Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML19224D368 | 14 May 1979 | Transcript of 790514 Deposition of as Klomparens in Midland,Mi.Pp 1-53 | |
ML19224D370 | 23 May 1979 | Transcript of 790523 Deposition of RR Renfrow in Atlanta,Ga. Pp 1-220 | |
ML19224D595 | 14 May 1979 | Transcript of 790514 Deposition of P Oreffice.Pp 1-75 | |
ML19224D598 | 14 May 1979 | Transcript of 790514 Deposition of DA Durand.Pp 1-120 | |
ML19224D601 | 22 May 1979 | Transcript of 790522 Deposition of Jg Temple.Pp 1-166 | |
ML19225A075 | 14 May 1979 | Transcript of 790514 Deposition of Jf Hanes.Pp 1-76 | |
ML19241B127 | 15 May 1979 | Transcript of 790515 Deposition of Lf Nute in Midland,Mi. Pp 1-204 | |
ML19250D407 | 22 January 1981 | Deposition of J Brammer on 810122 in Bethesda,Md Re Acceptable Plastic Analysis Methods Applicable to Buried Piping Sys | |
ML19326D132 | 28 February 1977 | Deposition of Wj Gunderson (FPC) Re Results of Review of Impact on Electric Svc Reliability W/ & W/O Plant | |
ML19329E219 | 6 June 1973 | Deposition of Jl Bacon (CPC) on 730606 in Washington,D.C. Pp 31-44 & 54-55.RA Jablon Affidavit Encl | |
ML19329E284 | 1 September 1978 | Deposition of Kl Baker (CPC) Before Mi Public Svc Commission Re Proposed time-of-day Rate Study.Pp 1-14.Proposed Sampling Schedule Encl | |
ML19329E289 | 1 September 1978 | Deposition of Jh Climer (CPC) Before Mi Public Svc Commission Re Proposed time-of-day Rate Study.Pp 1-9. Proposed Test Rates & Potential Savings from Specific Appliances Encl | |
ML19329E293 | 1 September 1978 | Deposition of Wj Jefferson (CPC) Before Mi Public Svc Commission Re Proposed time-of-day Rate Study.Pp 1-11.Time- of-day Usage Charts Encl | |
ML19329E598 | 12 October 1973 | Deposition of Jd Pace (Natl Economic Research Associates) on 731012.One Page | |
ML19329E642 | 5 November 1976 | Deposition of Gs Keeley (CPC) Re Project Status & Future Work Activities,Acrs Concerns,Delay Costs & Effects, & Cost Comparison of Operating V Abandoning of Plant | Boric Acid Ultimate heat sink Coatings Power Operated Valves Turbine Missile |
ML19329E646 | 5 November 1976 | Deposition of RA Wells (CPC) Re Review of Anticipated Environ Impact Due to Const Activity | |
ML19329E648 | 5 November 1976 | Deposition of Jg Temple (Dow Chemical Co) Re Contracts W/ Util.Mi Dept of Natural Resources Correspondence Re Vendor Violations of Air Quality Stds Encl | |
ML19329E651 | 5 November 1976 | Deposition of Sh Howell (CPC) Re Contract Changes Since CP Hearings & Util Objectives in Current Negotiations.Contracts W/Dow Chemical Co Encl | |
ML19329E652 | 5 November 1976 | Deposition of GL Heins (CPC) Re Availability of Reserve Capacity & Adequacy of Energy Supply 1981-84.Certificate of Svc Encl | |
ML19329E682 | 6 June 1973 | Deposition of Jl Bacon (CPC) on 730606 in Washington,Dc.Pp 1 & 6 Only Encl | |
ML19329E683 | 15 May 1973 | Deposition of Jl Bacon (CPC) on 730515 in Jackson,Mi.Pp 1, 220-23 & 250-1.JC Pollock Affidavit & Certificate of Svc Encl | |
ML19329E706 | 29 July 1971 | Deposition of SA Bernsen (Bechtel) on 710729 Re Specific Changes in Field Insp Manual & Palisade Qa/Qc Manual.Qc Manual Sections Re Field Welding Units & Sys,Welding Instruction & Const Organization Encl | Hydrostatic Nondestructive Examination Liquid penetrant |
ML19329E731 | 6 June 1973 | Deposition of Jl Bacon (CPC) on 730606 in Washington,D.C. Pp 1-3,6-9,11-12,14-20,25-28,30-37,42-44 & 55 | |
ML19329E772 | 15 May 1973 | Deposition of Ah Aymond (CPC) on 730515 in Jackson,Mi.Pp 164-74,183-85 & 202-04.Remarks from Jh Cambell 600719 Press Conference,Util 651203,680401,0819,1031,700106 & 0218 Memos & 651206 Ltr Encl | |
ML19330A101 | 26 April 1977 | Supplemental Testimony to Initial 770324 Testimony Based on Central Area Reliability Data Which Has Now Been Changed. Util Must Depend on Interconnected Sys to Maintain Acceptable Reliability.Affidavit Encl | |
ML19330A122 | 11 August 1971 | Sworn Testimony Re Technical Feasibility of Plant Location at Greater Distance from Residential & Populous Areas.Urges Analysis of Proposed Alternate Schemes to Determine Relative Merits | |
ML19330A164 | 1 September 1972 | Proposed Corrections to Midland Hearing Transcript Per ASLB 720628 Order,Superseding 720602 Corrections | |
ML19331A169 | 21 September 1971 | Deposition of Re Webb on 710921 in Franklin County,Oh Before ASLB | |
ML19331A172 | 22 October 1971 | Deposition of OL Loucks on 711022 in Dane County,Wi Before ASLB | |
ML19331A381 | 28 July 1977 | Errata Sheet for Util Proposed Transcript Corrections | |
ML19331A604 | 17 May 1972 | Transcript Corrections for ASLB 720517 Hearing | |
ML19331A607 | 18 May 1972 | Transcript Corrections for ASLB 720518 Hearing | |
ML19331A613 | 22 May 1972 | Transcript Corrections for ASLB 720522 Hearing | |
ML19331A618 | 23 May 1972 | Transcript Corrections for ASLB 720523 Hearing | |
ML19331A621 | 24 May 1972 | Transcript Corrections for ASLB 720504 Hearing | |
ML19331A625 | 25 May 1972 | Transcript Corrections for ASLB 720525 Hearing | |
ML19331A630 | 2 June 1972 | Transcript Corrections for ASLB 720602 Hearing | |
ML19331B169 | 14 September 1971 | Sworn Testimony Stating That Plant Site Choice Is Contrary to Past Prohibitions & Site Plans Must Be Abandoned in Favor of Alternative Power Sources | Boric Acid |
ML19331B259 | 6 June 1972 | Testimony of Ej Sternglass (Univ of Pittsburgh) on 720614 Re Synergism | |
ML19331B296 | 27 July 1977 | Proposed Transcript Corrections | |
ML19343B009 | 29 October 1980 | Transcript of 801029 Deposition of SA Afifi in Ann Arbor, Mi.Pp 1-123.Prof Qualifications Encl | |
ML19344A298 | 15 July 1977 | Corrections to Testimony & cross-examination of R Timm. Consists of Spelling Errors & Wording Changes | |
ML19345E550 | 14 January 1981 | Transcript of MT Davisson 810114 Deposition in Savoy,Il. Pp 1-147 | Safe Shutdown Earthquake Earthquake |
ML19345E552 | 14 January 1981 | Transcript of RB Peck 810114 Deposition in Albuquerque,Nm. Pp 141-205 | Earthquake |
ML19345E554 | 13 January 1981 | Transcript of RB Peck 810113 Deposition in Albuquerque,Nm. Pp 1-140 | Earthquake |
ML20002B131 | 30 October 1980 | Transcript of SE Afifi 801030 Deposition in Ann Arbor,Mi. Pp 124-222 | |
ML20002B133 | 22 October 1980 | Transcript of TC Cooke 801022 Deposition in Midland,Mi. Pp 1-64 | Design basis earthquake Earthquake |
ML20004E415 | 29 April 1981 | Vol 1 of Transcript of 810429 Meeting in Ann Arbor,Mi W/Util Design & Review Board Re Facility Ability to Achieve & Maintain Cold Shutdown.Pp 1-166 | |
ML20004E419 | 29 April 1981 | Vol 2 of Transcript of 810429 Meeting in Ann Arbor,Mi W/Util Design & Review Board Re Facility Ability to Achieve & Maintain Cold Shutdown.Pp 1-166.Supporting Documentation, Including Response to Board Action Items Encl | Hot Short Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Design basis earthquake Earthquake Power Operated Valves Fire Protection Program |
ML20004E850 | 4 June 1981 | Testimony of Gs Keeley Providing Sequential History of Events & Activities Re Soils Settlement Issues.List of Important Const Dates for Facility,Selected Soils Placement Activity & Affidavit Encl.Related Correspondence |