Electrical Penetration Assembly:Leak Rate Test Rept
ML20206N472
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/11/1981
From: Beck J, Jennifer Davis
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To:
Shared Package
ML20206N354 List:
References
FOIA-86-270, FOIA-86-A-87 NUDOCS 8607010463
Download: ML20206N472 (6)


Text

.

((# /

-f' ELECTRICAL PENETRATION ASSEMBLY LEAK RATE TEST REPORT UNIT NO.

/

EPA NO. /d 7 8 OATE / 62 /

((/

~

TIME PRESSURE TEMPERATURE Yloo Yb 0

$,' 0 0

??

O ma a

na i

a

/

I f

I l

/

W AVERAGE: / ##d M hNb TESTED BY:

/-

)ir4N b

QC WITME :

/

b PERF0P.*1 TESTING IN CORDANCE WITH:

N N8Ad3 Current Revision of Brown & Root Instruction EEI-9 and Gibbs & Hill Specification 2323-ES-12 NOTE: Compare both individual heurly readings and average of the hourly readings. Report excessive leak rates A to Electrical Engineering.

-Ti.on : EE 8t-/9& 93b I b

B6070'10463 860624 FDR FOIA CARDE86-A-87 PDR

OF ERM :0. T h,'.. c i.i. M-l a L I

@ EQUIPMENT NO.

@ UNIT NO. @CUANTITY @ pant C G t,'S T R U CT I O N

~

er s

1 1

IRAVELER NO.

/E 7'?

EE -31u n -9301 G7 REFERENCE DRAWINGS v

F1-0601-07 ACTlWTY D ~SCRIPTIONPenetration Assomblins installation

@t SYSTEM Electrica

@ LOCATIONSafeauard (3uildina 790'-6" 9301.

l SPEC / PROC 1ENG. INSTR.

/ 2 / / EM'/'

- DEPT._ #4 /#M' 23?3-ES-l?

EPARED BY_

- N'Ou DATE

/

a b 7' % ~ - k D AT E _ / > / ' J'

! VIEWED BY_

A' '/'

ARMS 2

M //7 DATE

l REVIEW -

INDEXED ^' " _

MG ANI

=

CONSTR 4

.NO oEPT. OPERATION D AT E:

a) Dwgs. received under CP-460 b.

I

,Q)

NOTE #1:

b) G&H Spec. 2323-ES-100, a 2323-ES-12

\\'

123-2101 & 123-2098.

Install-1 9

c) Amphenol Sams Documentsation operation and maintenance instruc

{

l i i

s k h d) Amphenol Sams Document 123-2245 Rev. A.

Do not proceed. /; j N e

An asterisk (*) indicates a QC hold point.

t NOTE #2:

without OC acceptance of operation._

D Storage and maintenance requirements as described in the

~o 1 '.

Equipment Maintenance Record shall be enforced until Opera,

. 4) j df NOTE #3:

? Q "5C" of this traveler is performed.

t tion 110.

l ]IJ it is not necessary for not-related operations to follow a MOTE e4:

progressive sequential order.

Select the correct penetration assembly by utilizing the tag number b

shown on the name plate which is located on the headed plate.

1 Elect Unit *1 E.P. A. 's will have a tag number such as 1E-48 and

t *2 E.P. A. 's will have a tag number such as 2E-48.

QC(V)

NOTE:

Un Location of the penetration assemblies shall be determined by using the latest construction issue of drawings.

fLA i

Unpacking Electrical Penetration y//

5N' 2

Elect 1/v /

Extreme caution shall be used in dismantling the crate.

Pry the crate apart instead of using a hammer, so as toDo not use the e f)C(V) CAUTIO*1:

avoid damage to equipment inside.

h, m_ent as a levering device.

f t if a framework exists, dismantle it being extremely cautious as to d

avoid damaging the wiring or the assembly in~ side, y

2a Elec y

hN P,emove the plastic protective cover.

O2/n,ty\\%D 2b c

t At this time, unbolt the header plate from the cradle which it' is

/M f4A

'b/p ;f G 4

2c Elec Studs, nuts and washers used to secure all E.P.A.'s to theThese items (j

QC(V) resting on.

UOTE:

q cradle are not to be thrown away.

in attaching the header plate to the weld neck flange.

t s r. :. n v..c r. sr u.m. e.. r.m :. t :.. t a n i m en. i v n I

TRAVELER NO.

ACTIVITY DESCRIPTION E E-81 -2 M -9301 Electrical Penetration Assemblies Installation PAGE 2 p,j c

PREPARED BY U //. A DATE

/~2ll7/A/

REVIEWED BY k/M 1[a ~75h'o d/

DATE NI/NF/

M/A ANI REVIEW A//A DATE cA/cc oP. No.

