Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
ML19224D36814 May 1979Transcript of 790514 Deposition of as Klomparens in Midland,Mi.Pp 1-53
ML19224D37023 May 1979Transcript of 790523 Deposition of RR Renfrow in Atlanta,Ga. Pp 1-220
ML19224D59514 May 1979Transcript of 790514 Deposition of P Oreffice.Pp 1-75
ML19224D59814 May 1979Transcript of 790514 Deposition of DA Durand.Pp 1-120
ML19224D60122 May 1979Transcript of 790522 Deposition of Jg Temple.Pp 1-166
ML19225A07514 May 1979Transcript of 790514 Deposition of Jf Hanes.Pp 1-76
ML19241B12715 May 1979Transcript of 790515 Deposition of Lf Nute in Midland,Mi. Pp 1-204
ML19250D40722 January 1981Deposition of J Brammer on 810122 in Bethesda,Md Re Acceptable Plastic Analysis Methods Applicable to Buried Piping Sys
ML19326D13228 February 1977Deposition of Wj Gunderson (FPC) Re Results of Review of Impact on Electric Svc Reliability W/ & W/O Plant
ML19329E2196 June 1973Deposition of Jl Bacon (CPC) on 730606 in Washington,D.C. Pp 31-44 & 54-55.RA Jablon Affidavit Encl
ML19329E2841 September 1978Deposition of Kl Baker (CPC) Before Mi Public Svc Commission Re Proposed time-of-day Rate Study.Pp 1-14.Proposed Sampling Schedule Encl
ML19329E2891 September 1978Deposition of Jh Climer (CPC) Before Mi Public Svc Commission Re Proposed time-of-day Rate Study.Pp 1-9. Proposed Test Rates & Potential Savings from Specific Appliances Encl
ML19329E2931 September 1978Deposition of Wj Jefferson (CPC) Before Mi Public Svc Commission Re Proposed time-of-day Rate Study.Pp 1-11.Time- of-day Usage Charts Encl
ML19329E59812 October 1973Deposition of Jd Pace (Natl Economic Research Associates) on 731012.One Page
ML19329E6425 November 1976Deposition of Gs Keeley (CPC) Re Project Status & Future Work Activities,Acrs Concerns,Delay Costs & Effects, & Cost Comparison of Operating V Abandoning of PlantBoric Acid
Ultimate heat sink
Coatings
Power Operated Valves
Turbine Missile
ML19329E6465 November 1976Deposition of RA Wells (CPC) Re Review of Anticipated Environ Impact Due to Const Activity
ML19329E6485 November 1976Deposition of Jg Temple (Dow Chemical Co) Re Contracts W/ Util.Mi Dept of Natural Resources Correspondence Re Vendor Violations of Air Quality Stds Encl
ML19329E6515 November 1976Deposition of Sh Howell (CPC) Re Contract Changes Since CP Hearings & Util Objectives in Current Negotiations.Contracts W/Dow Chemical Co Encl
ML19329E6525 November 1976Deposition of GL Heins (CPC) Re Availability of Reserve Capacity & Adequacy of Energy Supply 1981-84.Certificate of Svc Encl
ML19329E6826 June 1973Deposition of Jl Bacon (CPC) on 730606 in Washington,Dc.Pp 1 & 6 Only Encl
ML19329E68315 May 1973Deposition of Jl Bacon (CPC) on 730515 in Jackson,Mi.Pp 1, 220-23 & 250-1.JC Pollock Affidavit & Certificate of Svc Encl
ML19329E70629 July 1971Deposition of SA Bernsen (Bechtel) on 710729 Re Specific Changes in Field Insp Manual & Palisade Qa/Qc Manual.Qc Manual Sections Re Field Welding Units & Sys,Welding Instruction & Const Organization EnclHydrostatic
Nondestructive Examination
Liquid penetrant
ML19329E7316 June 1973Deposition of Jl Bacon (CPC) on 730606 in Washington,D.C. Pp 1-3,6-9,11-12,14-20,25-28,30-37,42-44 & 55
ML19329E77215 May 1973Deposition of Ah Aymond (CPC) on 730515 in Jackson,Mi.Pp 164-74,183-85 & 202-04.Remarks from Jh Cambell 600719 Press Conference,Util 651203,680401,0819,1031,700106 & 0218 Memos & 651206 Ltr Encl
