Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000225/2005003 | 4 June 1985 | Insp Rept 50-458/85-18 on 850225-0503.Deviation Noted: Ranges of Display Instrumentation for HPCS Flow & RHR Svc Water Flow Contrary to Table 7.5-1 of Fsar,Amend 11, Dtd Jan 1984 | |
IR 05000311/2004019 | 10 May 1985 | Insp Rept 50-458/85-22 on 850311-0419.No Violation or Deviation Noted.Major Areas Inspected:Maint Program,Test & Measurement Equipment,Surveillance Testing & Calibr Control Program,Design Changes & Mods & Document Control | Temporary Modification Fire Watch |
IR 05000311/2005017 | 1 August 1985 | Insp Rept 50-458/85-19 on 850311-0517.Violation Noted: Failure to Incorporate Engineering & Design Coordination Rept Info Into Drawings & Use External Historical Data in Evaluation of Suppliers | Squib Scaffolding |
IR 05000311/2008010 | 23 January 1986 | Insp Rept 50-458/85-09 on 850311-0810.Violations Noted: Failure to Adequately Check Calculations,Document & Verify Assumptions & Provide Basis for Design Input | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
IR 05000401/2007012 | 2 August 1985 | Notice of Violation from Insp on 850401-0712.Violation Noted:Failure to Assure Conformance of safety-related Structural Steel Welds W/Criterion X of App B to 10CFR50 & Aws Structural Welding Code Aws D 1.1-75 | |
IR 05000401/2008009 | 17 September 1985 | Insp Rept 50-458/85-29 on 850401-0809.Violation Noted: Failure to Assure Conformance of safety-related Structural Steel Welds W/Requirements of Aws D1.1-75 Structural Steel Welding Code | Loctite |
IR 05000415/2006027 | 15 August 1985 | Insp Rept 50-458/85-33 on 850415-0627.Violation Noted: Failure to Adequately Document Changes to Insp Rept Results | |
IR 05000458/1978005 | 22 September 1978 | Insp Rept 50-458/78-05 on 780905-08.No Noncompliance Noted. Major Areas Inspected:Previously Identified Unresolved Items & Const Deficiency Rept Re Nonconforming Rebar | |
IR 05000458/1982002 | 19 May 1982 | IE Insp Rept 50-458/82-02 on 820419-23.No Noncompliance Noted.Major Areas Inspected:Review of QA Program for Welding & Nondestructive Exam of safety-related Piping & Observation of Work for Subj Piping | |
IR 05000458/1982006 | 15 July 1982 | IE Insp Rept 50-458/82-06 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Previous Insp Findings,Qa Program Review & Work for Erection/Installation & Welding of safety-related Structural Steel & Supports | |
IR 05000458/1985027 | 3 June 1985 | Insp Rept 50-458/85-27 on 850401-04.No Violation or Deviation Noted.Major Areas Inspected:Implementation of Fire Protection Program & Compliance w/10CFR50,App R Re Safe Shutdown Per FSAR Commitments & SER Evaluation | Safe Shutdown Fire Barrier Emergency Lighting Fire Protection Program Fire Watch |
IR 05000458/1985032 | 5 August 1985 | Insp Rept 50-458/85-32 on 850624-28.No Violations or Deviations Noted.Major Areas Inspected:Licensee Radiation Protection Program,Tmi Action Items & Emergency Preparedness Activities | Loop seal Grab sample |
IR 05000458/1985036 | 19 June 1985 | Insp Rept 50-458/85-36 on 850506-10.No Violation or Deviation Noted.Major Areas Inspected:Training,Organization, Coordination W/Offsite Groups,Emergency Procedures & Emergency Response Facilities & Equipment | |
IR 05000458/1985037 | 29 May 1985 | Insp Rept 50-458/85-37 on 850506-10.No Violation or Deviation Noted.Major Areas Inspected:Correction of Deficiencies Previously Identified Per 10CFR50.55(e) | |
IR 05000458/1985038 | 17 July 1985 | Insp Rept 50-458/85-38 on 850513-17.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Test Witnessing,Preoperational Test Results Evaluation & TMI Action Items | |
IR 05000458/1985039 | 20 June 1985 | Insp Rept 50-458/85-39 on 850520-25.No Violation or Deviation Noted.Major Areas Inspected:Preoperational Test Performance & Results & Licensee Actions on Previous Insp Findings & 10CFR50.55(e) Items | |
IR 05000458/1985041 | 29 August 1985 | Insp Rept 50-458/85-41 on 850522-0712.No Violation or Deviation Noted.Major Areas Inspected:Followup on Previous Findings,Comparison of as-built Plant to FSAR Description, Verification of as-built Electrical Routing & Terminations | Safe Shutdown Fire Barrier Emergency Lighting Fire Watch |
IR 05000458/1985044 | 12 September 1985 | Insp Rept 50-458/85-44 on 850603-0726.No Violations or Deviations Identified.Major Areas Inspected:Open Significant Const Deficiencies Per 10CFR50.55(e) & Previous Insp Findings | Scram Discharge Volume Grace period |
IR 05000458/1985045 | 17 July 1985 | Insp Rept 50-458/85-45 on 850520-0603.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings & Site Tours | Temporary Modification |
IR 05000458/1985046 | 29 July 1985 | Insp Rept 50-458/85-46 on 850603-07.No Violations or Deviations Noted.Major Areas Inspected:Radwaste Mgt & Transportation Activities,Including Organization,Audits & Process Control Plan | Process Control Program |
IR 05000458/1985047 | 19 July 1985 | Insp Rept 50-458/85-47 on 850610-14.No Violations or Deviations Noted.Major Areas Inspected:Chemistry/ Radiochemistry Program,Including Organization,Staffing,Staff Qualifications,Facilities & Equipment & QA Program | |
IR 05000458/1985048 | 9 August 1985 | Insp Rept 50-458/85-48 on 850624-28.No Violations or Deviations Identified.Major Areas Inspected:Preoperational Test Results Evaluation & Operating Procedures | |
IR 05000458/1985050 | 28 August 1985 | Insp Rept 50-458/85-50 on 850624-29.No Violation or Deviation Noted.Major Areas Inspected:Alarm Stations, Security Sys Power Supply,Access control-personnel & Access control-packages.Details Withheld (Ref 10CFR73.21) | |
IR 05000458/1985052 | 23 August 1985 | Insp Rept 50-458/85-52 on 850708-12.No Violation or Deviation Noted.Major Areas Inspected:Emergency & Abnormal Operating Procedures,Ie Bulletin & post-TMI Action Plan Requirements Followup & Corrective Actions Taken | Fuel cladding |
IR 05000458/1985053 | 4 September 1985 | Insp Rept 50-458/85-53 on 850805-09.No Violation or Deviation Noted.Major Areas Inspected:Radiation Protection Training,Selected TMI Action Items,Chemistry Sample Stations,Radwaste Processing Sys & Environ Program | Grab sample Process Control Program |
IR 05000458/1985054 | 4 October 1985 | Insp Rept 50-458/85-54 on 850722-26 & 31-0802.No Violation or Deviation Noted.Major Areas Inspected: Preoperational Test Results Evaluation & IE Bulletin Followup | |
IR 05000458/1985055 | 13 September 1985 | Insp Rept 50-458/85-55 on 850715-19 & 29-0801.No Violation or Deviation Noted.Major Areas Inspected:Mgt Effectiveness, Security Organization,Records & Repts & Lock & Key Controls. Details Withheld (Ref 10CFR73.21) | |
IR 05000458/1985056 | 30 August 1985 | Special Insp Rept 50-458/85-56 on 850715-17.No Violations or Deviations Noted.Major Areas Inspected:Followup in Findings from Emergency Appraisal & 1985 Emergency Exercise | Siren |
IR 05000458/1985057 | 24 August 1985 | Insp Rept 50-458/85-57 on 850722-26.No Violation or Deviation Noted.Major Areas Inspected:Training Program, Chemistry/Radiochemistry Program,Facilities & Equipment & Administrative & Analytical Procedures | |
IR 05000458/1985058 | 23 August 1985 | Insp Rept 50-458/85-58 on 850722-26.No Violation or Deviation Noted.Major Areas Inspected:Tech Specs & Implementing Procedures | |
IR 05000458/1985059 | 17 October 1985 | Insp Rept 50-458/85-59 on 850819-23.Violation Noted: Improper Disposition of Nonconformance Repts Re Test Procedure Criteria | Fitness for Duty |
IR 05000458/1985060 | 9 October 1985 | Insp Rept 50-458/85-60 on 850909-13.No Violation or Deviation Noted.Major Areas Inspected:Deficiency Repts,Tmi Action Items & Fuel Load Witnessing | Shutdown Margin |