DEPT.

OPERATION CoNSTR ENG.

ANI 2d Elect Support rods and support plates are assembled to the header plate w

g on all penetration assemblies by the supplier prior to shipment.

zgD QC(V) Check that all support rods are securely threaded into the header 7:~g plate.

Check all hex nuts to make sure they are tight.

(Tighten as necessary).

2e Elect All cable ends shall be sealed by using Heat Shrinkable end caps ory y

scotch tape 33 (or equal) tape to prevent entrance of moisture.

g.22 51 9 QC(V)

Visually check all cables for damage to the insulation which might have occured during shipment.

3a Elect Wipe raised face of flange with clean non-abrasive rag saturated with commercial Methyl Ethyl Ketone (MEK), rub vigorously and allow /M CLA QC(V) to dry, e42 + ryi,, l CAUTION:

Do not allow smoking or open flames in the area while usir g MEK.

3b Elect Thoroughly wash raised surface of flange using tap water and a clear ca non-abrasive rag.

Rub vigorously to remove all traces of rust 2/2y QC(V inhibitor and wipe clean.

Remove all traces of rust, if any is four d

,k,,,

y g

g per traveler EE79-033-0200.

3c Eleci Using a clean non-abrasive cloth, clean the raised sealing surface p N

with 1% sodium Hydroxide (Na0H) solution.

t QC(V:

CAUTION:

Do not allow solution to contact the primed or painted fz2g 'Q surfaces.

Operator must wear gloves (vinyl perferred)

I and splash proof safety glasses.

3d Elec1 Thoroughly rinse surface with tap water and immediately wipe dry.

[Pt gtA QC(V:

//6e/g II/f/h 3e Eleci Imediately clean surface with an isopropanol saturated clean sof t pg yzA QC(V: cloth.

,7,

fyyj 3f Elect Allow to dry for 20 minutes.

Inspect for any evidence of moisture, p CLA.

QC(V; dust, etc.

Surface must be clean and dry.

g CoatraisedsurfacewithDowCorning97hlubricant.

39 p

NOTE: Weld neck flange is now ready to accept the penetration assembly.

4 Elect Electrical Penetration Assembly knstallation QC(V' CAUTION:

Use care when uncoiling cables. Do not pull against the M

CLA module terminations in order to minimize the amount of

'N h b/U

/

I tension and strain on the module terminations.

Cables i

must be supported at all times.

4

1 o

..........,....... m t. -.. s. a i o w r.

xn

. r. AVELER NO.

ACTIVITY DESCRIPTION j

EE m -9301 Electrical Penetration Assemblies Installation PAGE._.3 0F__ l

-t'MEPARED BY N

b OATE

/7"//7/8/

N*/a SI Toi hk OATE /2 //MP/

7.EVIEWED BY

/

ANI REVIEW

//d*

DATE

/2/ -

A QA/QC No. DEPT.

ofpt4TioNu _

CoNSTR ENG.

AN mv

.ou

, v v., u u y u. yo.s. 6 niw ruuncu niwu t u u.. c i uw u isua pcuc u u-tion will contain materials for the installation.

The Dow Corning 971V lubricant is located in electrical penetration crate #2E-32.

These 8 02. containers should be sufficient for both Unit #1 & #2 installation.

-a Elect Pass the two (2) large o-ring seals over the inboard cables up to th@

(24A QC(V) inboard side of the header ;. ate.

1%yg 17/a/

o Elect Attach hoist hooks to factory eyebolts and raise the entire penetra-tion assembly and the fixture to the nozzle location.

If adequate space above penetration will not allow use of hoist, transfer pene-tration to carriage and use carriage for support and location of penetration during installation.

QC(V) CAUTION: The inboard cable support fixture is attached to the headep QA plate and must be fully supported at all times.

p gy NOTE:

If gauge reads zero (0) Electrical Engineering.

Do not proceed.

Elect Maneuver the penetration assembly to a location where the cables can feed into the nozzle.

W QC(V)

NOTE:

l2/47g Some penetrations may require rotation of gauges to aid in

    1. /p/p installation of penetration assembly through nozzle.

-d Elect Feed the inboard cables from the tank exterior.

M b^

QC(M) b/yf If/tif;;

-e Elect Depressurize the penetration assembly by removing the screw and sealing washer located between the o-ring grooves, as required by y

t2tA QC(V) caution tag.

/2's'M/ U/db1 I

a f

Elect Clean the header plate fKce on the o-ring groove side with a lint free, non-abrasive cloth using commerical grade Methyl Ethyl Ketone y gtA (MEK) in order to remove all foreign substance and allow to dry.

gb */Ji gy,Ybl QC(V)

CAUTION:

Do not allow smoking or open flames in the area while using MEK.

