Text
._
'RTELEDYNE ENGINEERING SERVICES 130 SECOND AVENUE 0%,
'AALTH AM. MASSACHUSETTS C2254 (61 L 890 3350 Twx C10i 3244508 May 18, 1983 5511-348 Mr. G. A. Maneatis, Executive Vice-President Pacific Gas and Electric Co.
L 77 Beale Street-San Francisco, California 94106 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Mr. J. B. Martin, Regional Administrator Region V U. S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
Subject:
IDVP-DCP Meetings for Exchange of Background Information Gent'lemen:
IDVP procedures presently state that the NRC Staff and the Designated Other Parties (00P) are not required to be notified for meetings involv-ing only Background Information, but must be notified for meetings held "for the purpose of discussing substantive information, presenting or discussing conclusions, or honoring requests by 00P for clarification."
The present status of the IDVP is that we have essentially completed the initial sample verification and additional verification / sample efforts, and almost all our work now involves verification of DCP efforts.
In order to expedite the transfer of information to the NRC Staff and the DOP, we now propose a change to the existing procedure with respect to meetings held for the purpose of exchanging " Background Information."
The DCP concurs with this proposal.
The change in procedure is that the NRC Staff and the 00P may now attend meetings called for the purpose of discussing technical " Background Information."
When five days or more are available for notice we will follow the existing notice procedure.
However, in most cases five days are not available.
Therefore, an answering service will be made available, with information updated at least daily, describing meetings y&B7 1
" meses-so, 0y3y Y
da TERS J W JETALLLEU:sTS
'A'TELEDYNE ENGINEERING SERVICES Messrs. Maneatis, Denton and Martin 5511-348 May 18, 1983 4
Page 2 to be held on that day and for tne next six calendar days.
For each meeting the operator will have the following information available:
Date Starting Time and Expected Completion Time Location Subject Collect calls will not be accepted, nor will messages be accepted or calls returned.
The service will be available 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, starting today, May 18, 1983, by calling 617-894-0131.
NRC Staff members and 00P who plan to attend must identify themsalves to the senior IDVP person at the meeting. However, for planning purposes we do request, if time permits, that the NRC Staff and 00P notify TES of intention to attend these meetings.
There are no other changes to the procedures defined by DCNPP-IDVP-PP-007.
Very truly yours, TELE' DYNE ENGINEERING SERVICES C
William E. Cooper Program Manager - 5511 WEC/lh cc:
H. E. Schierling (NRC) (3)
R. R. Fray (PG&E)
E. Denison (RLCA)
R. F. Reedy (RFR)
F. Sestak (SWEC)
M. Axelrad, Esq.
A. C. Gehr, Esq.
B. Norton, Esq.
D. F. Fleischaker, Esq.
J. R. Phillips, Esq/J. Reynolds, Esq.
M. J. Strumwasser, Esq.
R. B. Hubbard J. Roesset
.