodega Head Nuclear Power Plant.Rept Includes Mods Made in Chicago on First Six or Seven Pages of Text,Complete Rev of Last Half of Rept & New IllustrationsEarthquake
ML20234C86523 July 1963Submits List of Errors Observed in Matl Submitted by .Ltr Protesting Const PG&E Nuclear Power Plant Encl
ML20234D09711 October 1963Forwards Comments on Jp Eaton Rept Entitled Geologic & Seismologic Investigations of Proposed Nuclear Power Plant on Bodega Head,Sonoma County,Ca, for Seismological PhaseEarthquake
ML20234D12919 August 1963Requests to Be Informed If Proposed Hearing on Bodega Head Power Plant Proposal Might Be Delayed to Point Where Hearing Will Overlap W/Author 630920 Trial Appearance Date
ML20234D25126 July 1963Forwards Two Memos Commenting on Housner Processed Memo Distributed at Argonne Labs on 630802 & Statements Made in Course of Talks.Related Info Encl
ML20234D85516 July 1963Forwards Matl Re Bodega Bay Atomic Park Unit 1 Re Questions Raised in Meetings at Bethesda,Md & Argonne on 630702, Including Cost of Seismic Protection,Conclusions for Final Rept,Comments on Spectra & Working Stresses as Design BasisEarthquake
Weak link