-g Elect Wipe the 0-ring seals with a clean cloth and coat with a light film P CzA of Dow Corning 971V lubricant and place the 0-rings in their appro-QC(V) priate grooves in the header plate.

/9224, f?/gN

-n Elect Continue to feed the assembly into the nozzle until the header plate pJ QC(V) makes contact.with the flange face.

I{'lA r

Ag, i

Elect Prior to contact, check for correct placement-of the two (2) o-rings.

QC(V) CAUTION: Be extremely careful not to dent or nick flange face or

[,

the header plate face.

In mating the h ader plate and the 'It2/g; J

l weld neck flange, make sure open bolt' holes line up.

[/I

.,...........u..-..v:.

.~.vve..:r. w n::nu,s iva

~~h AVELER NO.

ACTIVITY DESCRIPTION EE 234 -9301 Electrical Penetration Assemblies Installation PAGE bF _

.--REPARED BY

/

DATE

/ZIF[MY nEVIEWED BY kNetdl'7O~7t d,

DATE

/Ek/NdY ANI REVIEW M/h DATE A

QA/QC SD No. DEPT.

OPERATION coNSTR ENG.

ANI 4j Elec1 Install all studs in the bolt holes and add nuts and washers.

Tigh1 e7 M QC(V nuts finger tight until all are installed.

% Al Id'z/j g 4k Elec1 Tighten all nuts using a " diametrically opposite" sequence to an p

CLA QC(V initial torque of approximetely 25 ft. lbs.

p/,9 41 Elect Tighten all nuts using a " diametrically opposite" sequence to an QC(V final torque of 100(+10,-10) ft lbs.

Torque wrench #$1C/7B

/?#48

]

Cal. due date :&K W ( -

4~uw 4m Elec< Field shall provide somo type of mechanism to support the cables f

on both sides of tne vessel wall.

Refer to caution note under

//gpj ff 2

item 5.

QC(V' Field shall also provide a method of enclosing both ends of assembl y for r'otection against damage during construction.

4n Elec-Remove hoist hook from eyebolt and any other rigging equipment with P care so as not to strike the valves or gauge or other components.

QC(V' NOTE: Repack the loose equipment kit with the unused materials and,24*/$ y j seal the carton with tape.

Write the corresponding E.P.A.

tag number on all cartons and fill out a return to warehouse form attention Carl Parr.

5 Elec1 Condensation Removal /Repressurization Irmiediately af ter E.P. A. is completely installed perform the g

g QC)V following:

b /H Remove the 1 inch pipe plug from the outer surface of the header the system thoroughly with 10-15 psig dry nitrogen for a b

M 5b Elec u

QC(V minimum of 30 seconds to assure removal of condensation.

NOTE: Dry nitrogen utilized for pressurizing the penetration

/722fg assemblies shall be dew point of -76 F.

5c Elect Reclose the two gauge valves and replace plug.

g g

l QC(V) NOTE: When replacing threaded fittings -gauges,-or valv6s, a thread /

sealant such as " Loctite" number 722.by; Loctite Corpor,ati,on, 'b M

Newington, Conn. or equivalent shpih be used'.

'~

/8(

l Sd Elect Pressurizeassemblyto45psigwithdrykn[trogen(Dewpoint-76).

N QC(V) f s)

U.

s '. l '-:

f Se Elect Perform a leak rate test in accordance wikh proced.ure EEI-9.

//w QC(V) t i

irg j

i Sf Elect Record all data and submit to Electrical Engineering.

QC(V) p 6)

....:. a. u w sur eu e m. ;u r.

n u v :.. n. un, m ur.i, ve.

TRAVELER NO.

ACTIVITY DESCRIPTION EE-81-251-9301 Electrical Penetration Assemblies InstallatME _5 OF !

PREPARED BY [ [ ((/

DATE

/7//v/8/

REVIEWED BY hkx tlNt E

/s1.nza,

DATE

/2 /EN ANI REVIEW AI/A DATE il/A cA/oc OP. N3. DEPT.

OPERATION CONSTR ENG.

ANI Sg Ilect After completion of leak rate test repressurize the penetration UC(V) assembly to 60 psig.

  1. 'l5f 32%

/2 Sh I. lect From this point on the Electrical Penetration Assemblies shall be I)C(V) maintained in accordance with the equipment maintenance record.

p g

,'l13,9 After completion of this Traveler return to the Electrical Engineering I

Department, attention Bill Ross.

Upon Engineering review, issue to Ouality Engineering.

n/aW bp ih*i' Eilf-l l

l l

h 1

t I

.