Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML04175052521 June 2004Bhalchandra Vaidya
NRC/NRR/DLPM/LPD2
RAI, Security Plan Sections 10-19RAI
ML04197004325 June 2004Bhalchandra Vaidya
NRC/NRR/DLPM/LPD2
Request for Additional Information Security Plan Sections 1-9RAI
ML0421001489 July 2004Bhalchandra Vaidya
NRC/NRR/DLPM
Request for Additional Information Training and Qualification PlanRAI
ML04210016623 July 2004Bhalchandra Vaidya
NRC/NRR/DLPM
Request for Additional Information Safeguards Contingency Plan and Section 9.4.1 of the Physical Security PlanRAI
ML04211001027 July 2004Entergy
Peter Dietrich
Response to Training and Qualification Rals 9Other
ML0421803733 August 2004Entergy
Balduzzi M
Amended Responses to Security Plan Rals Sections 1-19Other
ML04222006223 July 2004Bhalchandra Vaidya
NRC/NRR/DLPM
RAI Safeguards Contingency Plan and Section 9.4.1 Fo the Physical Security PlanRAI
ML04230014912 August 2004Entergy
Balduzzi M
Response Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan RalsOther
ML04237032019 August 2004Entergy
Olson E
Supplemental Response to Safeguards Contingency Plan and Section 9.4.1 of the Physical Security Plan RalsSupplement
ML04243025326 August 2004Entergy
Bethay S
Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station Follow-up to Response to Request for Additional Information Regarding Security Plan Sections 1 - 19 and Safeguards Contingency PlanResponse to RAI
ML0425900469 September 2004Entergy
Peter Dietrich
Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station Submittal of Revision to Security Plan, Training and Qualification Plan, and Safeguards Contingency Plans Incorporating RAI ResponsesOther
ML04293025313 October 2004Entergy
Balduzzi M
Re-Submittal of Final Security Plan, Training and Qualification Plan, and Safeguards Contingency PlansOther
ML04312001129 October 2004John Nakoski
NRC/NRR/DLPM/LPD2
Administrative Change to Facility Operating License in Conjunction with the Commission Order EA-03-086 Regarding Revised Design Basis Threat and Revisions to Physical Security Plan, Training and Qualifications Plan, and Safeguards ...Other