Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000101/2002028 | 17 April 1985 | Insp Rept 50-445/85-02 on 850101-0228.Violation Noted: Failure to Follow Administrative Requirements of Startup Administrative Procedure CP-SAP-12, Deviations to Test Instructions/Procedures | |
IR 05000401/2006021 | 28 January 1985 | Insp Repts 50-445/85-07 & 50-446/85-05 on 850401-0621. Violation Noted:Failure to Promptly Correct Identified Problem w/RTE-delta Potential Transformer Tiltout Subassemblies | Liquid penetrant |
IR 05000445/1973001 | 1 March 1973 | Regulatory Operations Insp Repts 50-445/73-01 & 50-446/73-01 on 730215.No Unresolved Items or Enforcement Actions Noted. Major Areas Inspected:Organizations,Reactor Operator Insp, Operator Responsibilities & inspector-licensee Relationship | |
IR 05000445/1975002 | 21 January 1975 | Regulatory Operations Insp Repts 50-445/75-02 & 50-446/75-02 on 750117.No Violation Noted.Major Areas Inspected:Followup Review Re Previously Identified Unresolved Item 74-02/VII B, Brown & Root QA Program Manual | |
IR 05000445/1975005 | 6 March 1975 | Insp Repts 50-445/75-05 & 50-446/75-05 on 750227-28. Deficiency Noted Re Procedure for Excavation for Reactor Containment Structures.Major Areas Inspected:Review of Qa/Qc Program Implementation for safety-related Structures | Safe Shutdown |
IR 05000445/1978006 | 4 April 1978 | IE Investigation Insp Repts 50-445/78-06 & 50-446/78-06 on 780321.Major Area Investigated:Allegation Re Possible Fraudulent Activities by Brown & Root | |
IR 05000445/1978014 | 3 October 1978 | IE Investigation Repts 50-445/78-14 & 50-446/78-14 on 780914 W/Pub Officials of Glen Rose,Tx Re Status of Subj Facil & Community Concerns Related to It | |
IR 05000445/1978019 | 9 November 1978 | IE Inspec Repts 50-445/78-19 & 50-446/78-19 on 781031-1103 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Constr Activities,Quality Assurance of Containment Concrete,Penetrations & HVAC Fabrication | |
IR 05000445/1979026 | 8 November 1979 | Insp Repts 50-445/79-26 & 50-446/79-25 on 791011-22.Three Allegations of Improprieties in Civil Const Phase Were Found to Be Factual But Had Already Been Corrected in QA Program | |
IR 05000445/1980026 | 4 November 1980 | Errata to Insp Repts 50-445/80-26 & 50-446/80-26 on 801105- 25.Supporting Documentation Encl | |
IR 05000445/1981005 | 15 April 1981 | Insp Repts 50-445/81-05 & 50-446/81-05 During Mar 1981.No Violations or Deviations Noted.Major Areas Inspected:General Site Tours,Protection of Installed & Uninstalled Equipment, Installation of safety-related Piping & Const Deficiencies | |
IR 05000445/1982003 | 21 May 1982 | IE Insp Repts 50-445/82-03 & 50-446/82-02 on 820201-0331. Noncompliance Noted:Inadequate Control of Procurement Documents & Purchased Matls | Hydrostatic Nondestructive Examination |
IR 05000445/1982005 | 21 May 1982 | IE Insp Rept 50-445/82-05 on 820419-23.No Noncompliance Noted.Major Areas Inspected:Onsite Design & Const Activities,Design Insp of Pipe Supports & Installation of safety-related Pipe Supports | |
IR 05000445/1982007 | 27 May 1982 | IE Insp Rept 50-445/82-07 on 820401-30.No Noncompliance Noted.Major Areas Inspected:Action on Previous Insp Findings,Equipment Turnover,Joint Test Group Activities & Plant Tours | |
IR 05000445/1982008 | 21 June 1982 | IE Insp Rept 50-445/82-08 on 820501-31.No Noncompliance Noted.Major Areas Inspected:Plant Tours & Preoperational Test Procedure Review | |
IR 05000445/1982009 | 29 June 1982 | IE Insp Repts 50-445/82-09 & 50-446/82-04 on 820427-0527.No Noncompliance Noted.Major Areas Inspected:Const Activities, Site Tour,Review of Records for Spent Fuel Racks,Protective Coatings,Electric Cable Installation & Calibr Records | Coatings |
IR 05000445/1982012 | 21 July 1982 | IE Insp Rept 50-445/82-12 on 820601-30.No Noncompliance Noted.Major Areas Inspected:Plant Tours & Preoperational Test Procedure Review | |
