Issue date | Title | |
---|---|---|
05000293/FIN-2018002-05 | Licensee-Identified Violation | |
05000293/LER-2010-001 | Pilgrim Nuclear Power StationEntergy 600 Rocky Hill Road Plymouth, MA 02360 Kevin H. Bronson Site Vice President March 11, 2010 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 �SUBJECT: Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Licensee Event Report 2010-001-00 LETTER NUMBER: 2.10.017 Dear Sir or Madam: The enclosed Licensee Event Report (LER) 2010-001-00, "Single Train of Reactor Building Closed Cooling Water System Inoperable for Time Period Exceeding Technical Specification Limits" is submitted in accordance with 10 CFR 50.73. This letter contains no commitments. Please do not hesitate to contact Mr. Joseph R. Lynch, (508) 830-8403, if there are any questions regarding this submittal. Sincerely Kevin H. Bronson FXM Enclosure CC: Mr. James S. Kim, Project Manager Mr. Samuel J. Collins Plant Licensing Branch 1-1 Regional Administrator, Region 1 Division of Operator Reactor U.S. Nuclear Regulator Commission Licensing 475 Allendale Road Office of Nuclear Reactor Regulation King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission One White Flint North O-8C2 11555 Rockville Pike Rockville, MD 20852 INPO Records Senior Resident Inspector 700 Galleria Parkway Pilgrim Nuclear Power Station Atlanta, GA 30399-5957 T- E2 A)12. (12 01 NRC Form 366 U.S. NUCLEAR REGULATORY COMMISSION Approved by OMB: No. 3150-0104 , Expires: 08/31/2010 (9-2007) Estimated burden per response to comply with this mandatory information • collection request: 80 hrs. Reported lessons learned are incorporated into theLICENSEE EVENT REPORT (LER) licensing process and fed back to industry. Send comments regarding burden estimate to the Records and FOIA/Privacy Service Branch (T-5 F52). U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov , and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a means used to impose and information collection does not display a currently valid control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. 1. FACILITY NAME 2. DOCKET NUMBER 3. PAGE PILGRIM NUCLEAR POWER STATION 05000-293 1 of 5 4. TITLE ' Single Train of Reactor Building Closed Cooling Water System Inoperable for Time Period Exceeding Technical 05000 Specification Limits | |
05000293/LER-2013-005 | HPCI Flow Controller Failure to Achieve Rated Flow while in Auto Mode | |
05000293/LER-2013-006 | HPCI Flow Controller Failure to Achieve Rated Flow while in Auto Mode | |
05000293/LER-2016-008 | 9 December 2016 | Emergency Diesel Generator 'A' Past Inoperability LER 16-008-00 for Pilgrim Nuclear Power Station Regarding Emergency Diesel Generator 'A' Past Inoperability |
05000293/LER-2017-003 | 25 May 2017 | Supplement to Suppression Pool Declared Inoperable Due to High Water Level LER 17-003-00 for Pilgrim Nuclear Power Station Regarding Pressure Suppression Pool Declared Inoperable Due to High Water Level |
05000293/LER-2017-010 | 7 August 2017 | Air Accumulation Creates Small Void in Core Spray Discharge Piping LER 17-010-00 for Pilgrim re Air Accumulation Creates Small Void in Core Spray Discharge Piping |
ENS 53287 | Control Rod Drive Piping Potentially Inoperable | |
ENS 53815 | En Revision Imported Date 2/12/2019 | |
IR 05000293/1986006 | 28 March 1986 | Insp Rept 50-293/86-06 on 860218-0307.Violation Noted: Replacement Squib Charges Installed in Standby Liquid Control Sys (SLCS) from Batch Not Tested During Manual Initiation of SLCS |
IR 05000293/1987016 | 22 May 1987 | Insp Rept 50-293/87-16 on 870221-0406.One Violation Noted: Failure to Properly Implement Fire Protection Equipment Surveillance Procedures |
IR 05000293/1996006 | 30 October 1996 | Insp Rept 50-293/96-06 on 960729-0923.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support |
IR 05000293/2004004 | 16 July 2004 | IR 05000293-04-004, on 04/01/2004 - 06/30/2004, Pilgrim Nuclear Power Station; Maintenance and Risk Assessment and Emergent Work Control |
IR 05000293/2011003 | 28 July 2011 | IR 05000293-11-03, on 04/1/11 - 06/30/11; Pilgrim Nuclear Power Station NRC Integrated Inspection Report |
IR 05000293/2015002 | 11 August 2015 | IR 05000293-15-002; 04/01/2015 - 06/30/2015; Pilgrim Nuclear Power Station (Pilgrim); Equipment Alignment, Operability Determinations and Functionality Assessments, and Follow-Up of Events and Notices of Enforcement Discretion |
IR 05000293/2016011 | 10 May 2017 | Supplemental Inspection Report (Inspection Procedure 95003 Phase 'C') 05000293/2016011 and Preliminary Greater-than-Green Finding |
IR 05000293/2017001 | 15 May 2017 | Integrated Inspection Report 05000293/2017001 |
IR 05000293/2017002 | 14 August 2017 | Integrated Inspection Report 05000293/2017002 |
IR 05000293/2017009 | 21 December 2017 | Problem Identification and Resolution Inspection Report 05000293/2017009 |
IR 05000293/2018002 | 14 August 2018 | Integrated Inspection Report 05000293/2018002 |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |
L-21-008, License Amendment Request to Approve Pilgrim Nuclear Power Station Independent Spent Fuel Storage Installation Only Emergency Plan | 18 February 2021 | License Amendment Request to Approve Pilgrim Nuclear Power Station Independent Spent Fuel Storage Installation Only Emergency Plan |
L-21-098, Response to Request for Additional Information (RAI) - License Amendment Request to Approve the Pilgrim Nuclear Power Station Independent Fuel Storage Installation Only Emergency Plan | 7 September 2021 | Response to Request for Additional Information (RAI) - License Amendment Request to Approve the Pilgrim Nuclear Power Station Independent Fuel Storage Installation Only Emergency Plan |
ML022380346 | 16 August 2002 | Request for Amendment to the Technical Specifications Consolidated Line Item Improvement Process (Clip) Implementation to TSTF-358 - Missed Surveillance Requirements |
ML031681387 | 6 June 2003 | Request for Additional Information Request for Amendment to the Technical Specifications Consolidated Line Item Improvement Process (CLIIP) Implementation of TSTF-358 - Missed Surveillance Requirements |
ML032740278 | 30 September 2003 | Technical Specification Pages, Adding New Technical Specification Requirement as 4.0.3 |
ML041130279 | 14 April 2004 | Request for Amendment to the Technical Specifications Reactor Vessel Hydrostatic and Leak Testing Requirements |
ML050760177 | 16 March 2005 | Tech Spec Pages for Amendment No. 211, Revise Reactor Vessel Hydrostatic and Leak Testing Requirements |
ML063130351 | 2 November 2006 | Application for Technical Specification (TS) Change to Add LCO 3.0.8 on the Inoperability of Snubbers (and Adoption of TS Bases for LCO 3.0.8) Using the Consolidated Line Item Improvement Process (CLIIP) |
ML072610197 | 18 September 2007 | Technical Specifications, Adoption of Technical Specification Task Force (TSTF) Change TSTF-372, the Addition of Limiting Condition for Operation (LCO) 3.0.8 on the Inoperability of Snubbers |
ML083660174 | 23 January 2009 | TIA - Task Interface Agreement - Evaluation at Pilgrim of Application of TS 4.0.3, 12/31/08 |
ML091030488 | 21 November 2008 | Draft - RO & SRO Written Exam (Folder 2) |
ML102950572 | 23 January 2009 | Task Interface Agreement - Evaluation of Application of Technical Specification 4.0.3, Surveillance Requirement Applicability, at Pilgrim |
ML102950576 | 23 January 2009 | Task Interface Agreement Evaluation of Application of Technical Specification 4.0.3, Surveillance Requirement Applicability, at Pilgrim |
ML14094A155 | 25 March 2014 | Final Written Examination with Answer Key (401-5 Format) (Folder 2) |
ML16320A155 | 15 November 2016 | Region I Response to Lochbaum E-mail a and B EDG Operability Concerns |
ML18179A163 | 21 June 2018 | Retraction of Licensee Event Report 2018-002-00, Diesel Generator a Inoperability, a Condition Prohibited by the Plant Technical Specifications |
ML18218A174 | 1 August 2018 | Revised the Emergency Plan and Emergency Action Level Scheme to Address the Permanently Defueled Condition |
ML19169A279 | 12 August 2019 | Final Accident Sequence Precursor Analysis- Pilgrim Nuclear Power Station, Reactor Core Isolation Cooling System Declared Inoperable During Surveillance Testing |
ML19212A651 | 12 August 2019 | Transmittal of Final Accident Sequence Precursor Report (Licensee Event Report 293-2019-001) |
ML19351A458 | 6 December 1989 | LER 89-034-00:on 891108,determined That Reactor Pressure Exceeded 150 Psig on 891107 W/O Performing Surveillance Procedure 8.5.4.4, HPCI Valve Operability Test. Caused by Personnel Error.Procedure initiated.W/891206 Ltr |
ML20012E983 | 30 March 1990 | LER 90-002-00:on 900228,determined That Max Fraction of Limiting Power Density Not Checked Daily During Reactor Power Operation,Per Tech Spec 4.1.B.On 900323,addl Tech Spec Issue Discovered.Tech Specs changed.W/900330 Ltr |
ML20042F591 | 30 April 1990 | LER 90-006-00:on 900330,determined That Position of Primary Containment Sys Isolation Valve Not Recorded Daily,Per Tech Specs.Review Performed to Determine If Other Problems Existed.Plant Shut Down & Review performed.W/900430 Ltr |
ML20094C897 | 1 November 1995 | Part 21 Rept Re Valves Being Supplied W/Bushings Made of Babbitt Graphalloy Instead of Graphite.Corrective Actions: Ring-O-Valve Spa Supplied Replacement Nickel Graphalloy Bushings |
ML20137E567 | 18 March 1997 | Insp Rept 50-293/97-01 on 970112-0302.Violations Noted.Major Areas Inspected:Operations,Engineering & Plant Support |
ML20137Y550 | 31 December 1985 | AEOD/T516, HPCI Overspeed Trip Loss Events & Subsequent Damage Due to Water Hammer, Technical Review Rept.Item Remains Unresolved Pending Development & Approval of Licensee Final Corrective Action |
ML20151C674 | 30 March 1988 | Partially Withheld Enforcement Conference Insp Rept 50-293/87-30 on 870909 (Ref 10CFR73.21).Major Areas Discussed:Status of Security Program & Allegations Re Deficiencies in Security Program |
ML21076A404 | 17 March 2021 | License Amendment Request to Revise Pilgrim Nuclear Power Station Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool |