Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateTitleTopic
A07596, Torsiograph Test of Emergency Diesel Generator 1DG2 at Comanche Peak Steam Electric Station28 February 1985Torsiograph Test of Emergency Diesel Generator 1DG2 at Comanche Peak Steam Electric Station
ML19327A94031 July 1989Final Rept, Reactor Containment Bldg Integrated Leakage Rate Test.
ML20012E19423 March 1990Cycle 1 Startup Physics Tests Control Rod Worth Predictions Utilizing TU Electric Control Rod Swap Methodology.
ML20039A16127 October 1981Fire Qualification Test of Protective Envelope Sys.Fire Barrier
Coatings
Earthquake
Fire Protection Program
ML20041E35630 November 1981Model Testing of Recirculation Containment Sump. One Oversize Figure Encl.Aperture Card Is Available in PDR
ML20044B55929 April 1992Toxicological Evaluation of Combustion Products from Thermal Barrier Matl Decomposed Under Flaming & Nonflaming Conditions, Rept of Test Fr 3987
ML20059F50427 August 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (Three 24 Inch Cable Tray Assemblies)
ML20059F51123 August 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (12 Inch Cable Tray & 2 Inch Conduit)Fire Barrier
Fire Protection Program
ML20059F52327 August 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (24 Inch Cable Tray Assembly W/2 Inch Diameter & 1-1/2 Inch Diameter Air Drop)Fire Barrier
Fire Protection Program
ML20059F5284 October 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (Box Design Air Drop from Two Nested 24 Inch Cable Tray Assemblies)Fire Barrier
Fire Protection Program
ML20059F5344 October 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (Flex-Blanket Wrapped Cables Laid in 36 Inch Cable Tray Assembly)Fire Barrier
Commercial Grade Dedication
Temporary Modification
Fire Protection Program
ML20062D89512 November 1990Cycle 1 Startup Rept
ML20067D21514 January 1994First Periodic Reactor Containment Bldg Integrated Leakage Rate Test Final Rept, for Comanche Peak Ses Unit 1
ML20073S78631 December 1983Reactor Containment Bldg Unit 1 Preoperational Integrated Leak Test,1983
ML20080A24631 July 1983Addendum to Preoperational Integrated Leak Rate Test
ML20094N67910 August 1984Radiation Analysis of Barton Model 288A Differential Pressure Indicating Switch for Texas Utils Generating Co
ML20107A97331 December 1984Reactor Containment Bldg Unit 1 Preoperational Type B & C Local Leak Rate Test
ML20112G40630 May 1996CPSES Unit 2 Cycle 3 Startup Rept
ML20126C83630 September 1992Reactor Containment Building Integrated Leakage Rate Test for Comanche Peak Steam Electric Station,Unit 2 Final Rept
ML20128G99813 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (12 Inch Tray)Fire Barrier
ML20128H01813 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (30 Inch Tray W/Tee)
ML20128H03111 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (Two 3 Inch Conduits W/Junction Boxes)Fire Barrier
Fire Protection Program
ML20128H05213 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (3/4 Inch,1-1/2 Inch & 2 Inch Conduits)Fire Barrier
Commercial Grade Dedication
Fire Protection Program
ML20128H0684 November 1992Fire Endurance Test of Thermolag 330-1 Fire Protective Envelope (36 Inch Tray W/Tee)Fire Barrier
ML20128H07713 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (30 Inch Tray)Fire Barrier
ML20128H0925 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (3/4 Inch,3 Inch & 5 Inch Conduits W/Radial Bends)
ML20128H1027 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (Two 3 Inch Conduits W/Junction Boxes)
ML20128H11213 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (24 Inch Tray W/Tee)
ML20128H11914 January 1993Fire Endurance Test of Thermo-Lag 330-1 Fire Protective Envelope (24 Inch Tray W/Air Drops)Fire Barrier
Fire Protection Program
ML20138N86126 January 1978Compatibility of RES X W/Nutec 11S SurfacerCoatings
ML20138N86830 April 1978Effects of 'Mudcracking' on DBA Performance of Nutec 11SCoatings
ML20138N87231 December 1977Nutec 11/Reactic 1201 DBA Per Bechtel CP 956Boric Acid
Coatings
ML20138N8885 August 1977Compatibility of Burkes Form Release to Imperial Concrete Coating SysCoatings
ML20138N9949 May 1978LOCA Test of Svc Topcoated W/Phenoline 305 FinishCoatings
ML20138P01411 April 1978LOCA Amercoat D-6/Phenoline 305 Finish & Comanche Peak LOCA FSAR Curve, Final ReptBoric Acid
Coatings
ML20138P45519 April 1984Elcometer Adhesion Tests Nutec Concrete Coating Repair Sys 11S/1201/11S/1201 11S/1201/11/1201. Related Documentation EnclCoatings
ML20148F64819 April 1984Test Rept,Shear & Tension Loading of Richmond Inserts 1 1/2-inch Type EC-6W,1-inch Type EC-2W
ML20151E46913 July 1988Civil/Structural Tests Re Hilti Expansion Anchors Installed in Coredrilled Holes & Richmond Inserts W/Partial Bolt Engagements
ML20155J80731 March 1988Final Summary Rept Comanche Peak Conduit Tests, Technical ReptSafe Shutdown
Safe Shutdown Earthquake
Earthquake
ML20195D86831 December 1983Reactor Containment Bldg Unit 1 Preoperational Integrated Leak Rate Test. Related Info Encl
ML20197F83231 July 1977Cable Tray Fire Tests
ML20198L40629 October 1982Multifrequency Eddy Current Exam of Containment Spray HX Tubes,Comanche Peak Unit 1,Train a & B & Unit 2,Train A. Vol 1:Baseline Exam Rept
ML20206N47211 December 1981Electrical Penetration Assembly:Leak Rate Test ReptLoctite
ML20206N50812 December 1981Electrical Penetration Assembly:Leak Rate Test ReptLoctite
ML20206N52123 December 1981Electrical Penetration Assembly:Leak Rate Test Rept
ML20207F35125 February 1999Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical CircuitsFire Barrier
Fire Protection Program
ML20210C80328 February 1987Rev 0 to Comanche Peak Steam Electric Station Cable Tray Sys Analysis/Test CorrelationEarthquake
ML20210C89125 February 1987Rev 1 to Thermal Load Evaluation
ML20210D13517 February 1987Vol 1 of Book 24 to Cth Post-Test Analysis Correlation
ML20210D16531 January 1987Rev 0 to Comanche Peak Cable Tray Tests, Final Summary ReptSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
Liquid penetrant
Reverse polarity