IR 05000445/1983020 | 2 April 1984 | Insp Rept 50-445/83-20 Canceled | |
IR 05000445/1983034 | 10 September 1983 | Partially Withheld Insp Repts 50-445/83-34 & 50-446/83-18 on 830812-19.No Violations or Deviations Noted.Major Areas Inspected:Nonconformance Repts for 811012-821012 & Reactor Vessel Outer Wall | Affidavit |
IR 05000445/1984014 | 14 May 1984 | Partially Withheld Insp Rept 50-445/84-14 on 840410-12 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Interim Fuel Storage Plan,Controlled Access Area, Access Controls & Intransit Protection | |
IR 05000445/1984037 | 6 December 1984 | Insp Rept 50-445/84-37 on 840924-1012.No Violations or Deviations Noted.Major Areas Inspected:Previous Insp Findings,Security Program,Access Control,Detection Aids & Communications.Details Withheld (Ref 10CFR73.21) | |
IR 05000445/1984045 | 18 September 1985 | Corrected Pages 14-17 of Insp Rept 50-445/84-45,correcting Rept Details in Section 6 Re Applicant Action on Previous Insp Findings (Items 6.a(3),b,c & D) | |
IR 05000445/1985003 | 4 June 1985 | Insp Repts 50-445/85-03 & 50-446/85-02 on 841219-850331.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous findings,applicant-identified Design/Const Deficiencies & Review of Afco Steel Purchase Order | |
IR 05000445/1985005 | 23 April 1985 | Insp Repts 50-445/85-05 & 50-446/85-04 on 850312-15.No Violation or Deviation Noted.Major Areas Inspected: Organization of Radwaste Program,Liquid,Solid & Gaseous Radwaste,Air Cleaning Sys & Instrumentation | |
IR 05000445/1985008 | 16 September 1985 | Insp Rept 50-445/85-08 on 850501-0731.No Violations or Deviations Identified.Areas Inspected:Human Engineering Deficiencies,Applicant Actions on Previous Insp Findings, Plant Tours & Plant Status | Hydrostatic |
IR 05000445/1985010 | 19 August 1985 | Insp Repts 50-445/85-10 & 50-446/85-10 on 850605-07.No Violation or Deviation Noted.Major Areas Inspected:Previous Emergency Preparedness Appraisal.One App a Item Closed & 35 App B Items Closed | |
IR 05000445/1985012 | 3 February 1986 | Insp Repts 50-445/85-12 & 50-446/85-08 on 850826-29.No Violation or Deviation Noted.Major Areas Inspected:Policies, Procedures & Implementation Re Ombudsman & Safeteam Programs for Identifying & Resolving Personnel Concerns | |
IR 05000445/1985016 | 26 November 1986 | Route Sheet for Insp Repts 50-445/85-16 & 50-446/85-13 on 851101-30.Time Summary for Hours Applied to Assigned Topics from IE Manual Encl | |
IR 05000445/1985017 | 9 January 1986 | Insp Repts 50-445/85-17 & 50-446/85-14 on 851028-1101 Re Design Adequacy Program Scope Validation Process & Review Checklist Development.Lack of Prescriptiveness of Review Checklists & Reviewer Qualifications Noted | Safe Shutdown Boric Acid Tornado Missile Internal Flooding Hydrostatic |
IR 05000445/1985019 | 18 March 1986 | Cable Tray Support As-Built Program Insp Rept 50-445/85-19 on 851118-1218.Violation Noted:Failure of Walkdown Teams & QC Inspectors to Correctly Determine & Verify as-built Cable Support Attributes | |
IR 05000445/1986004 | 24 March 1986 | Insp Repts 50-445/86-04 & 50-446/86-03 on 860101-0314. Violation Noted:Distribution of Drawings W/O Evidence of Review & Approval by Authorized Personnel & Failure to Perform Required Detailed Receiving Insps | |
IR 05000445/1986006 | 21 August 1986 | Insp Repts 50-445/86-06 & 50-446/86-04 on 860201-0331. Violations Noted:Failure to Address Spec Criteria for Cable Installation in Procedures,Improper Cable Placement & Failure to Install Cable Support Grips | Nondestructive Examination |
IR 05000445/1986007 | 10 December 1986 | Insp Repts 50-445/86-07 & 50-446/86-05 on 860401-0531. Violations Noted:Design Basis for Criteria for Base Metal Defect Insps Not Generated & Design Changes Not Reviewed for Original Design & Terminal Blocks Not Identified | |