ML19330A10126 April 1977Supplemental Testimony to Initial 770324 Testimony Based on Central Area Reliability Data Which Has Now Been Changed. Util Must Depend on Interconnected Sys to Maintain Acceptable Reliability.Affidavit Encl
ML19330A12211 August 1971Sworn Testimony Re Technical Feasibility of Plant Location at Greater Distance from Residential & Populous Areas.Urges Analysis of Proposed Alternate Schemes to Determine Relative Merits
ML19330A1641 September 1972Proposed Corrections to Midland Hearing Transcript Per ASLB 720628 Order,Superseding 720602 Corrections
ML19331A16921 September 1971Deposition of Re Webb on 710921 in Franklin County,Oh Before ASLB
ML19331A17222 October 1971Deposition of OL Loucks on 711022 in Dane County,Wi Before ASLB
ML19331A38128 July 1977Errata Sheet for Util Proposed Transcript Corrections
ML19331A60417 May 1972Transcript Corrections for ASLB 720517 Hearing
ML19331A60718 May 1972Transcript Corrections for ASLB 720518 Hearing
ML19331A61322 May 1972Transcript Corrections for ASLB 720522 Hearing
ML19331A61823 May 1972Transcript Corrections for ASLB 720523 Hearing
ML19331A62124 May 1972Transcript Corrections for ASLB 720504 Hearing
ML19331A62525 May 1972Transcript Corrections for ASLB 720525 Hearing
ML19331A6302 June 1972Transcript Corrections for ASLB 720602 Hearing
ML19331B16914 September 1971Sworn Testimony Stating That Plant Site Choice Is Contrary to Past Prohibitions & Site Plans Must Be Abandoned in Favor of Alternative Power SourcesBoric Acid
ML19331B2596 June 1972Testimony of Ej Sternglass (Univ of Pittsburgh) on 720614 Re Synergism
ML19331B29627 July 1977Proposed Transcript Corrections
ML19343B00929 October 1980Transcript of 801029 Deposition of SA Afifi in Ann Arbor, Mi.Pp 1-123.Prof Qualifications Encl
ML19344A29815 July 1977Corrections to Testimony & cross-examination of R Timm. Consists of Spelling Errors & Wording Changes
ML19345E55014 January 1981Transcript of MT Davisson 810114 Deposition in Savoy,Il. Pp 1-147Safe Shutdown Earthquake
Earthquake
ML19345E55214 January 1981Transcript of RB Peck 810114 Deposition in Albuquerque,Nm. Pp 141-205Earthquake
ML19345E55413 January 1981Transcript of RB Peck 810113 Deposition in Albuquerque,Nm. Pp 1-140Earthquake
ML20002B13130 October 1980Transcript of SE Afifi 801030 Deposition in Ann Arbor,Mi. Pp 124-222
ML20002B13322 October 1980Transcript of TC Cooke 801022 Deposition in Midland,Mi. Pp 1-64Design basis earthquake
Earthquake
ML20004E41529 April 1981Vol 1 of Transcript of 810429 Meeting in Ann Arbor,Mi W/Util Design & Review Board Re Facility Ability to Achieve & Maintain Cold Shutdown.Pp 1-166
ML20004E41929 April 1981Vol 2 of Transcript of 810429 Meeting in Ann Arbor,Mi W/Util Design & Review Board Re Facility Ability to Achieve & Maintain Cold Shutdown.Pp 1-166.Supporting Documentation, Including Response to Board Action Items EnclHot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Design basis earthquake
Earthquake
Power Operated Valves
Fire Protection Program
ML20004E8504 June 1981Testimony of Gs Keeley Providing Sequential History of Events & Activities Re Soils Settlement Issues.List of Important Const Dates for Facility,Selected Soils Placement Activity & Affidavit Encl.Related Correspondence