Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
M000397, Spectra Tech Inc., Biennial Update Report for the Three Mile Island, Unit 2 and Independent Spent Fuel Storage Installation, STI-N LF-RPT-019 | 31 March 2017 | Spectra Tech Inc., Biennial Update Report for the Three Mile Island, Unit 2 and Independent Spent Fuel Storage Installation, STI-N LF-RPT-019 | Grace period |
ML060760219 | 12 April 1979 | Letter from J. G. Herbein, Meted/Gpu, to Denwood Ross, USNRC, Transmitting Safety Analysis Report for Transition to Natural Circulation | |
ML070820561 | 15 March 2007 | Safety Analysis Report for the Inl TMI-2 Independent Spent Fuel Storage Installation, Revision 5. Table of Contents and Section 7. Radiation Protection | High Radiation Area |
ML070930360 | 31 January 2005 | Cps/Usar, Appendix D, Requirements Resulting from TMI-2 Accident, Revision 11 | Reactor Vessel Water Level Grab sample Probabilistic Risk Assessment Fuel cladding |
ML072470535 | 22 August 2007 | Update 7 of the Post-Defueling Monitored Storage Safety Analysis Report | |
ML080220252 | 8 January 2008 | License Renewal Application, Section 3.4 Aging Management of Steam and Power Conversion System Through Appendix a | Aging Management |
ML080800161 | 18 March 2008 | Radioactive Waste Management System and Effluent Control System Description from TMI-1, Updated Final Safety Analysis Report, Revision 18, Harrisburg, Pennsylvania | Boric Acid Loop seal Accidental discharge |
ML083050449 | 31 August 2003 | Post De-Fueling Monitored Storage Safety Analysis Report, Update 5, August 2003 | Safe Shutdown Boric Acid High winds High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Hydrostatic Coatings Operating Basis Earthquake Emergency Lighting Locked High Radiation Area Decommissioning Funding Plan Tornado Generated Missile Earthquake Fire Protection Program Power change |
ML092650291 | 31 August 2009 | Post De-Fueling Monitored Storage Safety Analysis Report, Update 8, August 2009 | Hydrostatic Fire Protection Program |
ML110730141 | 3 March 2011 | Submittal of Three Mile Island, Unit 2, Safety Analysis Update Report (EM-FMDP-11-024) | Grace period |
ML15084A135 | 11 March 2015 | Submittal of Three Mile Island Unit 2 (Docket 72-20) Safety Analysis Update Report 72-20/2015-01 (EM-FMDP-15-015) | |
ML16120A014 | 11 April 2016 | Three Mile, Unit 1 - Updated Final Safety Analysis Report (Ufsar), Revision 23, Fire Hazards Analysis Report (Fhar), Revision 27, UFSAR and Fhar Reference Drawings | FLEX Aging Management |
ML16127A469 | 11 April 2016 | 000_TMI-1 UFSAR License Renewal Appendix a Supplement | |
ML16127A471 | 11 April 2016 | 002_01 Introduction and SUMMARY-Figures | |
ML16127A474 | 11 April 2016 | 005_03 Reactor | |
ML16127A476 | 11 April 2016 | 044_14 Safety ANALYSIS-Figures | |
ML16127A477 | 11 April 2016 | 045_14 Appendix 14A Design Review | Safe Shutdown |
ML16127A479 | 11 April 2016 | 047_14 Appendix 14B Iodine Removal Estimates | |
ML16127A480 | 11 April 2016 | 048_14 Appendix 14B Iodine Removal Estimates Figures | |
ML16127A481 | 11 April 2016 | 049_14 Appendix 14C Dose Estimates | |
ML16127A483 | 11 April 2016 | 006_03 REACTOR-Figures | |
ML16127A484 | 11 April 2016 | 007_04 Reactor Coolant System | |
ML16127A485 | 11 April 2016 | 008_04 Reactor Coolant SYSTEM-Figures | |
ML16127A486 | 11 April 2016 | 009_05 Containment System and Other Special Structures | |
ML16127A491 | 11 April 2016 | 014_05 Appendix 05C Design of Large Opening Reinforcements | Coatings Finite Element Analysis Earthquake |
ML16127A492 | 11 April 2016 | 015_05 Appendix 5C Design of Large Opening REINFORCEMENTS-Figures | |
ML16127A493 | 11 April 2016 | 016_05 Appenxdix 05D Stress Analysis of Buttress | |
ML16127A494 | 11 April 2016 | 017_05 Appendix 5D Stress Analysis of BUTTRESS-Figures | |
ML16127A495 | 11 April 2016 | 018_05 Appendix 05E Structural Integrity Testing | Scaffolding |
ML16127A496 | 11 April 2016 | 019_05 Appendix 5E Structural Integrity TESTING-Figures | |
ML16127A498 | 11 April 2016 | 020_06 Engineered Safeguards | |
ML16127A499 | 11 April 2016 | 021_06 Engineered SAFEGUARDS-Figures | |
ML16127A500 | 11 April 2016 | 022_06 Appendix 06A Reactor Building Fan Cooler Assembly | |
ML16127A501 | 11 April 2016 | 023_06 Appendix 6A Reactor Building Fan Cooler ASSEMBLY-Figures | |
ML16127A502 | 11 April 2016 | 024_06 Appendix 06B Environmental QUALIFICATION-PT Parameters | |
ML16127A503 | 11 April 2016 | 025_06 Appendix 6B Environmental QUALIFICATION-PT PARAMETERS-Figures | |
ML16127A504 | 11 April 2016 | 026_07 Instrumentation and Control | |
ML16127A506 | 11 April 2016 | 028_08 Electrical Systems | |
ML16127A507 | 11 April 2016 | 029_08 Electrical SYSTEMS-Figures | |
ML16127A508 | 11 April 2016 | 030_09 Auxilliary and Emergency Systems | Fire Protection Program |
ML16127A510 | 11 April 2016 | 032_10 Steam and Power Conversion System | |
ML16127A511 | 11 April 2016 | 033_10 Steam and Power Conversion SYSTEM-Figures | |
ML16127A512 | 11 April 2016 | 034_11 Radioactive Waste and Radiation Protection | |
ML16127A513 | 11 April 2016 | 035_11 Radioactive Waste and Radiation PROTECTION-Figures | |
ML16127A514 | 11 April 2016 | 036_11 Appendix 11A Post Accident Shielding Evaluation | |
ML16127A516 | 11 April 2016 | 038_12 Conduct of Operations | |
ML16127A517 | 11 April 2016 | 039_12 Conduct of OPERATIONS-Figures | |
ML16127A518 | 11 April 2016 | 040_13 Initial Test and Operation | Shutdown Margin Hydrostatic |
ML16127A519 | 11 April 2016 | 041_13 Initial Test and OPERATION-Figures | |
ML16127A521 | 11 April 2016 | 042_13 Safety Related Test Abstracts Appendix 13A |