IR 05000445/1986009 | 28 August 1986 | Insp Repts 50-445/86-09 & 50-446/86-07 on 860401-0630.No Violations or Deviations Noted.Major Areas Inspected: Applicant Actions on Previous Insp Findings,Design Mod Process Issues & Plant Tours & Status | |
IR 05000445/1986011 | 1 July 1986 | Insp Repts 50-445/86-11 & 50-446/86-09 on 860505-08.No Violation or Deviation Noted.Major Areas Inspected:Site Ombudsman & Safeteam Programs & walk-in Interviews W/ Licensee & Contractor Employees | |
IR 05000445/1986013 | 10 September 1986 | Insp Rept 50-445/86-13 Has Been Canceled | |
IR 05000445/1986014 | 31 October 1986 | Insp Repts 50-445/86-14 & 50-446/86-11 on 860601-30. Violations Noted:Failure to Identify,Tag,Segregate & Rept Nonconforming Components & Failure to Establish Procedures to Control Drilling of Holes Through Cable Trays | |
IR 05000445/1986016 | 14 July 1986 | Emergency Preparedness Insp Repts 50-445/86-16 & 50-446/86-13 on 860609-13.No Violation or Deviation Noted. Major Areas Inspected:Followup on Emergency Preparedness Appraisal Rept 50-445/83-33 & Insp 50-446/85-10 App B Items | |
IR 05000445/1986017 | 22 August 1986 | Insp Repts 50-445/86-17 & 50-446/86-14 on 860616-18 & 24 & 0707-17.Weaknesses & Open Items,Including Recordkeeping for Corrective Actions,Noted.Major Area Inspected:Tera QA Program for Design Adequacy Program | Safe Shutdown Tornado Missile |
IR 05000445/1986018 | 20 August 1986 | IE Insp Repts 50-445/86-18 & 50-446/86-15 on 860512-16 & 27-30.Concerns Noted:Failures to Meet Design Criteria Comments or Specs Not Found by Tera During Scan of Documents for Homogeneity | Safe Shutdown Hydrostatic |
IR 05000445/1986019 | 28 October 1986 | Insp Repts 50-445/86-19 & 50-446/86-16 on 860707-16.Major Areas Inspected:Implementation of Discipline Specific Action Plans Viii,Ix & XI for Civil/Structural,Piping/Supports & Electrical/Instrumentation & Control Disciplines | Tornado Missile Finite Element Analysis |
IR 05000445/1986020 | 24 March 1987 | Const Insp Repts 50-445/86-20 & 50-446/86-17 on 860701-0831.Violations Noted:Failure to Specify Documents/ Revs,Describe Work Operations & Failure of Qa/Qc to Adequately Monitor/Assure Traveler Sys Implementation | Scaffolding |
IR 05000445/1986021 | 29 September 1986 | Insp Repts 50-445/86-21 & 50-446/86-18 on 860701-31.No Violations or Deviations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Calibr Source Recovery,Plant Tours & Preoperational Test Procedure Review | |
IR 05000445/1986023 | 8 August 1986 | Insp Rept 50-445/86-23 on 860722-24.No Violations or Deviations Noted.Major Areas Inspected:Security Plan & Implementing Procedures.Details of Insp Rept Withheld (Ref 10CFR73.21) | |
IR 05000445/1986024 | 27 February 1987 | Insp Rept 50-445/86-24 on 860801-1031.No Violations or Deviations Noted.Major Areas Inspected:Applicant Actions on Previous Insp Findings,Plant Tours & Plant Status | Temporary Modification |
IR 05000445/1986025 | 13 February 1987 | Const Insp Repts 50-445/86-25 & 50-446/86-21 on 860901-30. No Violation or Deviation Noted.Major Areas Inspected: Previous Insp Findings,Posting of NRC Regulations,Safety Injection Pipe Welding & Fire Protection/Prevention | Nondestructive Examination |
IR 05000445/1986026 | 1 April 1987 | Insp Repts 50-445/86-26 & 50-446/86-22 on 860901-1031. Violations & Deviations Noted:Cable Pulling Ropes Left in Unit 1 Conduits & Cable Trays & Failure of Inspector to Write Memo Documenting Nonconforming Condition | Fire Barrier Nondestructive Examination |
IR 05000445/1986027 | 19 February 1987 | Insp Rept 50-445/86-27 Is Canceled | |
IR 05000445/1986028 | 31 March 1987 | Insp Repts 50-445/86-28 & 50-446/86-23 on 861001-1130.No Violations or Deviations Noted.Major Areas Inspected:Plant Status,Applicant Actions on Previous NRC Insp Findings, 10CFR50.55(e) Repts & ASME N-5 Data Rept Program | Coatings |
IR 05000445/1986030 | 29 April 1987 | Insp Rept 50-445/86-30 on 861101-870228.No Violations or Deviations Noted:Actions on Previous Insp Findings & Plant Tours |