IR 05000458/1985061 | 15 October 1985 | Insp Rept 50-458/85-61 on 850823-25.No Violations or Deviations Noted.Major Areas Inspected:Allegations of Improprieties on Part of Certain Licensee Contractor &/Or Subcontractor Personnel | Liquid penetrant |
IR 05000458/1985063 | 24 October 1985 | Insp Rept 50-458/85-63 on 850923-27.No Violation or Deviation Noted.Major Areas Inspected:Followup of Various Open Items & License Conditions | Shutdown Margin |
IR 05000458/1985064 | 16 October 1985 | Insp Rept 50-458/85-64 on 850916-20.No Violation or Deviation Noted.Major Areas Inspected:Radwaste Mgt Controls, Training & Qualifications,Radwaste Startup & Liquid & Gaseous Waste Sys | |
IR 05000458/1985065 | 21 October 1985 | Insp Rept 50-458/85-65 on 850916-20.No Violation or Deviation Noted.Major Areas Inspected:Radiological Environ Monitoring Program,Including Organization & Mgt Controls, Meteorological Monitoring Program & QA Program | Grab sample Offsite Dose Calculation Manual |
IR 05000458/1985068 | 1 November 1985 | Insp Rept 50-458/85-68 on 850930-1003.No Violation or Deviation Noted.Major Areas Inspected:Quality Concerns Program,Asme Certification Program & Followup on Previous Insp Findings | Fitness for Duty Hydrostatic |
IR 05000458/1985070 | 21 October 1985 | Insp Rept 50-458/85-70 on 851002-03.No Violation or Deviation Noted.Major Areas Inspected:Licensee Actions to Resolve OL Precriticality Conditions,Including Plant Air Flow Characteristics | |
IR 05000458/1985072 | 2 December 1985 | Insp Rept 50-458/85-72 on 851009-11.No Violation or Deviation Noted.Major Areas Inspected:Emergency Procedures Appraisal Findings Identified in Insp Rept 50-458/84-34 | |
IR 05000458/1985079 | 10 January 1986 | Insp Rept 50-458/85-79 on 851202-06.No Violation or Deviation Noted.Major Areas Inspected:Startup Test Procedure Review (Turbine Trip) & Startup Test Witnessing | |
IR 05000458/1985082 | 9 January 1986 | Insp Rept 50-458/85-82 on 851216-20.Violation Noted: Electronic Calibr on Primary Containment Area Radiation Monitor Only Included Every Other Decade Range Between 0 & 100% Full Scale | |
IR 05000458/1986007 | 5 May 1986 | SALP Rept 50-458/86-07 for Jan 1985 - Jan 1986.Overall Performance Indicates High Level of Dedication to Nuclear Safety & High Degree of Technical Competence | Fitness for Duty Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Squib Emergency Lighting Scram Discharge Volume Process Control Program Systematic Assessment of Licensee Performance Fire Protection Program |
IR 05000458/1986012 | 29 May 1986 | Insp Repts 50-458/86-12 & 50-458/86-18 Cancelled | |
IR 05000458/1986017 | 23 May 1986 | Partially Withheld Insp Rept 50-458/86-17 on 860331-0404 & 0502 (Ref 10CFR73.21).Violations Noted Re Vital Area Physical Barriers & Personnel Access Control | |
IR 05000458/1986021 | 9 June 1986 | Insp Rept 50-458/86-21 on 860512-16.No Violation or Deviation Noted.Major Areas Inspected:Licensed Operator Training & Nonlicensed Staff Training | |
IR 05000458/1986023 | 19 August 1986 | Insp Rept 50-458/86-23 on 860615-0731.No Violations or Deviations Noted.Major Areas Inspected:Evaluation of Startup Test Results,Operational Safety Verification,Safety Sys Walkdown,Maint Witnessing & Surveillance Witnessing | |
IR 05000458/1986024 | 21 October 1986 | Insp Rept 50-458/86-24 on 860818-22.Deviation Noted:Failure to Verify Certain Abnormal Operating Procedures | |
IR 05000458/1986025 | 8 August 1986 | Insp Rept 50-458/86-25 on 860721-25.Violation Noted:Failure to Follow Procedures.Deficiencies Noted Re Dose Assessment Training & Equipment | |
IR 05000458/1986026 | 19 December 1986 | Insp Rept 50-458/86-26 Canceled | |
IR 05000458/1986027 | 16 October 1986 | Insp Rept 50-458/86-27 on 860801-0915.Violations Noted: Failure to Meet Electrical Spec Requirements & Failure to Follow Surveillance Test Procedure | Safe Shutdown Half scram Ultimate heat sink Coast down |